918 resultados para Alcohol Safety Action Program--Tampa, Fla.
Resumo:
INTRODUCTION Rilpivirine (RPV) has a better lipid profile than efavirenz (EFV) in naïve patients (1). Switching to RPV may be convenient for many patients, while maintaining a good immunovirological control (2). The aim of this study was to analyze lipid changes in HIV-patients at 24 weeks after switching to Eviplera® (emtricitabine/RPV/tenofovir disoproxil fumarate [FTC/RPV/TDF]). MATERIALS AND METHODS Retrospective, multicentre study of a cohort of asymptomatic HIV-patients who switched from a regimen based on 2 nucleoside reverse transcriptase inhibitors (NRTI)+protease inhibitor (PI)/non nucleoside reverse transcriptase inhibitor (NNRTI) or ritonavir boosted PI monotherapy to Eviplera® during February-December, 2013; all had undetectable HIV viral load for ≥3 months prior to switching. Patients with previous failures on antiretroviral therapy (ART) including TDF and/or FTC/3TC, with genotype tests showing resistance to components of Eviplera®, or who had changed the third drug of the ART during the study period were excluded. Changes in lipid profile and cardiovascular risk (CVR), and efficacy and safety at 24 weeks were analyzed. RESULTS Among 305 patients included in the study, 298 were analyzed (7 cases were excluded due to lack of data). Men 81.2%, mean age 44.5 years, 75.8% of HIV sexually transmitted. 233 (78.2%) patients switched from a regimen based on 2 NRTI+NNRTI (90.5% EFV/FTC/TDF). The most frequent reasons for switching were central nervous system (CNS) adverse events (31.0%), convenience (27.6%) and metabolic disorders (23.2%). At this time, 293 patients have reached 24 weeks: 281 (95.9%) have continued Eviplera®, 6 stopped it (3 adverse events, 2 virologic failures, 1 discontinuation) and 6 have been lost to follow up. Lipid profiles of 283 cases were available at 24 weeks and mean (mg/dL) baseline vs 24 weeks are: total cholesterol (193 vs 169; p=0.0001), HDL-c (49 vs 45; p=0.0001), LDL-c (114 vs 103; p=0.001), tryglycerides (158 vs 115; p=0.0001), total cholesterol to HDL-c ratio (4.2 vs 4.1; p=0.3). CVR decreased (8.7 vs 7.5%; p= 0.0001). CD4 counts were similar to baseline (653 vs 674 cells/µL; p=0.08), and 274 (96.8%) patients maintained viral suppression. CONCLUSIONS At 24 weeks after switching to Eviplera®, lipid profile and CVR improved while maintaining a good immunovirological control. Most subjects switched to Eviplera® from a regimen based on NNRTI, mainly EFV/FTC/TDF. CNS adverse events, convenience and metabolic disorders were the most frequent reasons for switching.
Resumo:
The administration of selective serotonin reuptake inhibitors (SSRIs) typically used as antidepressants increases alcohol consumption after an alcohol deprivation period in rats. However, the appearance of this effect after the treatment with selective noradrenaline reuptake inhibitors (SNRIs) has not been studied. In the present work we examined the effects of a 15-d treatment with the SNRI atomoxetine (1, 3 and 10 mg/kg, i.p.) in male rats trained to drink alcohol solutions in a 4-bottle choice test. The treatment with atomoxetine (10 mg/kg, i.p.) during an alcohol deprivation period increased alcohol consumption after relapse. This effect only lasted one week, disappearing thereafter. Treatment with atomoxetine did not cause a behavioral sensitized response to a challenge dose of amphetamine (1.5 mg/kg, i.p.), indicating the absence of a supersensitive dopaminergic transmission. This effect is markedly different from that of SSRI antidepressants that produced both long-lasting increases in alcohol consumption and behavioral sensitization. Clinical implications are discussed.
Resumo:
BACKGROUND Based on the mechanism of action, combining somatostatin analogues (SSAs) with mTOR inhibitors or antiangiogenic agents may provide synergistic effects for the treatment of patients with neuroendocrine tumours (NETs). Herein, we investigate the use of these treatment combinations in clinical practice. METHODS This retrospective cross-sectional analysis of patients with NETs treated with the SSA lanreotide and targeted therapies at 35 Spanish hospitals evaluated the efficacy and safety of lanreotide treatment combinations in clinical practice. The data of 159 treatment combinations with lanreotide in 133 patients was retrospectively collected. RESULTS Of the 133 patients, with a median age of 59.4 (16-83) years, 70 (52.6 %) patients were male, 64 (48.1 %) had pancreatic NET, 23 (17.3 %) had ECOG PS ≥2, 41 (30.8 %) had functioning tumours, 63 (47.7 %) underwent surgery of the primary tumour, 45 (33.8 %) had received prior chemotherapy, and 115 (86.5 %) had received prior SSAs. 115 patients received 1 lanreotide treatment combination and 18 patients received between 2 and 5 combinations. Lanreotide was mainly administered in combination with everolimus (73 combinations) or sunitinib (61 combinations). The probability of being progression-free was 78.5 % (6 months), 68.6 % (12 months) and 57.0 % (18 months) for patients who only received everolimus plus lanreotide (n = 57) and 89.3 % (6 months), 73.0 % (12 months), and 67.4 % (18 months) for patients who only received sunitinib and lanreotide (n = 50). In patients who only received everolimus plus lanreotide the median time-to-progression from the initiation of lanreotide combination treatment was 25.8 months (95 % CI, 11.3, 40.3) and it had not yet been reached among the subgroup of patients only receiving sunitinib plus lanreotide. The safety profile of the combination treatment was comparable to that of the targeted agent alone. CONCLUSIONS The combination of lanreotide and targeted therapies, mainly everolimus and sunitinib, is widely used in clinical practice without unexpected toxicities and suggests efficacy that should be explored in randomized prospective clinical trials.
Resumo:
BACKGROUND Fragile X syndrome (FXS) is an inherited neurodevelopmental condition characterised by behavioural, learning disabilities, physical and neurological symptoms. In addition, an important degree of comorbidity with autism is also present. Considered a rare disorder affecting both genders, it first becomes apparent during childhood with displays of language delay and behavioural symptoms.Main aim: To show whether the combination of 10 mg/kg/day of ascorbic acid (vitamin C) and 10 mg/kg/day of α-tocopherol (vitamin E) reduces FXS symptoms among male patients ages 6 to 18 years compared to placebo treatment, as measured on the standardized rating scales at baseline, and after 12 and 24 weeks of treatment.Secondary aims: To assess the safety of the treatment. To describe behavioural and cognitive changes revealed by the Developmental Behaviour Checklist Short Form (DBC-P24) and the Wechsler Intelligence Scale for Children-Revised. To describe metabolic changes revealed by blood analysis. To measure treatment impact at home and in an academic environment. METHODS/DESIGN A phase II randomized, double-blind pilot clinical trial. SCOPE male children and adolescents diagnosed with FXS, in accordance with a standardized molecular biology test, who met all the inclusion criteria and none of the exclusion criteria. INSTRUMENTATION clinical data, blood analysis, Wechsler Intelligence Scale for Children-Revised, Conners parent and teacher rating scale scores and the DBC-P24 results will be obtained at the baseline (t0). Follow up examinations will take place at 12 weeks (t1) and 24 weeks (t2) of treatment. DISCUSSION A limited number of clinical trials have been carried out on children with FXS, but more are necessary as current treatment possibilities are insufficient and often provoke side effects. In the present study, we sought to overcome possible methodological problems by conducting a phase II pilot study in order to calculate the relevant statistical parameters and determine the safety of the proposed treatment. The results will provide evidence to improve hyperactivity control and reduce behavioural and learning problems using ascorbic acid (vitamin C) and α-tocopherol (vitamin E). The study protocol was approved by the Regional Government Committee for Clinical Trials in Andalusia and the Spanish agency for drugs and health products. TRIAL REGISTRATION ClinicalTrials.gov Identifier: NCT01329770 (29 March 2011).
Resumo:
This document provides the planned investments in Iowa's transportation system for the five-year period of 2003-2007. It encompasses aviation, railroads, rivers, trails, state parks and institutional roads, roadways, and public transit.
Resumo:
Critics of the U.S. proposal to the World Trade Organization (WTO) made in October 2005 are correct when they argue that adoption of the proposal would significantly reduce available support under the current farm program structure. Using historical prices and yields from 1980 to 2004, we estimate that loan rates would have to drop by 9 percent and target prices would have to drop by 10 percent in order to meet the proposed aggregate Amber Box and Blue Box limits. While this finding should cheer those who think that reform of U.S. farm programs is long overdue, it alarms those who want to maintain a strong safety net for U.S. agriculture. The dilemma of needing to reform farm programs while maintaining a strong safety net could be resolved by redesigning programs so that they target revenue rather than price. Building on a base of 70 percent Green Box income insurance, a program that provides a crop-specific revenue guarantee equal to 98 percent of the product of the current effective target price and expected county yield would fit into the proposed aggregate Amber and Blue Box limits. Payments would be triggered whenever the product of the season-average price and county average yield fell below this 98 percent revenue guarantee. Adding the proposed crop-specific constraints lowers the coverage level to 95 percent. Moving from programs that target price to ones that target revenue would eliminate the rationale for ad hoc disaster payments. Program payments would automatically arrive whenever significant crop losses or economic losses caused by low prices occurred. Also, much of the need for the complicated mechanism (the Standard Reinsurance Agreement) that transfers most risk of the U.S. crop insurance to the federal government would be eliminated because the federal government would directly assume the risk through farm programs. Changing the focus of federal farm programs from price targeting to revenue targeting would not be easy. Farmers have long relied on price supports and the knowledge that crop losses are often adequately covered by heavily subsidized crop insurance or by ad hoc disaster payments. Farmers and their leaders would only be willing to support a change to revenue targeting if they see that the current system is untenable in an era of tight federal budgets and WTO limits.
Resumo:
The Weatherization Assistance Program is a low-income energy efficiency program administered by the Department of Energy (DOE). Its purpose is to make the homes of low-income clients more energy efficient, thereby reducing the households’ energy bills. The program also improves the health and safety of low-income homes. The energy efficiency and health and safety work is done using the most advanced technologies and testing protocols available in the housing industry. States administer the program in accordance with DOE rules and regulations.
Resumo:
The Low-Income Home Energy Assistance Program (LIHEAP) and Weatherization Program Interim Study Committee was created by the Legislative Council and charged to review issues involving the Low-Income Home Energy Assistance Program (LIHEAP) and Weatherization Program including financial assistance, the application and intake processes, the community action agencies' assessment and resolution proposal, and whether to involve the Department of Human Services in the administration of the programs to enable low-income persons to access additional assistance programs through a single location.
Resumo:
Objectives: The aim of this study was to compare specificity and sensitivity of different biological markers that can be used in a forensic field to identify potentially dangerous drivers because of their alcohol habits. Methods: We studied 280 Swiss drivers after driving while under the alcohol influence. 33 were excluded for not having CDT N results, 247 were included (218 men (88%) and 29 women (12%). Mean age was 42,4 (SD:12, min: 20 max: 76). The evaluation of the alcohol consumption concerned the month before the CDT test and was considered as such after the interview: Heavy drinkers (>3 drinks per day): 60 (32.7%), < 3 drinks per day and moderate: 127 (51.4%) 114 (46.5%), abstinent: 60 (24.3%) 51 (21%). Alcohol intake was monitored by structured interviews, self-reported drinking habits and the C-Audit questionnaire as well as information provided by their family and general practitioner. Consumption was quantified in terms of standard drinks, which contain approximately 10 grams of pure alcohol (Ref. WHO). Results: comparison between moderate (less or equal to 3 drinks per day) and excessive drinkers (more than 3 drinks) Marker ROC area 95% CI cut-off sensitivity specificity CDT TIA 0.852 0.786-0917 2.6* 0.93 LR+1.43 0.35 LR-0.192 CDT N latex 0.875 0.821-0.930 2.5* 0.66 LR+ 6.93 0.90 LR- 0.369 Asialo+disialo-tf 0.881 0.826-0.936 1.2* 0.78 LR+4.07 0.80 LR-0.268 1.7° 0.66 LR+8.9 0.93 LR-0.360 GGT 0.659 0.580-0.737 85* 0.37 LR+2.14 0.83 LR-0.764 * cut-off point suggested by the manufacturer ° cut-off point suggested by our laboratory Conclusion: With the cut-off point established by the manufacturer, CDT TIA performed poorly in term of specificity. N latex CDT and CZE CDT were better, especially if a 1.7 cut-off is used with CZE
Resumo:
The Iowa Department of Natural Resources (IDNR) administers the Public Drinking Water Program in Iowa under delegation of authority from the United States Environmental Protection Agency (EPA). The 1996 re-authorized Safe Drinking Water Act (SDWA) requires that each state that has been granted primary implementation authority prepare an annual report on violations of national primary drinking water regulations within the state, make the report readily available to the public, and submit it to the EPA. This report fulfills this responsibility in Iowa for the 2006 calendar year, and includes violations of maximum contaminant levels, maximum residual disinfectant levels, treatment technique requirements, major monitoring or reporting requirements, action level exceedances, and operation certification requirements.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.
Resumo:
While we can’t keep it from blowing, there are ways to influence the wind that carries tons of blowing and drifting snow. Periodically, severe winter storms will create large snow drifts that close roads and driveways, isolate farmsteads and increase snowplowing. Many of these drifting problems happen in the same place year after year. Although there are no foolproof methods of wind and snow control, properly designed and maintained snow fences can reduce or eliminate these problem areas. This publication discusses the benefits of snow fence, then examines the types used by the Iowa Department of Transportation. Finally, it provides information about how you can get involved in the DOT’s Cooperative Snow Fence Program.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
This report summarizes state and utility low-income weatherization program activity for dwellings weatherized to completion during calendar year 2004. The report includes state, utility, and agency summaries of calendar year 2004 spending and impacts by measure, end-use, and fuel. The base data consisted of statewide program tracking databases of spending and measure installations maintained by the Iowa Department of Community Action Agencies.
Resumo:
This report summarizes state and utility low-income weatherization program activity for dwellings weatherized to completion during calendar year 2005. The report includes state, utility, and agency summaries of calendar year 2005 spending and impacts by measure, end-use, and fuel. The base data consisted of statewide program tracking databases of spending and measure installations maintained by the Iowa Department of Community Action Agencies.