963 resultados para CONCENTRATED LOADS
Resumo:
In recent years the use of several new resources in power systems, such as distributed generation, demand response and more recently electric vehicles, has significantly increased. Power systems aim at lowering operational costs, requiring an adequate energy resources management. In this context, load consumption management plays an important role, being necessary to use optimization strategies to adjust the consumption to the supply profile. These optimization strategies can be integrated in demand response programs. The control of the energy consumption of an intelligent house has the objective of optimizing the load consumption. This paper presents a genetic algorithm approach to manage the consumption of a residential house making use of a SCADA system developed by the authors. Consumption management is done reducing or curtailing loads to keep the power consumption in, or below, a specified energy consumption limit. This limit is determined according to the consumer strategy and taking into account the renewable based micro generation, energy price, supplier solicitations, and consumers’ preferences. The proposed approach is compared with a mixed integer non-linear approach.
Resumo:
The large increase of Distributed Generation (DG) in Power Systems (PS) and specially in distribution networks makes the management of distribution generation resources an increasingly important issue. Beyond DG, other resources such as storage systems and demand response must be managed in order to obtain more efficient and “green” operation of PS. More players, such as aggregators or Virtual Power Players (VPP), that operate these kinds of resources will be appearing. This paper proposes a new methodology to solve the distribution network short term scheduling problem in the Smart Grid context. This methodology is based on a Genetic Algorithms (GA) approach for energy resource scheduling optimization and on PSCAD software to obtain realistic results for power system simulation. The paper includes a case study with 99 distributed generators, 208 loads and 27 storage units. The GA results for the determination of the economic dispatch considering the generation forecast, storage management and load curtailment in each period (one hour) are compared with the ones obtained with a Mixed Integer Non-Linear Programming (MINLP) approach.
Resumo:
The increase of distributed generation (DG) has brought about new challenges in electrical networks electricity markets and in DG units operation and management. Several approaches are being developed to manage the emerging potential of DG, such as Virtual Power Players (VPPs), which aggregate DG plants; and Smart Grids, an approach that views generation and associated loads as a subsystem. This paper presents a multi-level negotiation mechanism for Smart Grids optimal operation and negotiation in the electricity markets, considering the advantages of VPPs’ management. The proposed methodology is implemented and tested in MASCEM – a multiagent electricity market simulator, developed to allow deep studies of the interactions between the players that take part in the electricity market negotiations.
Resumo:
Power system organization has gone through huge changes in the recent years. Significant increase in distributed generation (DG) and operation in the scope of liberalized markets are two relevant driving forces for these changes. More recently, the smart grid (SG) concept gained increased importance, and is being seen as a paradigm able to support power system requirements for the future. This paper proposes a computational architecture to support day-ahead Virtual Power Player (VPP) bid formation in the smart grid context. This architecture includes a forecasting module, a resource optimization and Locational Marginal Price (LMP) computation module, and a bid formation module. Due to the involved problems characteristics, the implementation of this architecture requires the use of Artificial Intelligence (AI) techniques. Artificial Neural Networks (ANN) are used for resource and load forecasting and Evolutionary Particle Swarm Optimization (EPSO) is used for energy resource scheduling. The paper presents a case study that considers a 33 bus distribution network that includes 67 distributed generators, 32 loads and 9 storage units.
Resumo:
With the current increase of energy resources prices and environmental concerns intelligent load management systems are gaining more and more importance. This paper concerns a SCADA House Intelligent Management (SHIM) system that includes an optimization module using deterministic and genetic algorithm approaches. SHIM undertakes contextual load management based on the characterization of each situation. SHIM considers available generation resources, load demand, supplier/market electricity price, and consumers’ constraints and preferences. The paper focus on the recently developed learning module which is based on artificial neural networks (ANN). The learning module allows the adjustment of users’ profiles along SHIM lifetime. A case study considering a system with fourteen discrete and four variable loads managed by a SHIM system during five consecutive similar weekends is presented.
Resumo:
Power systems are planed and operated according to the optimization of the available resources. Traditionally these tasks were mostly undertaken in a centralized way which is no longer adequate in a competitive environment. Demand response can play a very relevant role in this context but adequate tools to negotiate this kind of resources are required. This paper presents an approach to deal with these issues, by using a multi-agent simulator able to model demand side players and simulate their strategic behavior. The paper includes an illustrative case study that considers an incident situation. The distribution company is able to reduce load curtailment due to load flexibility contracts previously established with demand side players.
Resumo:
This paper consist in the establishment of a Virtual Producer/Consumer Agent (VPCA) in order to optimize the integrated management of distributed energy resources and to improve and control Demand Side Management DSM) and its aggregated loads. The paper presents the VPCA architecture and the proposed function-based organization to be used in order to coordinate the several generation technologies, the different load types and storage systems. This VPCA organization uses a frame work based on data mining techniques to characterize the costumers. The paper includes results of several experimental tests cases, using real data and taking into account electricity generation resources as well as consumption data.
Resumo:
Power systems operation in a liberalized environment requires that market players have access to adequate decision support tool, allowing them to consider all the business opportunities and take strategic decisions. Ancillary services represent a good negotiation opportunity that must be considered by market players. For this, decision support tools must include ancillary market simulation. This paper deals with ancillary services negotiation in electricity markets. The proposed concepts and methodologies are implemented in MASCEM, a multi-agent based electricity market simulator. A test case concerning the dispatch of ancillary services using two different methods (Linear Programming and Genetic Algorithm approaches) is included in the paper.
Resumo:
OBJECTIVE: The expansion of precarious employment in OECD countries has been widely associated with negative health and safety effects. Although many shiftworkers are precariously employed, shiftwork research has concentrated on full-time workers in continuing employment. This paper examines the impact of precarious employment on working hours, work-life conflict and health by comparing casual employees to full-time, "permanent" employees working in the same occupations and workplaces. METHODS: Thirty-nine convergent interviews were conducted in two five-star hotels. The participants included 26 full-time and 13 casual (temporary) employees. They ranged in age from 19 to 61 years and included 17 females and 22 males. Working hours ranged from zero to 73 hours per week. RESULTS: Marked differences emerged between the reports of casual and full-time employees about working hours, work-life conflict and health. Casuals were more likely to work highly irregular hours over which they had little control. Their daily and weekly working hours ranged from very long to very short according to organisational requirements. Long working hours, combined with low predictability and control, produced greater disruption to family and social lives and poorer work-life balance for casuals. Uncoordinated hours across multiple jobs exacerbated these problems in some cases. Health-related issues reported to arise from work-life conflict included sleep disturbance, fatigue and disrupted exercise and dietary regimes. CONCLUSIONS:This study identified significant disadvantages of casual employment. In the same hotels, and doing largely the same jobs, casual employees had less desirable and predictable work schedules, greater work-life conflict and more associated health complaints than "permanent" workers.
Resumo:
A supervisory control and data acquisition (SCADA) system is an integrated platform that incorporates several components and it has been applied in the field of power systems and several engineering applications to monitor, operate and control a lot of processes. In the future electrical networks, SCADA systems are essential for an intelligent management of resources like distributed generation and demand response, implemented in the smart grid context. This paper presents a SCADA system for a typical residential house. The application is implemented on MOVICON™11 software. The main objective is to manage the residential consumption, reducing or curtailing loads to keep the power consumption in or below a specified setpoint, imposed by the costumer and the generation availability.
Resumo:
Demand response can play a very relevant role in future power systems in which distributed generation can help to assure service continuity in some fault situations. This paper deals with the demand response concept and discusses its use in the context of competitive electricity markets and intensive use of distributed generation. The paper presents DemSi, a demand response simulator that allows studying demand response actions and schemes using a realistic network simulation based on PSCAD. Demand response opportunities are used in an optimized way considering flexible contracts between consumers and suppliers. A case study evidences the advantages of using flexible contracts and optimizing the available generation when there is a lack of supply.
Resumo:
A deposição de resíduos sólidos urbanos (RSU) em aterros sanitários (AS) tem uma dimensão que necessita de uma atenção especial por parte da sociedade. Deste acto podem resultar situações gravosas para o meio ambiente se não forem tomadas as medidas correctas. Um dos pontos que necessita de uma particular atenção é o tratamento das águas lixiviantes dos aterros sanitários, uma vez que estas apresentam geralmente cargas altamente poluentes. O presente trabalho apresenta a estrutura de um aterro sanitário, definindo os seus princípios de funcionamento, bem como as principais características a ter em consideração para a sua concepção e construção. É ainda abordada a composição dos resíduos sólidos produzidos em Portugal de acordo com (1) e as características quantitativas e qualitativas do lixiviado produzido por um AS. São apresentados os sistemas tratamento convencionais, biológicos e físico-químicos, mais utilizados em Portugal para o tratamento de águas lixiviantes, relacionando as problemáticas e as limitações associadas a cada um deles. É ainda apresentado o tratamento combinado de águas lixiviantes com águas residuais e a recirculação de lixiviado no sistema de tratamento, assim como algumas das vantagens associadas a estas práticas. Tendo por base, uma situação real, avalia-se um caso de estudo, que visa a avaliação do funcionamento da estação de pré-tratamento das águas lixiviantes produzidas no aterro sanitário do ecoparque de Palmela, tendo em consideração o facto de este tratamento ser realizado em combinação com o tratamento de águas residuais urbanas. A avaliação do funcionamento da estação de pré-tratamento de águas lixiviantes (EPTAL) é realizada de acordo com os dados fornecidos nos relatórios elaborados pela empresa LUSÁGUA, que apresentam os valores das cargas poluentes medidos à entrada e saída da EPTAL, verificando com estes dados se os valores limite de emissão medidos à saída da EPTAL são respeitados. São ainda propostas algumas alterações baseadas em pareceres técnicos que acompanham os relatórios elaborados pela LUSÁGUA e um estudo elaborada pela ECOserviços em Fevereiro de 2010 onde se obtêm eficiências de etapas de tratamentos com base em testes laboratoriais e testes realizados na própria EPTAL.
Resumo:
This study was carried out with the aim of modeling in 2D, in plain strain, the movement of a soft cohesive soil around a pile, in order to enable the determination of stresses resulting along the pile, per unit length. The problem in study fits into the large deformations problem and can be due to landslide, be close of depth excavations, to be near of zones where big loads are applied in the soil, etc. In this study is used an constitutive Elasto-Plastic model with the failure criterion of Mohr-Coulomb to model the soil behavior. The analysis is developed considering the soil in undrained conditions. To the modeling is used the finite element program PLAXIS, which use the Updated Lagrangian - Finite Element Method (UL-FEM). In this work, special attention is given to the soil-pile interaction, where is presented with some detail the formulation of the interface elements and some studies for a better understand of his behavior. It is developed a 2-D model that simulates the effect of depth allowing the study of his influence in the stress distribution around the pile. The results obtained give an important base about how behaves the movement of the soil around a pile, about how work the finite element program PLAXIS and how is the stress distribution around the pile. The analysis demonstrate that the soil-structure interaction modeled with the UL-FEM and interface elements is more appropriate to small deformations problems.
Resumo:
Dissertação de Mestrado, Estudos Integrados dos Oceanos, 15 de Janeiro de 2009, Universidade dos Açores.
Resumo:
Cork processing involves a boiling step to make the cork softer, which consumes a high volume of water and generates a wastewater with a high organic content, rich in tannins. An assessment of the final wastewater characteristics and of the boiling water composition along the boiling process was performed. The parameters studied were pH, color, total organic carbon (TOC), chemical and biochemical oxygen demands (COD, BOD5, BOD20), total suspended solids (TSS), total phenols and tannins (TP, TT). It was observed that the water solutes extraction power is significantly reduced for higher quantities of cork processed. Valid relationships between parameters were established not only envisaging wastewater characterization but also to provide an important tool for wastewater monitoring and for process control/optimization. Boiling water biodegradability presented decreasing values with the increase of cork processed and for the final wastewater its value is always lower than 0.5, indicating that these wastewaters are very difficult to treat by biological processes. The biodegradability was associated with the increase of tannin content that can rise up to 0.7 g/L. These compounds can be used by other industries when concentrated and the clarified wastewater can be reused, which is a potential asset in this wastewater treatment.