936 resultados para Horizontal impact testing


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wheel-rail interaction is one of the most important research topics in railway engineering. It includes track vibration, track impact response and safety of the track. Track structure failures caused by impact forces can lead to significant economic loss for track owners through damage to rails and to the sleepers beneath. The wheel-rail impact forces occur because of imperfections on the wheels or rails such as wheel flats, irregular wheel profile, rail corrugation and differences in the height of rails connected at a welded joint. In this paper, a finite element model for the wheel flat study is developed by use of the FEA software package ANSYS. The effect of the wheel flat to impact force on sleepers is investigated. It has found that the wheel flat significantly increases impact forces and maximum Von Mises stress, and also delays the peak position of dynamic variation for impact forces on both rail and sleeper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Insulated rail joints (IRJs) possess lower bending stiffness across the gap containing insulating endpost and hence are subjected to wheel impact. IRJs are either square cut or inclined cut to the longitudinal axis of the rails in a vertical plane. It is generally claimed that the inclined cut IRJs outperformed the square cut IRJs; however, there is a paucity of literature with regard to the relative structural merits of these two designs. This article presents comparative studies of the structural response of these two IRJs to the passage of wheels based on continuously acquired field data from joints strain-gauged closer to the source of impact. Strain signatures are presented in time, frequency, and avelet domains and the peak vertical and shear strains are systematically employed to examine the relative structural merits of the two IRJs subjected to similar real-life loading. It is shown that the inclined IRJs resist the wheel load with higher peak shear strains and lower peak vertical strains than that of the square IRJs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background There has been increasing interest in assessing the impacts of temperature on mortality. However, few studies have used a case–crossover design to examine non-linear and distributed lag effects of temperature on mortality. Additionally, little evidence is available on the temperature-mortality relationship in China, or what temperature measure is the best predictor of mortality. Objectives To use a distributed lag non-linear model (DLNM) as a part of case–crossover design. To examine the non-linear and distributed lag effects of temperature on mortality in Tianjin, China. To explore which temperature measure is the best predictor of mortality; Methods: The DLNM was applied to a case¬−crossover design to assess the non-linear and delayed effects of temperatures (maximum, mean and minimum) on deaths (non-accidental, cardiopulmonary, cardiovascular and respiratory). Results A U-shaped relationship was consistently found between temperature and mortality. Cold effects (significantly increased mortality associated with low temperatures) were delayed by 3 days, and persisted for 10 days. Hot effects (significantly increased mortality associated with high temperatures) were acute and lasted for three days, and were followed by mortality displacement for non-accidental, cardiopulmonary, and cardiovascular deaths. Mean temperature was a better predictor of mortality (based on model fit) than maximum or minimum temperature. Conclusions In Tianjin, extreme cold and hot temperatures increased the risk of mortality. Results suggest that the effects of cold last longer than the effects of heat. It is possible to combine the case−crossover design with DLNMs. This allows the case−crossover design to flexibly estimate the non-linear and delayed effects of temperature (or air pollution) whilst controlling for season.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 2001, the Malaysian Code on Corporate Governance (MCCG) became an integral part of the Bursa Malaysia Listing Rules, which requires all listed firms to disclose the extent of compliance with the MCCG. Our panel analysis of 440 firms from 1999 to 2002 finds that corporate governance reform in Malaysia has been successful, with a significant improvement in governance practices. The relationship between ownership by the Employees Provident Fund (EPF) and corporate governance has strengthened during the period subsequent to the reform, in line with the lead role taken by the EPF in establishing the Minority Shareholders Watchdog Group. The implementation of MCCG has had a substantial effect on shareholders' wealth, increasing stock prices by an average of about 4.8%. Although there is no evidence that politically connected firms perform better, political connections do have a significantly negative effect on corporate governance, which is mitigated by institutional ownership.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Medication-related problems often occur in the immediate post-discharge period. To reduce medication misadventure the Commonwealth Government funds home medicines reviews (HMRs). HMRs are initiated when general practitioners refer consenting patients to their community pharmacists, who then engage accredited pharmacists to review patients' medicines in their homes. Aim: To determine if hospital-initiated medication reviews (HIMRs) can be implemented in a more timely manner than HMRs; and to assess the impact of a bespoke referral form with comorbidity-specific questions on the quality of reports. Method: Eligible medical inpatients at risk of medication misadventure were referred by the hospital liaison pharmacist to participating accredited pharmacists post-discharge from hospital. Social, demographic and laboratory data were collected from medical records and during interviews with consenting patients. Issues raised in the HIMR reports were categorised: intervention/action, information given or recommendation, and assigned a rank of clinical significance. Results: HIMRs were conducted within 11.6 6.6 days postdischarge. 36 HIMR reports were evaluated and 1442 issues identified - information given (n = 1204), recommendations made (n = 88) and actions taken (n = 150). The majority of issues raised (89%) had a minor clinical impact. The bespoke referral form prompted approximately half of the issues raised. Conclusion: HIMRs can be facilitated in a more timely manner than post-discharge HMRs. There was an associated positive clinical impact of issues raised in the HIMR reports.