809 resultados para Service innovation adoption
Resumo:
Innovation processes are rarely smooth and disruptions often occur at transition points were one knowledge domain passes the technology on to another domain. At these transition points communication is a key component in assisting the smooth hand over of technologies. However for smooth transitions to occur we argue that appropriate structures have to be in place and boundary spanning activities need to be facilitated. This paper presents three case studies of innovation processes and the findings support the view that structures and boundary spanning are essential for smooth transitions.
Resumo:
An undeniable shift in focus from traditional production companies to Knowledge-Intensive Firms (KIFs) poses challenges for academics and practioners alike. In particular, effective management of an organization's human resources has become a critical issue for ensuring sustained innovation capacity. The relationship between Human Resource Management (HRM) in KIFs is however still a largely unexplored arena. The objective of this paper is to explore this relationship in an effort to identify HRM practices that support innovation. To this end, the paper includes reviews of the literature relevant to HRM and innovation in KIFs and four case studies from companies in Denmark and Australia that have been recognized for excellence in innovation. On the basis of content analyses conducted on the case data, some preliminary conclusions are posited regarding the role of HRM in KIFs. More specifically, the findings from this study suggest that while there are commonalities between HRM practices in traditional manufacturing companies and KIFs, there are also important differences, especially in terms of staffing practices. The paper contributes by offering recommendations for management of HRM in innovative KIFs and potential avenues for research to further develop our understanding of how HRM can support innovation in KIFs.
Resumo:
Work environments have previously been studied to identify the strategies, structures and processes which increase the likelihood of creativity, innovation and collaboration for productive workplaces. A number of perspectives have emerged which identify social and cognitive factors known to contribute to or to restrict innovation and collaboration. Recently more attention has been given to designing physical environments to encourage processes relevant to innovation such as creativity (McCoy & Evans, 2002) knowledge sharing (Hemlin, Allwood & Martin, 2008) and collaboration (Bozeman & Corley, 2004). Some attention has been given specifically to research and development environments (Boutellier et al, 2008) but little integration of this research has occurred. In the context of the construction of new purpose-built premises which will bring together under one roof separate public sector agencies engaged in research and development in agriculture, natural resource systems and the environment, this paper examines the extant literature and develops initial propositions for research relevant to the transition, collaboration and performance of research and development in new organizational environments where traditional boundaries have been redrawn.
Resumo:
Supply chain relationships between firms are increasingly important in terms of both competitiveness and developing dynamic capability to respond to rapid changes in the market. Innovation capacity both in firms and in supply chains is also integral to responding to dynamic markets and customer needs. This explorative research examines a sample of firms active in supply chain relationships in Australia, as a pilot study, to examine any linkages between firm dynamic capabilities and supply chains developing innovative capacity to meet competitive and market changes. Initial findings indicate that although firms focus on developing capabilities, particularly dynamic capabilities to innovate individually, these preliminary findings indicate little reliance on developing their supply chain innovation capacity. This study is the initial stage of more extensive research on this topic.
Resumo:
An emerging source of competitive advantage for service industries is the knowledge, skills and attitudes of their employees. Indeed, achievement of a 'service quality' culture, considered imperative for competitive advantage in service organisations, supposedly results from the use of best practice human resource management (HRM), and from a strategic approach to their implementation. This paper empirically explores the use of these dimensions of HRM as a source of competitive advantage. It finds high-performing service organisations actively engage best practices across the areas of recruitment and selection, training and development, communication and team working. Evidence of a strategic approach to the implementation of these practices is also found.
Resumo:
The effective management of bridge stock involves making decisions as to when to repair, remedy, or do nothing, taking into account the financial and service life implications. Such decisions require a reliable diagnosis as to the cause of distress and an understanding of the likely future degradation. Such diagnoses are based on a combination of visual inspections, laboratory tests on samples and expert opinions. In addition, the choice of appropriate laboratory tests requires an understanding of the degradation mechanisms involved. Under these circumstances, the use of expert systems or evaluation tools developed from “realtime” case studies provides a promising solution in the absence of expert knowledge. This paper addresses the issues in bridge infrastructure management in Queensland, Australia. Bridges affected by alkali silica reaction and chloride induced corrosion have been investigated and the results presented using a mind mapping tool. The analysis highights that several levels of rules are required to assess the mechanism causing distress. The systematic development of a rule based approach is presented. An example of this application to a case study bridge has been used to demonstrate that preliminary results are satisfactory.
Resumo:
n design of bridge structures, it is common to adopt a 100 year design life. However, analysis of a number of case study bridges in Australia has indicated that the actual design life can be significantly reduced due to premature deterioration resulting from exposure to aggressive environments. A closer analysis of the cost of rehabilitation of these structures has raised some interesting questions. What would be the real service life of a bridge exposed to certain aggressive environments? What is the strategy of conducting bridge rehabilitation? And what are the life cycle costs associated with rehabilitation? A research project funded by the CRC for Construction Innovation in Australia is aimed at addressing these issues. This paper presents a concept map for assisting decision makers to appropriately choose the best treatment for bridge rehabilitation affected by premature deterioration through exposure to aggressive environments in Australia. The decision analysis is referred to a whole of life cycle cost analysis by considering appropriate elements of bridge rehabilitation costs. In addition, the results of bridges inspections in Queensland are presented
Resumo:
There are about 2500 bridges in Queensland, Australia. Majority of these structures require significant repairs around the halfway mark of their design life with probably 1% or less reaching a 100 year design life. (Carse, 2005). This is due to the fact that bridges constructed in aggressive environments such as the coastal regions experience accelerated deterioration. As a result, maintaining the service delivery of these assets has become one of the important issues for the Queensland Department of Main Roads (QDMR).
Resumo:
Objective-To establish the demographic, health status and insurance determinants of pre-hospital ambulance non-usage for patients with emergency medical needs. Methods-Triage category, date of birth, sex, marital status, country of origin, method and time of arrival, ambulance insurance status, diagnosis, and disposal were collected for all patients who presented over a four month period (n=10 229) to the emergency department of a major provincial hospital. Data for patients with urgent (n=678) or critical care needs (n=332) who did not use pre-hospital care were analysed using Poisson regression. Results-Only a small percentage (6.6%) of the total sample were triaged as having urgent medical needs or critical care needs (3.2%). Predictors of usage for those with urgent care needs included age greater than 65 years (prevalence ratio (PR)=0.54; 95% confidence interval (CI)= 0.35 to 0.83), being admitted to intensive care or transferred to another hospital (PR=0.62; 95% CI=0.44 to 0.89) or ward (PR=0.72; 95% CI=0.56 to 0.93) and ambulance insurance status (PR=0.67; 95% CI=052 to 0.86). Sex, marital status, time of day and country of origin were not predictive of usage and non-usage. Predictors of usage for those with critical care needs included age 65 years or greater (PR=0.45; 95% CI=0.25 to 0.81) and a diagnosis of trauma (PR=0.49; 95% CI=0.26 to 0.92). A non-English speaking background was predictive of non-usage (PR=1.98; 95% CI=1.06 to 3.70). Sex, marital status, time of day, triage and ambulance insurance status were not predictive of non-usage. Conclusions-Socioeconomic and medical factors variously influence ambulance usage depending on the severity or urgency of the medical condition. Ambulance insurance status was less of an influence as severity of condition increased suggesting that, at a critical level of urgency, patients without insurance are willing to pay for a pre-hospital ambulance service.
Resumo:
One of the key issues facing public asset owners is the decision of refurbishing aged built assets. This decision requires an assessment of the “remaining service life” of the key components in a building. The remaining service life is significantly dependent upon the existing condition of the asset and future degradation patterns considering durability and functional obsolescence. Recently developed methods on Residual Service Life modelling, require sophisticated data that are not readily available. Most of the data available are in the form of reports prior to undertaking major repairs or in the form of sessional audit reports. Valuable information from these available sources can serve as bench marks for estimating the reference service life. The authors have acquired similar informations from a public asset building in Melbourne. Using these informations, the residual service life of a case study building façade has been estimated in this paper based on state-of-the-art approaches. These estimations have been evaluated against expert opinion. Though the results are encouraging it is clear that the state-of-the-art methodologies can only provide meaningful estimates provided the level and quality of data are available. This investigation resulted in the development of a new framework for maintenance that integrates the condition assessment procedures and factors influencing residual service life
Resumo:
With an increase in growing number of aging public building infrastructure globally, there is an opportunity for an efficient life care management rather then mere demolition and rebuild. By carefully implementing appropriate structural engineering practices with facility management, the whole of life cycle costs for public building assets can be optimised and public money can be saved and better utilised elsewhere. A need of decision support tool/methodology which can assist asset manager make better decision among demolish, refurbish, do nothing or rebuilt option for any typical building under consideration is growing in order to optimise maintenance funds. The paper is part of research project focusing on development of such methodology known as residual service life prediction. The paper is mainly focusing on following three major aspects of public building infrastructure; first, issues and challenges in optimisation of maintenance funds, second, residual service life prediction methodology and issues and challenges in the development of such methodology. The paper concludes with the authors’ observations and further research potentials
Resumo:
The outcomes of a two-pronged 'real-world' learning project, which aimed to expand the views of pre-service teachers about learning, pedagogy and diversity, will be discussed in this paper. Seventy-two fourth-year and 22 first-year students, enrolled in a Bachelor of Education degree in Queensland, Australia, were engaged in community sites outside of university lectures, and separate from their practicum. Using Butin's conceptual framework for service learning, we show evidence that this approach can enable pre-service teachers to see new realities about the dilemmas and ambiguities of performing as learners and as teachers. We contend that when such 'real-world' experiences have different foci at different times in their four-year degree, pre-service teachers have more opportunities to develop sophisticated understandings of pedagogy in diverse contexts for diverse learners.
Resumo:
The Australian construction industry is moving towards the implementation of a voluntary code of practice (VCP) for occupational health and safety (OHS). The evidence suggests that highly-visible clients and project management firms, in addition to their subcontractors, will embrace such a code, while smaller firms not operating in high-profile contracting regimes may prove reticent. This paper incorporates qualitative data from a research project commissioned by Engineers Australia and supported by the Australian Contractors’ Association, Property Council of Australia, Royal Australian Institute of Architects, Association of Consulting Engineers Australia, Australian Procurement and Construction Council, Master Builders Australia and the Australian CRC for Construction Innovation. The paper aims to understand the factors that facilitate or prevent the uptake of the proposed VCP by smaller firms, together with pathways to adoption.
Resumo:
The Australian construction industry, reflecting a global trend, is moving towards the implementation of a voluntary code of practice (hereafter VCP) for occupational health and safety. The evidence suggests that highlyvisible clients and project management firms, in addition to their subcontractors, look set to embrace such a code. However, smaller firms not operating in high-profile contracting regimes may prove reticent to adopt a VCP. This paper incorporates qualitative data from a high-profile research project commissioned by Engineers Australia and supported by the Australian Contractors’ Association, Property Council of Australia, Royal Australian Institute of Architects, Association of Consulting Engineers Australia, Australian Procurement and Construction Council, Master Builders Australia and the Australian CRC for Construction Innovation. The paper aims to understand the factors that facilitate or prevent the uptake of the VCP by smaller firms, together with pathways to the adoption of a VCP by industry.
Resumo:
Understanding the differences between the temporal and physical aspects of the building life cycle is an essential ingredient in the development of Building Environmental Assessment (BEA) tools. This paper illustrates a theoretical Life Cycle Assessment (LCA) framework aligning temporal decision-making with that of material flows over building development phases. It was derived during development of a prototype commercial building design tool that was based on a 3-D CAD information and communications technology (ICT) platform and LCA software. The framework aligns stakeholder BEA needs and the decision-making process against characteristics of leading green building tools. The paper explores related integration of BEA tool development applications on such ICT platforms. Key framework modules are depicted and practical examples for BEA are provided for: • Definition of investment and service goals at project initiation; • Design integrated to avoid overlaps/confusion over the project life cycle; • Detailing the supply chain considering building life cycle impacts; • Delivery of quality metrics for occupancy post-construction/handover; • Deconstruction profiling at end of life to facilitate recovery.