753 resultados para Architectural heritagelandscape


Relevância:

10.00% 10.00%

Publicador:

Resumo:

How does the manipulation of visual representations play a role in the practices of generating, evolving and exchanging knowledge? The role of visual representation in mediating knowledge work is explored in a study of design work of an architectural practice, Edward Cullinan Architects. The intensity of interactions with visual representations in the everyday activities on design projects is immediately striking. Through a discussion of observed design episodes, two ways are articulated in which visual representations act as 'artefacts of knowing'. As communication media they are symbolic representations, rich in meaning, through which ideas are articulated, developed and exchanged. Furthermore, as tangible artefacts they constitute material entities with which to interact and thereby develop knowledge. The communicative and interactive properties of visual representations constitute them as central elements of knowledge work. The paper explores emblematic knowledge practices supported by visual representation and concludes by pinpointing avenues for further research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Requirements management (RM), as practised in the aerospace and defence sectors, attracts interest from construction researchers in response to longstanding problems of project definition. Doubts are expressed whether RM offers a new discipline for construction practitioners or whether it repeats previous exhortations to adopt a more disciplined way of working. Whilst systems engineering has an established track record of addressing complex technical problems, its extension to socially complex problems has been challenged. The dominant storyline of RM is one of procedural rationality and RM is commonly presented as a means of controlling dilettante behaviour. Interviews with RM practitioners suggest a considerable gulf between the dominant storyline in the literature and how practitioners operate in practice. The paper challenges construction researchers interested in RM to reflect more upon the theoretical debates that underpin current equivalent practices in construction and the disparity between espoused and enacted practice.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The RIBA Plan of Work describes the way a construction process should be organized. Although not officially approved by the RIBA council, a new plan of work was published in 2000 with the intention of replacing the RIBA Plan of Work, so it is useful to analyse both in terms of the organizational structure they impose upon construction projects. Using analytical principles from organizational theory, both plans are analysed by converting them into organizational matrices and assessing their relative complexities, the load on participants, decentralization of responsibility, number of interfaces and the extent to which they provide for co-ordination and control. This demonstrates first, that the analysis of organizational structure is an appropriate approach for undertaking comparisons of such documents; and second, that while both plans of work are of roughly equal complexity, the new one is more demanding on the participants; produces a higher number of interfaces between processes, and provides for more co-ordination than the old one. Neither plan deals with controlling the output of individuals, leaving it as an internal matter for each participating organization.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – This paper proposes assessing the context within which integrated logistic support (ILS) can be implemented for whole life performance of building services systems. Design/methodology/approach – The use of ILS within a through-life business model (TLBM) is a better framework to achieve a well-designed, constructed and managed product. However, for ILS to be implemented in a TLBM for building services systems, the practices, tools and techniques need certain contextual prerequisites tailored to suit the construction industry. These contextual prerequisites are discussed. Findings – The case studies conducted reinforced the contextual importance of prime contracting, partnering and team collaboration for the application of ILS techniques. The lack of data was a major hindrance to the full realisation of ILS techniques within the case studies. Originality/value – The paper concludes with the recognition of the value of these contextual prerequisites for the use of ILS techniques within the building industry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – For many academics in UK universities the nature and orientation of their research is overwhelmingly determined by considerations of how that work will be graded in research assessment exercises (RAEs). The grades awarded to work in a particular subject area can have a considerable impact on the individual and their university. There is a need to better understand those factors which may influence these grades. The paper seeks to address this issue. Design/methodology/approach – The paper considers relationships between the grades awarded and the quantitative information provided to the assessment panels for the 1996 and 2001 RAEs for two subject areas, built environment and town and country planning, and for three other subject areas, civil engineering, geography and archaeology, in the 2001 RAE. Findings – A simple model demonstrating strong and consistent relationships is established. RAE performance relates to numbers of research active staff, the production of books and journal papers, numbers of research studentships and graduations, and research income. Important differences between subject areas are identified. Research limitations/implications – Important issues are raised about the extent to which the new assessment methodology to be adopted for the 2008 RAE will capture the essence of good quality research in architecture and built environment. Originality/value – The findings provide a developmental perspective of RAEs and show how, despite a changed methodology, various research activities might be valued in the 2008 RAE. The basis for a methodology for reviewing the credibility of the judgements of panels is proposed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Many nations are experiencing rapid rises in the life expectancy of their citizens. The implications of this major demographic shift are considerable offering opportunities as well as challenges to reconsider how people should spend their later years. A key task is enhancing the quality of life of older people through enabling them to continue to live independently even though illness, accident or frailty may have severely reduced their physical and sensory abilities and, possibly, mental health. Yet the needs of older people and disabled people have been largely ignored in the design of everyday consumer products, the home, transport systems and the built environment in general. Whilst the need for designers, engineers and technologists to provide products, environments and systems which are inclusive of all members of society is widely accepted, there is little understanding of how this can be achieved. In 1998 the UK Engineering and Physical Sciences Research Council established its EQUAL Initiative. This has encouraged design, engineering and technology researchers in universities to join with their colleagues from the social, medical and health sciences to investigate a wide range of issues experienced by older and disabled people and to propose solutions. Their research, which directly involves older and disabled people and, for example, social housing providers, social services departments, charities, engineering and architectural consultants, and transport firms, has been extremely successful. In a very short time it has influenced government policy on housing, long-term care, and building standards, and findings have been taken up by architects, designers, health-care professionals and bodies which represent older and disabled people.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to show the extent to which clients amend standard form contracts in practice, the locus of the amendments, and how contractors respond to the amendments when putting together a bid. Design/methodology/approach – Four live observational case studies were carried out in two of the top 20 UK construction firms. The whole process used to review the proposed terms and conditions of the contract was shadowed using participant observation, interview and documentary analysis. Findings – All four cases showed strong evidence of amendments relating mostly to payment and contractual aspects: 83 amendments in Case Study 1 (CS1), 80 in CS2, 15 in CS3 and 29 in CS4. This comprised clauses that were modified (37 per cent), substituted (23 per cent), deleted (7 per cent) and new additions (33 per cent). Risks inherent in the amendments were mostly addressed through contractual rather than price mechanisms, to reflect commercial imperatives. “Qualifications” and “clarifications” were included in the tender submissions for post-tender negotiations. Thus, the amendments did not necessarily influence price. There was no evidence of a “standard-form contract“ being used as such, although clients may draw on published “standard-form contracts” to derive the forms of contract actually used in practice. Practical implications – Contractors should pay attention to clauses relating to contractual and financial aspects when reviewing tender documents. Clients should draft equitable payment and contractual terms and conditions to reduce risk of dispute. Indeed, it is prudent for clients not to pass on inestimable risks. Originality/value – A better understanding of the extent and locus of amendments in standard form contracts, and how contractors respond, is provided.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In participatory design situations the competence of the facilitator will influence the opportunities for a user group to become engaged in the process of design. Based on the observation of the conversations from a series of design workshops, the performance of design facilitation expertise by an expert architect is compared with a less experienced architectural graduate. The skills that are the focus of this research are the conversational competences deployed by architects to engage users in the design of an architectural project. The difference between the conversational behaviour of a project architect and a less experienced graduate was observed to illustrate with examples the effect the performance of facilitation had on the opportunity for user engagement in design, and of learning the skill of facilitation that occurred in these situations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.