931 resultados para crew-scheduling
Resumo:
Leaf wetness duration (LWD) is related to plant disease occurrence and is therefore a key parameter in agrometeorology. As LWD is seldom measured at standard weather stations, it must be estimated in order to ensure the effectiveness of warning systems and the scheduling of chemical disease control. Among the models used to estimate LWD, those that use physical principles of dew formation and dew and/or rain evaporation have shown good portability and sufficiently accurate results for operational use. However, the requirement of net radiation (Rn) is a disadvantage foroperational physical models, since this variable is usually not measured over crops or even at standard weather stations. With the objective of proposing a solution for this problem, this study has evaluated the ability of four models to estimate hourly Rn and their impact on LWD estimates using a Penman-Monteith approach. A field experiment was carried out in Elora, Ontario, Canada, with measurements of LWD, Rn and other meteorological variables over mowed turfgrass for a 58 day period during the growing season of 2003. Four models for estimating hourly Rn based on different combinations of incoming solar radiation (Rg), airtemperature (T), relative humidity (RH), cloud cover (CC) and cloud height (CH), were evaluated. Measured and estimated hourly Rn values were applied in a Penman-Monteith model to estimate LWD. Correlating measured and estimated Rn, we observed that all models performed well in terms of estimating hourly Rn. However, when cloud data were used the models overestimated positive Rn and underestimated negative Rn. When only Rg and T were used to estimate hourly Rn, the model underestimated positive Rn and no tendency was observed for negative Rn. The best performance was obtained with Model I, which presented, in general, the smallest mean absolute error (MAE) and the highest C-index. When measured LWD was compared to the Penman-Monteith LWD, calculated with measured and estimated Rn, few differences were observed. Both precision and accuracy were high, with the slopes of the relationships ranging from 0.96 to 1.02 and R-2 from 0.85 to 0.92, resulting in C-indices between 0.87 and 0.93. The LWD mean absolute errors associated with Rn estimates were between 1.0 and 1.5h, which is sufficient for use in plant disease management schemes.
Resumo:
Due to the rapid depletion of water resources, water must be used more efficiently in agriculture to maintain current levels of yield in irrigated areas. The efficiency of irrigation systems can be increased by adjusting the amount of water applied to specific conditions of soil and crop, which may vary in a field. Taking into account spatial and temporal variability, it is evident that an equipment capable of providing different irrigation levels is necessary to meet the water requirement of the soil. This work aims to develop and evaluate a flow rate sprinkler to be used in center pivots or linear moving irrigation systems, with potential for utilization in irrigation scheduling. A prototype was developed by duplicating its calibrations, and discharge coefficient adjustment was carried out in the laboratory. To predict the flow rate, a successful model that represented the operation of the flow rate sprinkler was established. The calibration of the flow rate sprinkler prototype showed satisfactory statistical and technical results. Automation of the prototype was achieved by driving a step motor using communication from the parallel port of a microcomputer, which was controlled by a software developed for this purpose. The results were satisfactory and technically feasible.
Resumo:
The present study examined the effects of work control and job demands on employee adjustment and work performance using a multidimensional measure of work control (assessing levels of task control, decision control and work scheduling control). It was proposed that the negative effects of job demands and employee adjustment would be moderated by high levels of task control. It was also proposed that there would be evidence of main effects of both job demands and work control (particularly task-related levels of control) on employee adjustment. To test these predictions, a study of 135 university employees holding administrative positions was undertaken. Methodological improvements over previous research included the use of both self-reported adjustment measures and supervisor ratings of work performance as outcome variables, and the assessment of the predictor and outcome measures at different points in time (self-reported adjustment was assessed at both Times 1 and 2). The results revealed some support for the proposal that the effects of job demands would be buffered by high levels of task control, but not more peripheral aspects of work control. There were also significant main effects of task control on job satisfaction.
Resumo:
This paper seeks to understand how software systems and organisations co-evolve in practice and how order emerges in the overall environment. Using a metaphor of timetable as a commons, we analyse the introduction of a novel academic scheduling system to demonstrate how Complex Adaptive Systems theory provides insight into the adaptive behaviour of the various actors and how their action is both a response to and a driver of co-evolution within the engagement.
Resumo:
Leaf water potential (psi (l)) represents a good indicator of the water status of plants, and continuous monitoring of it can be useful in research and field applications such as scheduling irrigation. Changes in stem diameter (Sd) were used for monitoring psi (l) of pot-grown sorghum [Sorghum bicolor (L.) Moench] plants in a glasshouse. This method requires occasional calibration of S-d values against psi (l). Predicted values of psi (l), based on a single calibration show a good correlation with measured psi (l), values over a period of 13 d before and after the calibration. The correlation can further be improved with shorter time intervals.
Resumo:
A atenção primária visa garantir cobertura e acesso a cuidados de saúde abrangentes e aceitáveis pela população enfatizando a prevenção e a educação (STARFIELD, 2004). No Brasil a Estratégia Saúde da Família (ESF) é o modelo implantado pelo Ministério da Saúde (MS) com a finalidade de reestruturação da atenção primária e já abrange cerca de 50% da população. Segundo Starfield (2004) a atenção primária pode ser avaliada através de seus atributos essenciais: atenção de primeiro contato (utilização e acessibilidade), longitudinalidade, integralidade e coordenação de cuidados. No contexto da atenção à saúde brasileira, a mortalidade infantil é fato preocupante, principalmente a mortalidade que ocorre nos primeiros dias de vida. Este componente da mortalidade é intimamente relacionado à qualidade da atenção recebida no período gestacional. A atenção pré-natal deve incluir ações organizadas, amplas, integradas e com cobertura abrangente de promoção e prevenção da saúde, além de diagnóstico e tratamento adequado dos problemas que possam vir a ocorrer nesse período. O objetivo do presente estudo foi analisar o pré-natal de um grupo de puérperas quanto aos atributos da atenção primária acessibilidade e longitudinalidade. Para alcançar este objetivo foram realizadas 80 entrevistas com mulheres que realizaram pré-natal na atenção primária e 19 mulheres que realizaram pré-natal no Hospital Universitário Cassiano Antônio de Moraes (HUCAM). Utilizou-se parcialmente o questionário de avaliação da atenção primária PCATool. As puérperas também foram questionadas quanto à percepção da adequação do pré-natal realizado. A acessibilidade foi baixa para a maioria das entrevistadas. Nas puérperas que realizaram o pré-natal na Atenção primária a acessibilidade foi estatisticamente maior naquelas que realizaram pré-natal na ESF e naquelas que utilizaram as unidades de saúde do município de Vitória (ES). A longitudinalidade se relacionou ao tipo de unidade de saúde do pré-natal, ao número de consultas realizadas e ao índice de Ápgar no primeiro minuto. A percepção de um pré-natal adequado se relacionou com a utilização da ESF como serviço de pré-natal e à realização de seis ou mais consultas. Apesar de as puérperas do grupo que realizou o pré-natal no HUCAM perceberem o atendimento pré-natal como adequado, algumas questões revelaram fragilidades na assistência, principalmente quanto ao acesso ao serviço. A impossibilidade de receber atendimento pela equipe fora dos horários de funcionamento do ambulatório, a falta de um número de telefone no qual possam sanar dúvidas ou falar com o médico responsável pelo pré-natal, a percepção de dificuldade na marcação de consultas e a espera prolongada no dia do atendimento são pontos que devem ser melhorados nessa assistência.
Resumo:
The exponential increase of home-bound persons who live alone and are in need of continuous monitoring requires new solutions to current problems. Most of these cases present illnesses such as motor or psychological disabilities that deprive of a normal living. Common events such as forgetfulness or falls are quite common and have to be prevented or dealt with. This paper introduces a platform to guide and assist these persons (mostly elderly people) by providing multisensory monitoring and intelligent assistance. The platform operates at three levels. The lower level, denominated ‘‘Data acquisition and processing’’performs the usual tasks of a monitoring system, collecting and processing data from the sensors for the purpose of detecting and tracking humans. The aim is to identify their activities in an intermediate level called ‘‘activity detection’’. The upper level, ‘‘Scheduling and decision-making’’, consists of a scheduler which provides warnings, schedules events in an intelligent manner and serves as an interface to the rest of the platform. The idea is to use mobile and static sensors performing constant monitoring of the user and his/her environment, providing a safe environment and an immediate response to severe problems. A case study on elderly fall detection in a nursery home bedroom demonstrates the usefulness of the proposal.
Resumo:
Cognitive impaired population face with innumerable problems in their daily life. Surprisingly, they are not provided with any help to perform those tasks for which they have difficulties. As a consequence, it is necessary to develop systems that allow those people to live independently and autonomously. Living in a technological era, people could take advantage of the available technology, being provided with some solutions to their needs. This paper presents a platform that assists users with remembering where their possessions are. Mainly, an object recognition process together with an intelligent scheduling applications are integrated in an Ambient Assisted Living (AAL) environment.
Resumo:
The progressive aging of the population requires new kinds of social and medical intervention and the availability of different services provided to the elder population. New applications have been developed and some services are now provided at home, allowing the older people to stay home instead of having to stay in hospitals. But an adequate response to the needs of the users will imply a high percentage of use of personal data and information, including the building up and maintenance of user profiles, feeding the systems with the data and information needed for a proactive intervention in scheduling of events in which the user may be involved. Fundamental Rights may be at stake, so a legal analysis must also be considered.
Resumo:
In recent years, power systems have experienced many changes in their paradigm. The introduction of new players in the management of distributed generation leads to the decentralization of control and decision-making, so that each player is able to play in the market environment. In the new context, it will be very relevant that aggregator players allow midsize, small and micro players to act in a competitive environment. In order to achieve their objectives, virtual power players and single players are required to optimize their energy resource management process. To achieve this, it is essential to have financial resources capable of providing access to appropriate decision support tools. As small players have difficulties in having access to such tools, it is necessary that these players can benefit from alternative methodologies to support their decisions. This paper presents a methodology, based on Artificial Neural Networks (ANN), and intended to support smaller players. In this case the present methodology uses a training set that is created using energy resource scheduling solutions obtained using a mixed-integer linear programming (MIP) approach as the reference optimization methodology. The trained network is used to obtain locational marginal prices in a distribution network. The main goal of the paper is to verify the accuracy of the ANN based approach. Moreover, the use of a single ANN is compared with the use of two or more ANN to forecast the locational marginal price.
Resumo:
In this paper, a novel mixed-integer nonlinear approach is proposed to solve the short-term hydro scheduling problem in the day-ahead electricity market, considering not only head-dependency, but also start/stop of units, discontinuous operating regions and discharge ramping constraints. Results from a case study based on one of the main Portuguese cascaded hydro energy systems are presented, showing that the proposedmixed-integer nonlinear approach is proficient. Conclusions are duly drawn. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
The large penetration of intermittent resources, such as solar and wind generation, involves the use of storage systems in order to improve power system operation. Electric Vehicles (EVs) with gridable capability (V2G) can operate as a means for storing energy. This paper proposes an algorithm to be included in a SCADA (Supervisory Control and Data Acquisition) system, which performs an intelligent management of three types of consumers: domestic, commercial and industrial, that includes the joint management of loads and the charge/discharge of EVs batteries. The proposed methodology has been implemented in a SCADA system developed by the authors of this paper – the SCADA House Intelligent Management (SHIM). Any event in the system, such as a Demand Response (DR) event, triggers the use of an optimization algorithm that performs the optimal energy resources scheduling (including loads and EVs), taking into account the priorities of each load defined by the installation users. A case study considering a specific consumer with several loads and EVs is presented in this paper.
Resumo:
Power system organization has gone through huge changes in the recent years. Significant increase in distributed generation (DG) and operation in the scope of liberalized markets are two relevant driving forces for these changes. More recently, the smart grid (SG) concept gained increased importance, and is being seen as a paradigm able to support power system requirements for the future. This paper proposes a computational architecture to support day-ahead Virtual Power Player (VPP) bid formation in the smart grid context. This architecture includes a forecasting module, a resource optimization and Locational Marginal Price (LMP) computation module, and a bid formation module. Due to the involved problems characteristics, the implementation of this architecture requires the use of Artificial Intelligence (AI) techniques. Artificial Neural Networks (ANN) are used for resource and load forecasting and Evolutionary Particle Swarm Optimization (EPSO) is used for energy resource scheduling. The paper presents a case study that considers a 33 bus distribution network that includes 67 distributed generators, 32 loads and 9 storage units.
Resumo:
This paper presents a Unit Commitment model with reactive power compensation that has been solved by Genetic Algorithm (GA) optimization techniques. The GA has been developed a computational tools programmed/coded in MATLAB. The main objective is to find the best generations scheduling whose active power losses are minimal and the reactive power to be compensated, subjected to the power system technical constraints. Those are: full AC power flow equations, active and reactive power generation constraints. All constraints that have been represented in the objective function are weighted with a penalty factors. The IEEE 14-bus system has been used as test case to demonstrate the effectiveness of the proposed algorithm. Results and conclusions are dully drawn.
Resumo:
OBJECTIVE: To extend an existing computer programme for the evaluation and design of shift schedules (BASS 3) by integrating workload as well as economic aspects. METHODS: The redesigned prototype BASS 4 includes a new module with a suitable and easily applicable screening method (EBA) for the assessment of the intensity of physical, emotional and cognitive workload components and their temporal patterns. Specified criterion functions based on these ratings allow for an adjustment of shift and rest duration according to the intensity of physical and mental workload. Furthermore, with regard to interactive effects both workload and temporal conditions, e.g. time of day, are taken into account. In a second new module, important economic aspects and criteria have been implemented. Different ergonomic solutions for scheduling problems can now also be evaluated with regard to their economic costs. RESULTS: The new version of the computer programme (BASS 4) can now simultaneously take into account numerous ergonomic, legal, agreed and economic criteria for the design and evaluation of working hours. CONCLUSIONS: BASS 4 can now be used as an instrument for the design and the evaluation of working hours with regard to legal, ergonomic and economic aspects at the shop floor as well as in administrative (e.g. health and safety inspection) and research problems.