927 resultados para wind tunnel


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Stamp of "166"; Discontinued stamp JUL 29 1918

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Print No 74

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Print No. 71

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Print No:183.; Initials Lower Right: ELW (Everett Longley Warner)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Print No:80

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Print No: 66

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Print No: 80; Initials Lower Left: WH; Initials Lower Left: DN; Initials Lower Left: GY

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Print No:66; Initials Lower Left: WH; Initials Lower Left: DN; Initials Lower Left: GY

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Print No:67; Initials Lower Left: OL; Initials Lower Left: HD; Initials Lower Left: RN; Initials Lower Right: ELW (Everett Longley Warner)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Print No:70; Initials Lower Left: OL; Initials Lower Left: HD; Initials Lower Left: RN; Initials Lower Right: ELW (Everett Longley Warner)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In energy systems, the balance of entrances, exits and losses are fundamental to rationalize the energy consumption, independently of the source (sun, natural gas, wind, water, firewood or oil). This estimate is important so much in the phase of project of the facilities, as in the exploration or operation. In the project phase it indicates the energy needs of the process and the contribution of the energy in the cost of the product and the capacity of storage of the fuel and in the operation phase it allows to evaluate the use of the energy in the process of it burns, showing the weak points that should suffer intervention to improve the efficiency. With this tool, it can be implemented routines of calculation of thermal balances in ovens of it burns of structural ceramic, in way to generate an optimized mathematical model for application in the current and promising structural ceramic brazilian industry. The ceramic oven in study is located in the metropolitan area of Natal (Rio Grande do Norte) and it is a continuous oven of the type wagons tunnel, converted of firewood for natural gas and it produces blocks of red ceramic. The energy balance was applied in the oven tunnel before and after the conversion and made the comparisons of the energy efficiencies (it burns to the firewood and it burns to natural gas), what showed that the gaseous fuel is more efficient when we burn structural ceramic in ovens tunnels. When we burn natural gas, the requested energy is smaller and better used. Tests were accomplished in the burned product that showed the best quality of the burned brick with natural gas. That quality improvement makes possible to accomplish new interventions for the most rational use of the energy in the oven tunnel of the Ceramic in study and in the industries of structural ceramic of the whole Brazil, that need control tools of burning and of quality

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Energy policies and technological progress in the development of wind turbines have made wind power the fastest growing renewable power source worldwide. The inherent variability of this resource requires special attention when analyzing the impacts of high penetration on the distribution network. A time-series steady-state analysis is proposed that assesses technical issues such as energy export, losses, and short-circuit levels. A multiobjective programming approach based on the nondominated sorting genetic algorithm (NSGA) is applied in order to find configurations that maximize the integration of distributed wind power generation (DWPG) while satisfying voltage and thermal limits. The approach has been applied to a medium voltage distribution network considering hourly demand and wind profiles for part of the U.K. The Pareto optimal solutions obtained highlight the drawbacks of using a single demand and generation scenario, and indicate the importance of appropriate substation voltage settings for maximizing the connection of MPG.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: This article reports a clinical case with a 3-year follow-up in which a subepithelial connective tissue graft (SCTG) was used with the tunnel technique to treat multiple gingival recessions, and describes a technique used to enlarge the extension of the graft.Methods: A 41 -year-old female patient was referred for evaluation and treatment of maxillary multiple recessions. Following basic therapy, the plaque index was 23%, and the gingival index was 12%. Thus, SCTG with the tunnel technique was proposed to provide root coverage of Miller Class I recession on teeth #8 through #11 and a Miller Class III recession on tooth #12. After the donor area had been prepared, SCTG was removed and split cross-sectionally to lengthen it. The graft was placed through the tunnel and sutured.Results: Two weeks after the surgical procedure, the tissue color was nearly homogeneous with some reddish regions where the connective tissue was left uncovered, and there were no signs of incisions or suture marks. After 3 years of follow-up, the mean coverage of the recessions was 2.2 +/- 0.7 mm (74.2%), which corresponded to the gain of keratinized tissue. In addition, a gain in tissue thickness was observed.Conclusion: In a long-term evaluation, the tunnel technique with the elongated SCTG was used successfully for treatment of multiple gingival recessions with an increase of the soft tissue volume and gain of keratinized tissue.