848 resultados para Construction management
Resumo:
The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.
Resumo:
With the increase in construction in dense urban environments, the delays associated with managing the material supply chain to site is called into question. Purpose: The aim of this investigation is to gain the perspective of construction contractors operating in a dense urban environment and the resulting strategies adopted to reduce delays in the delivery of materials to site. Methodology: This is achieved through incorporating a comprehensive literature review on the subject in conjunction with industry interviews with construction professionals in the identification of various management issues and corresponding strategies in the reduction of delays in the delivery of materials to site. Findings: The key issue which emerges is the lack of space for unloading bays while the corresponding key strategy is to schedule deliveries outside peak congestion times. Practical Implication: With confined site construction evident throughout the industry and the noted importance of an effective supply chain, the findings here in further assist on-site management in the daily task of ensuring the effective delivery and off-loading of materials in a complex and hazardous environment. Originality/Value: This research aids on-site management of confined site environments in the coordination of the material supply chain to site.
Resumo:
The objective of this paper is to identify various managerial issues encountered and resulting strategies adopted, with regards management of materials on confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, for the successful management of such confined environments within the realm of materials management.
Through conducting an extensive literature review and detailed interviews, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The following are the leading issues highlighted; (1)Lack of adequate storage space, (2)Work place becoming over-crowded, (3)Lack of adequate room for the effective handling of materials and (4)Difficult to transport materials around site. The leading managerial strategies to the management of materials on confined construction sites may be listed in order of importance, as follows; (1)Pre-fabrication and pre-assembly, (2)Providing adequate storage, (3)Space scheduling, (4)Just-In-Time delivery techniques, and (5)Effective design site layout.
Based on the research conducted, it can be concluded, that through effective management of the issues identified along with implementing the various strategies highlighted; successful materials management within a confined construction site environment is attainable.
Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) investigating the managerial issues and strategies relating to implementation of materials management in confined construction sites.
Resumo:
Waste management and sustainability are two core underlying philosophies that the construction sector must acknowledge and implement; however, this can prove difficult and time consuming. To this end, the aim of this paper is to examine waste management strategies and the possible benefits, advantages and disadvantages to their introduction and use, while also to examine any inter-relationship with sustainability, particularly at the design stage. The purpose of this paper is to gather, examine and review published works and investigate factors which influence economic decisions at the design phase of a construction project. In addressing this aim, a three tiered sequential research approach is adopted; in-depth literature review, interviews/focus groups and qualitative analysis. The resulting data is analyzed, discussed, with potential conclusions identified; paying particular attention to implications for practice within architectural firms. This research is of importance, particularly to the architectural sector, as it can add to the industry’s understanding of the design process, while also considering the application and integration of waste management into the design procedure. Results indicate that the researched topic had many advantages but also had inherent disadvantages. It was found that the potential advantages outweighed disadvantages, but uptake within industry was still slow and that better promotion and their benefits to; sustainability, the environment, society and the industry were required.
Resumo:
The management of construction waste is important today. The scarcity in the availability of aggregate for the production of concrete is one of the important problems facing by the construction industry. Appropriate use of the construction waste is a solution to the fast degradation of virgin raw materials in the construction industry. This paper enlightens the importance of reduce, reuse and recycle (3R) concept for managing the construction waste in India
Resumo:
Patterns of communication and behaviour emerge within a construction project in response to a construction crisis. This paper investigates, within a grounded theory framework, the nature of these patterns, the sociological and psychological forces which shape them and their relationship with crisis management efficiency. A grounded theory is presented in four parts. The first part conceives a construction crisis as a period of social instability, arising from conflicting interest groups, seeking to exercise power in the pursuit of social structures which suit their political and economic interests. The second part sees a construction crisis as a de-sensitizing phenomenon which results in a period of behavioural instability and conflict which is self-perpetuating. The third part cites social structure as an important influence upon construction crisis management efficiency, in determining the efficiency of information flow, and the level of uncertainty between those affected. The fourth part points to the in-built defence mechanisms which construction crises have and to three managerial ironies which make construction crisis management difficult.
Resumo:
Construction materials and equipment are essential building blocks of every construction project and may account for 50-60 per cent of the total cost of construction. The rate of their utilization, on the other hand, is the element that most directly relates to a project progress. A growing concern in the industry that inadequate efficiency hinders its success could thus be accommodated by turning construction into a logistic process. Although mostly limited, recent attempts and studies show that Radio Frequency IDentification (RFID) applications have significant potentials in construction. However, the aim of this research is to show that the technology itself should not only be used for automation and tracking to overcome the supply chain complexity but also as a tool to generate, record and exchange process-related knowledge among the supply chain stakeholders. This would enable all involved parties to identify and understand consequences of any forthcoming difficulties and react accordingly before they cause major disruptions in the construction process. In order to achieve this aim the study focuses on a number of methods. First of all it develops a generic understanding of how RFID technology has been used in logistic processes in industrial supply chain management. Secondly, it investigates recent applications of RFID as an information and communication technology support facility in construction logistics for the management of construction supply chain. Based on these the study develops an improved concept of a construction logistics architecture that explicitly relies on integrating RFID with the Global Positioning System (GPS). The developed conceptual model architecture shows that categorisation provided through RFID and traceability as a result of RFID/GPS integration could be used as a tool to identify, record and share potential problems and thus vastly improve knowledge management processes within the entire supply chain. The findings thus clearly show a need for future research in this area.
Resumo:
This paper aims to introduce a knowledge-based managemental prototype entitled Eþ for environmental-conscious construction relied on an integration of current environmental management tools in construction area. The overall objective of developing the Eþ prototype is to facilitate selectively reusing the retrievable knowledge in construction engineering and management areas assembled from previous projects for the best practice in environmental-conscious construction. The methodologies adopted in previous and ongoing research related to the development of the Eþ belong to the operations research area and the information technology area, including literature review, questionnaire survey and interview, statistical analysis, system analysis and development, experimental research and simulation, and so on. The content presented in this paper includes an advanced Eþ prototype, a comprehensive review of environmental management tools integrated to the Eþ prototype, and an experimental case study of the implementation of the Eþ prototype. It is expected that the adoption and implementation of the Eþ prototype can effectively facilitate contractors to improve their environmental performance in the lifecycle of projectbased construction and to reduce adverse environmental impacts due to the deployment of various engineering and management processes at each construction stage.
Resumo:
Requirements management (RM), as practised in the aerospace and defence sectors, attracts interest from construction researchers in response to longstanding problems of project definition. Doubts are expressed whether RM offers a new discipline for construction practitioners or whether it repeats previous exhortations to adopt a more disciplined way of working. Whilst systems engineering has an established track record of addressing complex technical problems, its extension to socially complex problems has been challenged. The dominant storyline of RM is one of procedural rationality and RM is commonly presented as a means of controlling dilettante behaviour. Interviews with RM practitioners suggest a considerable gulf between the dominant storyline in the literature and how practitioners operate in practice. The paper challenges construction researchers interested in RM to reflect more upon the theoretical debates that underpin current equivalent practices in construction and the disparity between espoused and enacted practice.