862 resultados para Business process model


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Construction organisations comprise geographically dispersed virtually-linked suborganisations that work together to realise projects. They increasingly do so using information and communication technology (ICT) to communicate, coordinate their activities and to solve complex problems. One salient problem they face is how to effectively use requisite ICT tools. One important tool at their disposal is the self-help group, a body of people that organically spring up to solve shared problems. The more recognised term for this organisational form is a community of practice (COP). COPs generate knowledge networks that enhance and sustain competitive advantage and they are also used to help COP members actually use ICT tools. Etienne Wenger defines communities of practice as “groups of people informally bound together by shared expertise and passion for a joint enterprise” (Wenger and Snyder 2000, p139). This ‘chicken-or-egg’ issue about needing a COP to use the tools that are needed to effective broaden COPs (beyond co-located these groups) led us to explore how best to improve the process of ICT diffusion through construction organisations— primarily using people supported by technology that improves knowledge sharing. We present insights gained from recent PhD research results in this area. A semistructured interview approach was used to collect data from ICT strategists and users in the three large Australian construction organisations that are among the 10 or so first tier companies by annual dollar turnover in Australia. The interviewees were categorised into five organisational levels: IT strategist, implementer, project or engineering manager, site engineer and foreman. The focus of the study was on the organisation and the way that it implements ICT diffusion of a groupware ICT diffusion initiative. Several types of COP networks from the three Australian cases are identified: withinorganisation COP; institutional, implementer or technical support; project manager/engineer focussed; and collegial support. Also, there are cross-organisational COPs that organically emerge as a result of people sharing an interest or experience in something significant. Firstly, an institutional network is defined as a strategic group, interested in development of technology innovation within an organisation. This COP principally links business process domain experts with an ICT strategist.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Simulation is widely used as a tool for analyzing business processes but is mostly focused on examining abstract steady-state situations. Such analyses are helpful for the initial design of a business process but are less suitable for operational decision making and continuous improvement. Here we describe a simulation system for operational decision support in the context of workflow management. To do this we exploit not only the workflow’s design, but also use logged data describing the system’s observed historic behavior, and incorporate information extracted about the current state of the workflow. Making use of actual data capturing the current state and historic information allows our simulations to accurately predict potential near-future behaviors for different scenarios. The approach is supported by a practical toolset which combines and extends the workflow management system YAWL and the process mining framework ProM.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The YAWL system is structured as a service-oriented architecture. It is composed of an extensible set of YAWL Services [1], each of which is deployed at a certain endpoint and offers one or multiple interfaces. Some of these services are userfacing, meaning that they offer interfaces to end users, while others offer interfaces to applications or other services.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A shortage of affordable housing is a major problem in Australia today. This is mainly due to the limited supply of affordable housing that is provided by the non-government housing sector. Some private housing developers see the provision of affordable housing for lower income people as a high risk investment which offers a lower return than broader market-based housing. The scarcity of suitable land, a limited government ‘subsidy’, and increasing housing costs have not provided sufficient development incentives to encourage their investment despite the existing high demand for affordable housing. This study analyses the risk management process conducted by some private and not-for-profit housing providers in South East Queensland, and draws conclusions about the relationship between risk assessments/responses and past experiences. In-depth interviews of selected non-government housing providers have been conducted to facilitate an understanding of their approach to risk assessment/response in developing and in managing affordable housing projects. These developers use an informal risk management process as part of their normal business process in accordance with industry standards. A simple qualitative matrix has been used to analyse probability and impacts using a qualitative scale - low, medium and high. For housing providers who have considered investing in affordable housing but have not yet implemented any such projects, affordable housing development is seen as an opportunity that needs to be approached with caution. The risks associated with such projects and the levels of acceptance of these are not consistently identified by current housing providers. Many interviewees agree that the recognition of financial risk and the fear of community rejection of such housing projects have restrained them from committing to such investment projects. This study suggests that implementing improvements to the risk mitigation and management framework may assist in promoting the supply of affordable housing by non-government providers.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Workflow Management Systems (WfMSs) enable the development and maintenance of workflow specifications at design time and their execution and monitoring at runtime. The open source WfMS YAWL supports the YAWL language – a formally defined language based on Petri nets which offers comprehensive support for control-flow and resource patterns. In addition, the YAWL system provides extensive support for process flexibility, in particular for process configuration, exception handling, dynamic workflow and declarative workflow. Due to its formal foundation, sophisticated verification support can also be achieved. This paper presents the YAWL system and its main applications.

Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to analyse the risk management process conducted by some private and not-for-profit affordable housing providers in South East Queensland, and draw conclusions about the relationship between risk assessments/responses and past experiences.----- Design/methodology/approach: In-depth interviews of selected non-government housing providers have been conducted to facilitate an understanding of their approach to risk assessment in developing and in managing affordable housing projects. Qualitative data are analysed using thematic analysis to find emerging themes suggested by interview participants.----- Findings: The paper finds that informal risk management process is used as part of normal business process in accordance with industry standards. Many interviewees agree that the recognition of financial risk and the fear of community rejection of such housing projects have restrained them from committing to such investment projects. The levels of acceptance of risk are not always consistent across housing providers which create opportunities to conduct multi-stakeholder partnership to reduce overall risk.----- Research limitations/implications: The paper has implications for developers or investors who seek to include affordable housing as part of their portfolio. However, data collected in the study are a cross-section of interviews that will not include the impact on recent tax incentives offers by the Australian Commonwealth Government.----- Practical implications: The study suggests that implementing improvements to the risk mitigation and management framework may assist in promoting the supply of affordable housing by non-government providers.----- Originality/value: The focus of the study is the interaction between partnerships and risk management in development and management of affordable rental housing.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Continuous learning and development has become increasingly important in the information age. However, employees with limited formal education in lower status occupations may be disadvantaged in their opportunities for development, as their jobs tend to require more limited knowledge and skills. In mature age, such workers may be subject to cumulative disadvantage with respect to work related learning and development, as well as negative stereotyping. This thesis concerns work related learning and development from a lifespan development psychology perspective. Development across the lifespan is grounded in biocultural co-constructivism. That is, the reciprocal influences of the individual and environment produce change in the individual. Existing theories and models of adaptive development attempt to explain how developmental resources are allocated across the lifespan. These included the Meta- theory of Selective Optimisation with Compensation, Dual Process Model of Self Regulation, and Developmental Regulation via Optimisation and Primary and Secondary Control. These models were integrated to create the Model of Adaptive Development for Work Related Learning. The Learning and Development Survey (LDS) was constructed to measure the hypothesised processes of adaptive development for work related learning, which were individual goal selection, individual goal engagement, individual goal disengagement, organisational opportunities (selection and engagement), and organisational constraints. Data collection was undertaken in two phases: the pilot study and the main study. The objective of the pilot study was to test the LDS on a target population of 112 employees from a local government organisation. Exploratory factor analysis reduced the pilot version of the survey to 38 items encompassing eight constructs which covered the processes of the model of adaptive development for work related learning. In the main study, the Revised Learning and Development Survey (R-LDS) was administered to another group of 137 employees from the local government organisation, as well as 110 employees from a private healthcare organisation. The purpose of the main study was to validate the R-LDS on two different groups to provide evidence of stability, and compare survey scores according to age and occupational status to determine construct validity. Findings from the main study indicated that only four constructs of the R-LDS were stable, which were organisational opportunities – selection, individual goal engagement, organisational constraints – disengagement and organisational opportunities – engagement. In addition, MANOVA studies revealed that the demographic variables affected organisational opportunities and constraints in the workplace, although individual goal engagement was not influenced by age. The findings from the pilot and main study partially supported the model of adaptive development for work related learning. Given that only four factors displayed adequate reliability in terms of internal consistency and stability, the findings suggest that individual goal selection and individual goal disengagement are less relevant to work related learning and development. Some recent research which emerged during the course of the current study has suggested that individual goal selection and individual goal disengagement are more relevant when goal achievement is impeded by biological constraints such as ageing. However, correlations between the retained factors support the model of adaptive development for work related learning, and represent the role of biocultural co-constructivism in development. Individual goal engagement was positively correlated with both opportunity factors (selection and engagement), while organisational constraints – disengagement was negatively correlated with organisational opportunities – selection. Demographic findings indicated that higher occupational status was associated with more opportunities for development. Age was associated with fewer opportunities or greater constraints for development, especially for lower status workers.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Industrial applications of the simulated-moving-bed (SMB) chromatographic technology have brought an emergent demand to improve the SMB process operation for higher efficiency and better robustness. Improved process modelling and more-efficient model computation will pave a path to meet this demand. However, the SMB unit operation exhibits complex dynamics, leading to challenges in SMB process modelling and model computation. One of the significant problems is how to quickly obtain the steady state of an SMB process model, as process metrics at the steady state are critical for process design and real-time control. The conventional computation method, which solves the process model cycle by cycle and takes the solution only when a cyclic steady state is reached after a certain number of switching, is computationally expensive. Adopting the concept of quasi-envelope (QE), this work treats the SMB operation as a pseudo-oscillatory process because of its large number of continuous switching. Then, an innovative QE computation scheme is developed to quickly obtain the steady state solution of an SMB model for any arbitrary initial condition. The QE computation scheme allows larger steps to be taken for predicting the slow change of the starting state within each switching. Incorporating with the wavelet-based technique, this scheme is demonstrated to be effective and efficient for an SMB sugar separation process. Moreover, investigations are also carried out on when the computation scheme should be activated and how the convergence of the scheme is affected by a variable stepsize.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Over the past decade there have been a large number of significant innovations in manufacturing which have resulted in more flexible and cost efficient methods and higher quality products, as manufacturers have set about upgrading their processes, systems and performance. This study compares the use of technologies and improvement programs between OECD and Non-OECD countries, and also between small and large firms, and examines differences in the use and outcomes across the economies and different sized firms. The empirical analysis provides an opportunity to test whether the ‘capabilities’ or strengths of a firm can be linked to these activities and examines if developing economies are using technology or management programs such as quality management and business process re-engineering to catch up to manufacturers in developed economies. The analysis utilises data from the second International Manufacturing Strategy Survey (IMSS), which encompasses 703 firms in 23 countries.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In a resource constrained business world, strategic choices must be made on process improvement and service delivery. There are calls for more agile forms of enterprises and much effort is being directed at moving organizations from a complex landscape of disparate application systems to that of an integrated and flexible enterprise accessing complex systems landscapes through service oriented architecture (SOA). This paper describes the deconstruction of an enterprise into business services using value chain analysis as each element in the value chain can be rendered as a business service in the SOA. These business services are explicitly linked to the attainment of specific organizational strategies and their contribution to the attainment of strategy is assessed and recorded. This contribution is then used to provide a rank order of business service to strategy. This information facilitates executive decision making on which business service to develop into the SOA. The paper describes an application of this Critical Service Identification Methodology (CSIM) to a case study.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Increasingly, software is no longer developed as a single system, but rather as a smart combination of so-called software services. Each of these provides an independent, specific and relatively small piece of functionality, which is typically accessible through the Internet from internal or external service providers. To the best of our knowledge, there are no standards or models that describe the sourcing process of these software based services (SBS). We identify the sourcing requirements for SBS and associate the key characteristics of SBS (with the sourcing requirements introduced). Furthermore, we investigate the sourcing of SBS with the related works in the field of classical procurement, business process outsourcing, and information systems sourcing. Based on the analysis, we conclude that the direct adoption of these approaches for SBS is not feasible and new approaches are required for sourcing SBS.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Increasingly, software is no longer developed as a single system, but rather as a smart combination of so-called software services. Each of these provides an independent, specific and relatively small piece of functionality, which is typically accessible through the Internet from internal or external service providers. There are no standards or models that describe the sourcing process of these software based services (SBS). The authors identify the sourcing requirements for SBS and associate the key characteristics of SBS (with the sourcing requirements introduced). Furthermore, this paper investigates the sourcing of SBS with the related works in the field of classical procurement, business process outsourcing, and information systems sourcing. Based on the analysis, the authors conclude that the direct adoption of these approaches for SBS is not feasible and new approaches are required for sourcing SBS.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

We estimate the parameters of a stochastic process model for a macroparasite population within a host using approximate Bayesian computation (ABC). The immunity of the host is an unobserved model variable and only mature macroparasites at sacrifice of the host are counted. With very limited data, process rates are inferred reasonably precisely. Modeling involves a three variable Markov process for which the observed data likelihood is computationally intractable. ABC methods are particularly useful when the likelihood is analytically or computationally intractable. The ABC algorithm we present is based on sequential Monte Carlo, is adaptive in nature, and overcomes some drawbacks of previous approaches to ABC. The algorithm is validated on a test example involving simulated data from an autologistic model before being used to infer parameters of the Markov process model for experimental data. The fitted model explains the observed extra-binomial variation in terms of a zero-one immunity variable, which has a short-lived presence in the host.