902 resultados para Traction Power System


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sliding mode controllers for power converters usually employ hysteresis comparators to directly generate the power semiconductors switching states. This paper presents a new sliding mode modulator based on the direct implementation of the sliding mode stability condition, which for multilevel power converters shows advantages, as branch equalized switching frequencies and less distortion on the ac currents when operating near the rated converter power. The new sliding mode multilevel modulator is used to control a three-phase multilevel converter, operated as a reactive power compensator (STATCOM), implementing the stability condition in a digital signal processing system. The performance of this new sliding mode modulator is compared with a multilevel modulator based on hysteresis comparators. Simulation and experimental results are presented in order to highlight the system operation and control robustness.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nesta dissertação descreve-se uma metodologia de dimensionamento do sistema de tracção para equipar um veículo eléctrico ecológico (VEECO) com inclusão de um sistema de travagem regenerativa. Apresenta-se uma perspectiva geral de diversas topologias de sistemas de tracção utilizadas nos veículos eléctricos e realiza-se a sua comparação através do estudo e análise dos acionamentos electromecânicos que podem ser utilizados nesses sistemas de tracção eléctrica. Utilizando ferramentas de simulação numérica, estuda-se o modelo matemático de um veículo eléctrico com travagem regenerativa. A partir deste modelo matemático é adoptado uma possível configuração para o seu sistema de tracção eléctrica e são obtidas características teóricas de desempenho do veículo eléctrico, através da análise de testes padrão ao veículo. Em banco de ensaios, constrói-se um sistema de tracção eléctrica que permite a validação experimental do modelo matemático do veículo eléctrico. Para a construção deste banco de ensaios foram concebidos os sistemas de tracção eléctrica, de carga mecânica e de controlo e monitorização do banco de ensaios. A validação experimental realiza-se através dos mesmos testes padrão ao veículo eléctrico, como o teste NEDC (New European Driving Cycle), o teste de aceleração entre 0 e 100km/h e o teste de gradeabilidade. Desenvolve-se o dimensionamento do sistema de tracção eléctrica a equipar o VEECO, através da componente de modelação paramétrica do modelo matemático do veículo eléctrico. Com esta metodologia é adoptado um conjunto de variáveis paramétricas relacionadas com os elementos que constituem o sistema de tracção eléctrica do VEECO. Estuda-se a influência destas variáveis paramétricas nas características de desempenho pretendidas para o VEECO. Como resultado da análise de modelação paramétrica é apresentada uma solução para o sistema de tracção eléctrica do VEECO que cumpre a execução do NEDC, apresenta um tempo de aceleração entre 0 e 100km/h inferior a 10 segundos, supera uma gradeabilidade de 10% e uma autonomia de 200 km. O sistema de tracção do VEECO também permite realizar a travagem regenerativa com rendimento até 33%. Possui controlo de tracção e anti bloqueio da roda motora, através de uma unidade de controlo que permite reduzir a potência transmitida ao veio, quando a velocidade da roda de tracção difere do valor de referência da velocidade do veículo. Os conhecimentos adquiridos através do processo de investigação e desenvolvimento, para a realização da presente dissertação permitem apresentar perspectivas de desenvolvimento futuro com aplicação nos sistemas de tracção de veículos eléctricos rodoviários.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a new integrated model for the simulation of wind energy systems. The proposed model is more realistic and accurate, considering a variable-speed wind turbine, two-mass rotor, permanent magnet synchronous generator (PMSG), different power converter topologies, and filters. Additionally, a new control strategy is proposed for the variable-speed operation of wind turbines with PMSG/full-power converter topology, based on fractional-order controllers. Comprehensive simulation studies are carried out with matrix and multilevel power converter topologies, in order to adequately assert the system performance in what regards the quality of the energy injected into the electric grid. Finally, conclusions are duly drawn.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an investigation into cloud-to-ground lightning activity over the continental territory of Portugal with data collected by the national Lightning Location System. The Lightning Location System in Portugal is first presented. Analyses about geographical, seasonal, and polarity distribution of cloud-to-ground lightning activity and cumulative probability of peak current are carried out. An overall ground flash density map is constructed from the database, which contains the information of more than five years and almost four million records. This map is compared with the thunderstorm days map, produced by the Portuguese Institute of Meteorology, and with the orographic map of Portugal. Finally, conclusions are duly drawn.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The increased integration of wind power into the electric grid, as nowadays occurs in Portugal, poses new challenges due to its intermittency and volatility. Hence, good forecasting tools play a key role in tackling these challenges. In this paper, an adaptive neuro-fuzzy inference approach is proposed for short-term wind power forecasting. Results from a real-world case study are presented. A thorough comparison is carried out, taking into account the results obtained with other approaches. Numerical results are presented and conclusions are duly drawn. (C) 2011 Institute of Electrical Engineers of Japan. Published by John Wiley & Sons, Inc.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In competitive electricity markets with deep concerns for the efficiency level, demand response programs gain considerable significance. As demand response levels have decreased after the introduction of competition in the power industry, new approaches are required to take full advantage of demand response opportunities. Grid operators and utilities are taking new initiatives, recognizing the value of demand response for grid reliability and for the enhancement of organized spot markets’ efficiency. This paper proposes a methodology for the selection of the consumers that participate in an event, which is the responsibility of the Portuguese transmission network operator. The proposed method is intended to be applied in the interruptibility service implemented in Portugal, in convergence with Spain, in the context of the Iberian electricity market. This method is based on the calculation of locational marginal prices (LMP) which are used to support the decision concerning the consumers to be schedule for participation. The proposed method has been computationally implemented and its application is illustrated in this paper using a 937 bus distribution network with more than 20,000 consumers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The end consumers in a smart grid context are seen as active players. The distributed generation resources applied in smart home system as a micro and small-scale systems can be wind generation, photovoltaic and combine heat and power facility. The paper addresses the management of domestic consumer resources, i.e. wind generation, solar photovoltaic, combined heat and power, electric vehicle with gridable capability and loads, in a SCADA system with intelligent methodology to support the user decision in real time. The main goal is to obtain the better management of excess wind generation that may arise in consumer’s distributed generation resources. The optimization methodology is performed in a SCADA House Intelligent Management context and the results are analyzed to validate the SCADA system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The increasing importance given by environmental policies to the dissemination and use of wind power has led to its fast and large integration in power systems. In most cases, this integration has been done in an intensive way, causing several impacts and challenges in current and future power systems operation and planning. One of these challenges is dealing with the system conditions in which the available wind power is higher than the system demand. This is one of the possible applications of demand response, which is a very promising resource in the context of competitive environments that integrates even more amounts of distributed energy resources, as well as new players. The methodology proposed aims the maximization of the social welfare in a smart grid operated by a virtual power player that manages the available energy resources. When facing excessive wind power generation availability, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. The proposed method is especially useful when actual and day-ahead wind forecast differ significantly. The proposed method has been computationally implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20310 consumers and 548 distributed generators, some of them with must take contracts.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this work is proposed the design of a system to create and handle Electric Vehicles (EV) charging procedures, based on intelligent process. Due to the electrical power distribution network limitation and absence of smart meter devices, Electric Vehicles charging should be performed in a balanced way, taking into account past experience, weather information based on data mining, and simulation approaches. In order to allow information exchange and to help user mobility, it was also created a mobile application to assist the EV driver on these processes. This proposed Smart ElectricVehicle Charging System uses Vehicle-to-Grid (V2G) technology, in order to connect Electric Vehicles and also renewable energy sources to Smart Grids (SG). This system also explores the new paradigm of Electrical Markets (EM), with deregulation of electricity production and use, in order to obtain the best conditions for commercializing electrical energy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

All over the world Distributed Generation is seen as a valuable help to get cleaner and more efficient electricity. To get negotiation power and advantages of scale economy, distributed producers can be aggregated giving place to a new concept: the Virtual Power Producer. Virtual Power Producers are multitechnology and multi-site heterogeneous entities. Virtual Power Producers should adopt organization and management methodologies so that they can make Distributed Generation a really profitable activity, able to participate in the market. In this paper we address the development of a multi-agent market simulator – MASCEM – able to study alternative coalitions of distributed producers in order to identify promising Virtual Power Producers in an electricity market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a particle swarm optimization (PSO) approach to support electricity producers for multiperiod optimal contract allocation. The producer risk preference is stated by a utility function (U) expressing the tradeoff between the expectation and variance of the return. Variance estimation and expected return are based on a forecasted scenario interval determined by a price range forecasting model developed by the authors. A certain confidence level is associated to each forecasted scenario interval. The proposed model makes use of contracts with physical (spot and forward) and financial (options) settlement. PSO performance was evaluated by comparing it with a genetic algorithm-based approach. This model can be used by producers in deregulated electricity markets but can easily be adapted to load serving entities and retailers. Moreover, it can easily be adapted to the use of other type of contracts.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many of the most common human functions such as temporal and non-monotonic reasoning have not yet been fully mapped in developed systems, even though some theoretical breakthroughs have already been accomplished. This is mainly due to the inherent computational complexity of the theoretical approaches. In the particular area of fault diagnosis in power systems however, some systems which tried to solve the problem, have been deployed using methodologies such as production rule based expert systems, neural networks, recognition of chronicles, fuzzy expert systems, etc. SPARSE (from the Portuguese acronym, which means expert system for incident analysis and restoration support) was one of the developed systems and, in the sequence of its development, came the need to cope with incomplete and/or incorrect information as well as the traditional problems for power systems fault diagnosis based on SCADA (supervisory control and data acquisition) information retrieval, namely real-time operation, huge amounts of information, etc. This paper presents an architecture for a decision support system, which can solve the presented problems, using a symbiosis of the event calculus and the default reasoning rule based system paradigms, insuring soft real-time operation with incomplete, incorrect or domain incoherent information handling ability. A prototype implementation of this system is already at work in the control centre of the Portuguese Transmission Network.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The activity of Control Center operators is important to guarantee the effective performance of Power Systems. Operators’ actions are crucial to deal with incidents, especially severe faults like blackouts. In this paper, we present an Intelligent Tutoring approach for training Portuguese Control Center operators in tasks like incident analysis and diagnosis, and service restoration of Power Systems. Intelligent Tutoring System (ITS) approach is used in the training of the operators, having into account context awareness and the unobtrusive integration in the working environment. Several Artificial Intelligence techniques were criteriously used and combined together to obtain an effective Intelligent Tutoring environment, namely Multiagent Systems, Neural Networks, Constraint-based Modeling, Intelligent Planning, Knowledge Representation, Expert Systems, User Modeling, and Intelligent User Interfaces.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Important research effort has been devoted to the topic of optimal planning of distribution systems. The non linear nature of the system, the need to consider a large number of scenarios and the increasing necessity to deal with uncertainties make optimal planning in distribution systems a difficult task. Heuristic techniques approaches have been proposed to deal with these issues, overcoming some of the inherent difficulties of classic methodologies. This paper considers several methodologies used to address planning problems of electrical power distribution networks, namely mixedinteger linear programming (MILP), ant colony algorithms (AC), genetic algorithms (GA), tabu search (TS), branch exchange (BE), simulated annealing (SA) and the Bender´s decomposition deterministic non-linear optimization technique (BD). Adequacy of theses techniques to deal with uncertainties is discussed. The behaviour of each optimization technique is compared from the point of view of the obtained solution and of the methodology performance. The paper presents results of the application of these optimization techniques to a real case of a 10-kV electrical distribution system with 201 nodes that feeds an urban area.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a methodology to address reactive power compensation using Evolutionary Particle Swarm Optimization (EPSO) technique programmed in the MATLAB environment. The main objective is to find the best operation point minimizing power losses with reactive power compensation, subjected to all operational constraints, namely full AC power flow equations, active and reactive power generation constraints. The methodology has been tested with the IEEE 14 bus test system demonstrating the ability and effectiveness of the proposed approach to handle the reactive power compensation problem.