899 resultados para Recycled aggregate concrete
Resumo:
This project utilized information from ground penetrating radar (GPR) and visual inspection via the pavement profile scanner (PPS) in proof-of-concept trials. GPR tests were carried out on a variety of portland cement concrete pavements and laboratory concrete specimens. Results indicated that the higher frequency GPR antennas were capable of detecting subsurface distress in two of the three pavement sites investigated. However, the GPR systems failed to detect distress in one pavement site that exhibited extensive cracking. Laboratory experiments indicated that moisture conditions in the cracked pavement probably explain the failure. Accurate surveys need to account for moisture in the pavement slab. Importantly, however, once the pavement site exhibits severe surface cracking, there is little need for GPR, which is primarily used to detect distress that is not observed visually. Two visual inspections were also conducted for this study by personnel from Mandli Communications, Inc., and the Iowa Department of Transportation (DOT). The surveys were conducted using an Iowa DOT video log van that Mandli had fitted with additional equipment. The first survey was an extended demonstration of the PPS system. The second survey utilized the PPS with a downward imaging system that provided high-resolution pavement images. Experimental difficulties occurred during both studies; however, enough information was extracted to consider both surveys successful in identifying pavement surface distress. The results obtained from both GPR testing and visual inspections were helpful in identifying sites that exhibited materials-related distress, and both were considered to have passed the proof-of-concept trials. However, neither method can currently diagnose materials-related distress. Both techniques only detected the symptoms of materials-related distress; the actual diagnosis still relied on coring and subsequent petrographic examination. Both technologies are currently in rapid development, and the limitations may be overcome as the technologies advance and mature.
Resumo:
Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.
Resumo:
The road paving cost continues to increase and the backlog of projects waiting for funding is growing. Finding a more cost-effective way to use the available money to pave roads will result in more miles of road being paved with the same amount of money. This project is in Cass County on G35 between US 71 and Norway-Center. It consists of a thin layer of asphalt over a base designed to achieve stability while having some permeability. This project was paved in 1996. An asphalt cement concrete pavement was chosen for the project based on cost, convenience, and historic portland cement concrete problems in Cass County. The new pavement gives quicker access time to farms and residences.
Resumo:
Testing the efficiency of Portland Cement Concrete (PCC) curing compounds is currently done following Test Method Iowa 901-D, May 2002. Concrete test specimens are prepared from mortar materials and are wet cured 5 hours before the curing compound is applied. All brands of curing compound submitted to the Iowa Department of Transportation are laboratory tested for comparative performance under the same test conditions. These conditions are different than field PCC paving conditions. Phase I tests followed Test Method Iowa 901-D, but modified the application amounts of the curing compound. Test results showed that the application of two coats of one-half thickness each increased efficiency compared to one full thickness coat. Phase II tests also used the modified application amounts, used a concrete mix (instead of a mortar mix) and applied curing compound a few minutes after molding. Measurements of losses, during spraying of the curing compound, were noted and were found to be significant. Test results showed that application amounts, testing techniques, concrete specimen mix design and spray losses do influence the curing compound efficiency. The significance of the spray losses indicates that the conventional test method being used (Iowa 901 D) should be revised.
Resumo:
The Iowa DOT has been using blended cements in ternary mixes since 1999. Use of these supplementary cementitious materials gives concrete with higher strengths and much lower permeability. Use of these materials has been incorporated for use in High Performance Concrete (HPC) decks to achieve lower permeability and thus long term performance. Since we have been using these materials in paving, it would be informative to determine what concrete pavement properties are enhanced as related to high performance concrete. The air void system was excellent at a spacing factor of 0.0047 in (0.120 mm). AVA spacing factor results are much higher than the hardened air void analysis. Although only 3 samples were tested between the image analysis air content and the RapidAir457, there is pretty good agreement between those test methods. Air void analysis indicates that excessive vibration was not required to place the concrete. Vibration was well within the specification limits with an average of 6683 vpm’s with a standard deviation of 461. Overall ride of the project was very good. The average smoothness for the project was 2.1 in/mile (33.8 mm/km). The International Roughness Index (IRI) was 81 in/mi (1.29 m/km). The compressive strength was 6260 psi (43.2 MPa) at 28 days and 6830 (47.1 MPa) at 56 days. The modulus of rupture by third point loading (MOR-TPL) tested at 28 days was 660 psi (4.55 MPa). The AASHTO T277 rapid chloride permeability results at 28 days using the Virginia cure method correlate fairly well with the 56 and 90 day results with standard curing. The Virginia cure method 28 day results were 2475 coulombs and the standard cure 56 and 90 day test results were 2180 and 2118, respectively.
Resumo:
Portland cement concrete pavements have given excellent service history for Iowa. Many of these pavements placed during the 1920’s and 1930’s are still in service today. Many factors go in to achieve a long term durable concrete pavement. Probably the most important is the durability of the aggregate. Until the 1930’s, pit run gravel was the most predominant aggregate used. Many of these gravels provided long term performance and their durability is dependent upon the carbonate fraction of the gravel. Later, limestone (calcium carbonate) and dolomite (calcium, magnesium carbonate) sources were mined across Iowa. The durability of these carbonate aggregates is largely dependent upon the pore system which can cause freeze thaw problems known as D-cracking, which was a problem with some sources during the 1960’s. Also, some of these carbonate aggregates are also susceptible to deterioration from deicing salts. Geologists have identified the major components that affect the durability of these carbonate aggregates and sources are tested to ensure long term performance in Portland cement concrete. Air entrainment was originally put in concrete to improve scaling resistance. It is well known that air entrainment is required to provide freeze thaw protection in concrete pavements today. In Iowa, air entrainment was not introduced in concrete pavements until 1952. This research investigates properties that made older concrete pavements durable without air entrainment.
Resumo:
The Iowa State Highway Commission Laboratory is called upon to determine the cement content of hardened concrete when field problems relating to batch weights are encountered. The standard test for determining the cement content is ASTM C-85. An investigation of this method by the New Jersey State Highway Department involving duplicate samples and four cooperating laboratories produced very erratic results, however, the results obtained by this method have not been directly compared to known cement contents of concrete made with various cements and various aggregates used in Iowa.
Resumo:
The paper reviews methods, materials, equipment and results to date of sprinkle treatment within the state. The Iowa Department of Transportation formerly the Iowa State Highway Commission, made its first attempts at sprinkle treatment of fresh asphalt concrete in 1974. Increased emphasis in mix design of asphalt mixes and aggregate selection of durable non-polishing materials has generated costly restrictions on the use of local materials. During the summer of 1975, a dual spinner, tail-gate spreader was mounted on a standard departmental dump truck to attempt additional sprinkle treatment on a section of Iowa 7 west of Ft. Dodge. The dump truck equipment was marginally satisfactory, but results of increased surface skid texture and durability were well demonstrated. On 1976 a new, current order dump truck was modified with an auxiliary transmission and a set of slick surfaced tires, and dual spinner spreader was mounted to again attempt surface sprinkle treatment, which was conducted in 1977.
Resumo:
The Iowa D.O.T. has a classification system designed to rate coarse aggregates as to their skid resistant characteristics. Aggregates have been classified into five functional types, with a Type 1 being the most skid resistant. A complete description of the classification system can be found in the Office of Materials Instructional Memorandum T-203. Due to the variability of ledges within any given quarry the classification of individual ledges becomes necessary. The type of aggregate is then specified for each asphaltic concrete surface course. As various aggregates become used in a.c. paving, there is a continuing process of evaluating the frictional properties of the pavement surface. It is primarily through an effort of this sort that information on aggregate sources and individual ledges becomes more refined. This study is being conducted to provide that needed up-to-date information that can be used to monitor the aggregate classification system.
Resumo:
The Iowa D.O.T. specifications do not require 100 percent of 50 blow Marshall density (generally 94%) for field compaction. However, stabilities are determined in the Laboratory on specimens compacted to 100 percent of Marshall density. The purpose of this study is to determine the stabilities of specimens compacted to various densities which are below 100 percent of the 50 blow Marshall density.
Resumo:
It has been observed in the Laboratory that an increase in oven heating time of relatively short duration between mixing and compaction of asphaltic concrete hot mixes can have an effect on the Marshall stability results obtained. The purpose of this short investigation is to determine the effect of oven heating time on the density and stability of hot mixes.
Resumo:
The 1982 cost of a two-inch asphaltic concrete overlay, with fabric, was an average of 85% of the cost of a three-inch overlay (see attached calculations). A structural number can be assigned to the extra inch of overlay, whereas it is doubtful that any number can be assigned to the fabric. The observations made on the projects in this report leave little reason to be optimistic on the use of fabrics under asphalt overlays. This is especially true of the Floyd, Dallas and Clarke county projects. A great amount of fabric is being used nationwide for this purpose, probably more from sales promotion than from actual documented performance. Full scale field testing is continuing each time a project is let utilizing fabric reinforcement under asphaltic concrete overlays. It has already become apparent that the use of fabrics in AC overlays is not always cost effective.
Resumo:
This past winter the sieve analysis of combined aggregate was investigated. This study was given No. 26 by the Central Laboratory. The purpose of this work was to try and develop a sieve analysis procedure for combined aggregate which is less time consuming and has the same accuracy as the method described in I.M. 304. In an attempt to use a variety of aggregates for this investigation, a request was made to each District Materials Office to obtain at least 3 different combined aggregate samples in their respective districts. At the same time it was also requested that the field technician test these samples, prior to submitting them to the Central Laboratory. The field technician was instructed to test each sample as described in method I.M. 304 and also by a modified AASHTO T27 method which will be identified in the report as Method A. The modified AASHTO Method A was identical to T27 with the exception that a smaller sample is used for testing. The field technicians submitted the samples, test results and also comments regarding the modified AASHTO procedure. The general comments of the modified AASHTO procedure were: The method was much simpler to follow; however, it took about the same amount of time so there was no real advantage. After reviewing AASHTO T27, T164, I.M. 304 and Report No. FHWA-RD-77-53 another test method was purposed. Report No. FHWA-RD-77-53 is a report prepared by FHWA from data they gathered concerning control practices and shortcut or alternative test methods for aggregate gradation. A second test method was developed which also was very similar to AASHTO T27, The test procedure for this method is attached and is identified as Method B. The following is a summary of test results submitted by the Field Technicians and obtained by the aggregate section of the Central Laboratory.
Resumo:
Intrusion of deicing materials and surface water into concrete bridge decks is a main contributor in deck reinforcing steel corrosion and concrete delamination. Salt, spread on bridge decks to melt ice, dissolves in water and permeates voids in the concrete deck. When the chloride content of the concrete in contact with reinforcing steel reaches a high enough concentration, the steel oxidizes. In Iowa, the method used to reduce bridge deck chloride penetration is the application of a low slump dense concrete overlay after the completion of all Class A and Class B floor repairs. A possible alternative to the use of dense concrete overlays, developed by Poly-Carb, Inc., is the MARK-163 FLEXOGRID Overlay System. FLEXOGRID is a two component system of epoxy and urethane which is applied on a bridge deck to a minimum thickness of ¼ inch. An aggregate mixture of silica quartz and aluminum oxide is broadcast onto the epoxy at a prescribed rate to provide deck protection and superior friction properties. The material is mixed on site and applied to the deck in a series of lifts (usually two) until the desired overlay thickness has been attained.
Effect of Delay in Testing Asphalt Concrete Specimens for Marshall Stability, MLR-86-08, Draft, 1986
Resumo:
The Central Laboratory has been delaying the mix design testing of 2 1/2" X 4" Marshall specimens for stability, until the next day after molding. For example, if the mixes are made and samples molded on Friday a man would have to come in and work on Saturday to test these specimens. The reason for this is that the ASTM-01559 "Resistance to Plastic Flow of Bituminous Mixes Using Marshall Apparatus," states that "the specimens after being molded shall be carefully transferred to a smooth, flat surface and allowed to stand overnight at room temperature, before being weighed, measured and tested." The AASHTO procedure, AASHTO Designation T-245-82 "Resistance to Plastic Flow of Bituminous Mixtures using Marshall Apparatus," does not say when the specimens shall be tested for stability. The IDOT Lab. Specifications, Test Method No. Iowa 502-8 and test method No. Iowa 506-C "compacting asphaltic concrete by the Marshall Method" and "Resistance to Plastic Flow of Bituminous Mixtures Using the Marshall Apparatus," respectively, only state that the specimens shall be cooled before testing. Due to the above conflict in specifications, a number of mix samples were tested, in the Central Lab, for stability on different days. This should furnish enough information to allow us to change the procedure and to test for stability the same day molded, or be able to delay the testing for 3 days or more.