907 resultados para Replacement decision optimization model for group scheduling (RDOM-GS)


Relevância:

40.00% 40.00%

Publicador:

Resumo:

There have been many models developed by scientists to assist decision-makers in making socio-economic and environmental decisions. It is now recognised that there is a shift in the dominant paradigm to making decisions with stakeholders, rather than making decisions for stakeholders. Our paper investigates two case studies where group model building has been undertaken for maintaining biodiversity in Australia. The first case study focuses on preservation and management of green spaces and biodiversity in metropolitan Melbourne under the umbrella of the Melbourne 2030 planning strategy. A geographical information system is used to collate a number of spatial datasets encompassing a range of cultural and natural assets data layers including: existing open spaces, waterways, threatened fauna and flora, ecological vegetation covers, registered cultural heritage sites, and existing land parcel zoning. Group model building is incorporated into the study through eliciting weightings and ratings of importance for each datasets from urban planners to formulate different urban green system scenarios. The second case study focuses on modelling ecoregions from spatial datasets for the state of Queensland. The modelling combines collaborative expert knowledge and a vast amount of environmental data to build biogeographical classifications of regions. An information elicitation process is used to capture expert knowledge of ecoregions as geographical descriptions, and to transform this into prior probability distributions that characterise regions in terms of environmental variables. This prior information is combined with measured data on the environmental variables within a Bayesian modelling technique to produce the final classified regions. We describe how linked views between descriptive information, mapping and statistical plots are used to decide upon representative regions that satisfy a number of criteria for biodiversity and conservation. This paper discusses the advantages and problems encountered when undertaking group model building. Future research will extend the group model building approach to include interested individuals and community groups.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

An individual faced with intergroup conflict chooses A from a vast array of possible actions, ranging from grumbling among ingroup friends to voting and demonstrating to rioting and revolution. The present paper conceptualises these intergroup choices as rationally shaped by perceptions of the benefits and costs associated with the action (expectancy-value processes). However, in presenting a model of agentic normative influence, it is argued that in intergroup contexts group-level costs and benefits play a critical role in individuals' decision-making. In the context of English-French conflict in Quebec, in Canada, four studies provide evidence that group-level costs and benef influence individuals' decision-making in intergro conflict; that the individual level of analysis need mediate the group level of analysis; that group-level co and benefits mediate the relationship between soc identity and intentions to engage in collective action; a that perceptions of outgroup and ingroup norms for inte group behaviours are relatively invariant and predictal related to perceptions of the group- and individual-le, benefits and costs associated with individualistic vers collective actions. By modelling the relationship betwe group norms and group-level costs and benefits, soc psychologists may begin to address the processes th underlie identity-behaviour relationships in collecti action and intergroup conflict.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose - To provide an example of the use of system dynamics within the context of a discrete-event simulation study. Design/methodology/approach - A discrete-event simulation study of a production-planning facility in a gas cylinder-manufacturing plant is presented. The case study evidence incorporates questionnaire responses from sales managers involved in the order-scheduling process. Findings - As the project progressed it became clear that, although the discrete-event simulation would meet the objectives of the study in a technical sense, the organizational problem of "delivery performance" would not be solved by the discrete-event simulation study alone. The case shows how the qualitative outcomes of the discrete-event simulation study led to an analysis using the system dynamics technique. The system dynamics technique was able to model the decision-makers in the sales and production process and provide a deeper understanding of the performance of the system. Research limitations/implications - The case study describes a traditional discrete-event simulation study which incorporated an unplanned investigation using system dynamics. Further, case studies using a planned approach to showing consideration of organizational issues in discrete-event simulation studies are required. Then the role of both qualitative data in a discrete-event simulation study and the use of supplementary tools which incorporate organizational aspects may help generate a methodology for discrete-event simulation that incorporates human aspects and so improve its relevance for decision making. Practical implications - It is argued that system dynamics can provide a useful addition to the toolkit of the discrete-event simulation practitioner in helping them incorporate a human aspect in their analysis. Originality/value - Helps decision makers gain a broader perspective on the tools available to them by showing the use of system dynamics to supplement the use of discrete-event simulation. © Emerald Group Publishing Limited.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper focuses on minimizing printed circuit board (PCB) assembly time for a chipshootermachine, which has a movable feeder carrier holding components, a movable X–Y table carrying a PCB, and a rotary turret with multiple assembly heads. The assembly time of the machine depends on two inter-related optimization problems: the component sequencing problem and the feeder arrangement problem. Nevertheless, they were often regarded as two individual problems and solved separately. This paper proposes two complete mathematical models for the integrated problem of the machine. The models are verified by two commercial packages. Finally, a hybrid genetic algorithm previously developed by the authors is presented to solve the model. The algorithm not only generates the optimal solutions quickly for small-sized problems, but also outperforms the genetic algorithms developed by other researchers in terms of total assembly time.