978 resultados para synchronous-transit
Resumo:
A land tortoise from a new locality at Naia, Tondela, is described. It is to be reported either to an advanced form of the genus Hadrianus or to an archaic representative of Cheirogaster; it may be included in the comprehensive genus Geochelone s.l., excluding however Ergilemys and its descendants. There is a strong possibility in favour of Cheirogaster. Testudo must also be excluded. It is not possible to classify this specimen at species'level. Our specimen does agree best with Upper Eocene Testudinidae and with some Lower Oligocene ones. Its age is certainly not Upper Oligocene or later, nor Lower and Middle Eocene. This datation is not opposed to the age of the fossiliferous clays of Naia as supposed by correlation with another locality - Côja, about 30 km to the South - which yielded an assemblage of mammals whose Ludian (Upper Bartonian s.l.) age seems well established. Naia and Côja's fossil-bearing clays must be nearly synchronous; their origin is well in place among the phenomena related to the surrection of iberian Central Chain during paroxysmal phase of pyrenean orogenesis.
Resumo:
The palynological study of sediments from lower levels of Lousã basin (Lomba do Alveite Arkoses), is presented. The palynological association includes several species of Appendicisporites and Cicatricosisporites, Costatoperforosporites sp., Ischyosporites teixeirae, Pattelasporites tavaredensis, Echinatisporis sp., Spheripollenites perinatus, Tricolpopollenites sp. and Retitricolpites maximus. The presence of the last two forms; and the absence of Normapolles, suggest an ante-Cenomanian, most probably Albian age for the assemblage. From these results, the begining of the infilling of the Lousã basin, is, at least in part, synchronous with the deposition of the «Grés Grosseiro Inferior» from the Occidental portuguese Basin. The presence of Lower Cretaceous Basin, is shown for the first time.
Resumo:
TOD (Transit Oriented Development) is typically defined as a high density mixed area (residential and commercial) within easy walking distance of a high capacity public transport station (typically within an 800m buffer area). TOO is viewed as a set of strategies to increase the use of public transport, increasing walking activity, containing urban sprawl, and creating more liveable places. It is believed that this type of combined strategies will improve sustainable growth. This work is an exploratory work for evidence of TOD characteristics in train station areas in Azambuja train line, setting further methodologies to evaluate the success of TOD areas.
Resumo:
Dissertação de Mestrado em Engenharia Informática
Resumo:
This paper deals with the computing simulation of the impact on permanent magnet synchronous generator wind turbines due to fifth harmonic content and grid voltage decrease. Power converter topologies considered in the simulations are the two-level and the three-level ones. The three-level converters are limited by unbalance voltages in the DC-link capacitors. In order to lessen this limitation, a new control strategy for the selection of the output voltage vectors is proposed. Controller strategies considered in the simulation are respectively based on proportional integral and fractional-order controllers. Finally, a comparison between the results of the simulations with the two controller strategies is presented in order to show the main advantage of the proposed strategy. (C) 2014 Elsevier Ltd. All rights reserved.
Resumo:
A thesis submitted for the degree of Doctor of Philosophy
Resumo:
This paper is on offshore wind energy conversion systems installed on the deep water and equipped with back-to-back neutral point clamped full-power converter, permanent magnet synchronous generator with an AC link. The model for the drive train is a five-mass model which incorporates the dynamic of the structure and the tower in order to emulate the effect of the moving surface. A three-level converter and a four-level converter are the two options with a fractional-order control strategy considered to equip the conversion system. Simulation studies are carried out to assess the quality of the energy injected into the electric grid. Finally, conclusions are presented. (C) 2014 Elsevier Ltd. All rights reserved.
Resumo:
A new integrated mathematical model for the simulation of offshore wind energy conversion system performance is presented in this paper. The mathematical model considers an offshore variable-speed turbine in deep water equipped with a permanent magnet synchronous generator using full-power two-level converter, converting the energy of a variable frequency source in injected energy into the electric network with constant frequency, through a high voltage DC transmission submarine cable. The mathematical model for the drive train is a concentrate two mass model which incorporates the dynamic for the structure and tower due to the need to emulate the effects of the moving surface. Controller strategy considered is a proportional integral one. Also, pulse width modulation using space vector modulation supplemented with sliding mode is used for trigger the transistor of the converter. Finally, a case study is presented to access the system performance. © 2014 IEEE.
Resumo:
European Transactions on Telecommunications, vol. 18
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Eletrotécnica Ramo de Automação e eletrónica Industrial
Resumo:
The use of Laptops and the Internet has produced the technological conditions for instructors and students can take advantage from the diversity of online information, communication, collaboration and sharing with others. The integration of Internet services in the teaching practices can be responsible for thematic, social and digital improvement for the agents involved. There are many benefits when we use a Learning Management Systems (LMS) such as Moodle, to support the lectures in higher education. We also will consider its implications for student support and online interaction, leading educational agents to a collaborating of different learning environments, where they can combine face-to-face instruction with computer-mediated instruction, blended-learning, and increases the possibilities for better quality and quantity of human communication in a learning background. In general components of learning management systems contain synchronous and asynchronous communication tools, management features, and assessment utilities. These assessment utilities allow lecturers to systematize basic assessment tasks. Assessments can be straightaway delivered to the student, and upon conclusion, immediately returned with grades and detailed feedback. Therefore learning management systems can also be used for assessment purposes in Higher Education.
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Química
Resumo:
Masters Thesis – Academic Year 2007/2008 - European Master’s Degree in Human Rights and Democratization (E.MA) - European Inter-university Centre for Human Rights and Democratization (EIUC) -Faculdade de Direito, Universidade Nova de Lisboa (UNL)
Resumo:
The palynological study of sediments from lower levels of Lousã basin (Lomba do Alveite Arkoses). is presented. The palynological association includes several species of Appendicisporites and Cicatricosisporites, Costatoperforosporites sp., Ischyosporites teixeirae, Pattelasporites tavaredensis, Echinatisporis sp., Spheripollenites perinatus, Tricolpopollenites sp. and Retitricolpites maximus. The presence of the last two forms, and the absence of Normapolles, suggest an ante-Cenomanian, most probably Albian age for the assemblage. From these results, the begining of the infilling of the Lousã basin, is, at least in part, synchronous with the deposition of the «Grés Grosseiro Inferior» from the Occidental portuguese Basin. The presence of Lower Cretaceous sediments directly overlying the Paleozoic basement, hence outside of the Occidental Portuguese Basin,is shown for the first time.
Resumo:
This paper presents a model for the simulation of an offshore wind system having a rectifier input voltage malfunction at one phase. The offshore wind system model comprises a variable-speed wind turbine supported on a floating platform, equipped with a permanent magnet synchronous generator using full-power four-level neutral point clamped converter. The link from the offshore floating platform to the onshore electrical grid is done through a light high voltage direct current submarine cable. The drive train is modeled by a three-mass model. Considerations about the smart grid context are offered for the use of the model in such a context. The rectifier voltage malfunction domino effect is presented as a case study to show capabilities of the model. (C) 2015 Elsevier Ltd. All rights reserved.