878 resultados para Management by Projects
Resumo:
Genital prolapse is frequent and can be found in about 50% of parous women. Its etiology is complex and multifactorial. Predisposing factors include: genetics (connective tissue disorders, family history); general state (age, parity, weight, smoking, obstructive pulmonary disease); trauma (carrying heavy loads, intense physical exercise); or iatrogenic (post hysterectomy). Treatment can be conservative or surgical and depends mainly on the severity of symptoms. Developments in surgical techniques and synthetic material in the last 20 years enabled us to use minimally invasive procedures with improved post operative course and decreased recurrence rates.
Resumo:
This article is aimed at addressing the current state of the art in epidemiology, pathophysiology, diagnostic procedures and treatment options for appropriate management of obstructive sleep apnea (OSA) in cardiovascular (particularly hypertensive) patients, as well as for the management of cardiovascular diseases (particularly arterial hypertension) in OSA patients. The present document is the result of the work done by a panel of experts participating in the European Union COST (COoperation in Scientific and Technological research) ACTION B26 on OSA, with the endorsement of the European Respiratory Society (ERS) and the European Society of Hypertension (ESH). These recommendations are particularly aimed at reminding cardiovascular experts to consider the occurrence of sleep-related breathing disorders in patients with high blood pressure. They are at the same time aimed at reminding respiration experts to consider the occurrence of hypertension in patients with respiratory problems at night.
Resumo:
Since the publication of the first European Federation of Neurological Societies (EFNS) guidelines in 2005 on the management of restless legs syndrome (RLS; also known as Willis-Ekbom disease), there have been major therapeutic advances in the field. Furthermore, the management of RLS is now a part of routine neurological practice in Europe. New drugs have also become available, and further randomized controlled trials have been undertaken. These guidelines were undertaken by the EFNS in collaboration with the European Neurological Society and the European Sleep Research Society.
Resumo:
This paper is meant to provide guidance to anyone wishing to write a neurological guideline for diagnosis or treatment, and is directed at the Scientist Panels and task forces of the European Federation of Neurological Societies (EFNS). It substitutes the previous guidance paper from 2004. It contains several new aspects: the guidance is now based on a change of the grading system for evidence and for the resulting recommendations, and has adopted The Grading of Recommendations, Assessment, Development and Evaluation system (GRADE). The process of grading the quality of evidence and strength of recommendations can now be improved and made more transparent. The task forces embarking on the development of a guideline must now make clearer and more transparent choices about outcomes considered most relevant when searching the literature and evaluating their findings. Thus, the outcomes chosen will be more critical, more patient-oriented and easier to translate into simple recommendations. This paper also provides updated practical recommendations for planning a guideline task force within the framework of the EFNS. Finally, this paper hopes to find the approval also by the relevant bodies of our future organization, the European Academy of Neurology.
Resumo:
Symptomatic management is often all that is recommended in children with fever. To date, only 2 nationwide surveys of pediatricians regarding their attitudes toward fever have been published.
Diet selection by hares (Lepus europaeus) in arable land and its implications for habitat management
Resumo:
Metals price risk management is a key issue related to financial risk in metal markets because of uncertainty of commodity price fluctuation, exchange rate, interest rate changes and huge price risk either to metals’ producers or consumers. Thus, it has been taken into account by all participants in metal markets including metals’ producers, consumers, merchants, banks, investment funds, speculators, traders and so on. Managing price risk provides stable income for both metals’ producers and consumers, so it increases the chance that a firm will invest in attractive projects. The purpose of this research is to evaluate risk management strategies in the copper market. The main tools and strategies of price risk management are hedging and other derivatives such as futures contracts, swaps and options contracts. Hedging is a transaction designed to reduce or eliminate price risk. Derivatives are financial instruments, whose returns are derived from other financial instruments and they are commonly used for managing financial risks. Although derivatives have been around in some form for centuries, their growth has accelerated rapidly during the last 20 years. Nowadays, they are widely used by financial institutions, corporations, professional investors, and individuals. This project is focused on the over-the-counter (OTC) market and its products such as exotic options, particularly Asian options. The first part of the project is a description of basic derivatives and risk management strategies. In addition, this part discusses basic concepts of spot and futures (forward) markets, benefits and costs of risk management and risks and rewards of positions in the derivative markets. The second part considers valuations of commodity derivatives. In this part, the options pricing model DerivaGem is applied to Asian call and put options on London Metal Exchange (LME) copper because it is important to understand how Asian options are valued and to compare theoretical values of the options with their market observed values. Predicting future trends of copper prices is important and would be essential to manage market price risk successfully. Therefore, the third part is a discussion about econometric commodity models. Based on this literature review, the fourth part of the project reports the construction and testing of an econometric model designed to forecast the monthly average price of copper on the LME. More specifically, this part aims at showing how LME copper prices can be explained by means of a simultaneous equation structural model (two-stage least squares regression) connecting supply and demand variables. A simultaneous econometric model for the copper industry is built: {█(Q_t^D=e^((-5.0485))∙P_((t-1))^((-0.1868) )∙〖GDP〗_t^((1.7151) )∙e^((0.0158)∙〖IP〗_t ) @Q_t^S=e^((-3.0785))∙P_((t-1))^((0.5960))∙T_t^((0.1408))∙P_(OIL(t))^((-0.1559))∙〖USDI〗_t^((1.2432))∙〖LIBOR〗_((t-6))^((-0.0561))@Q_t^D=Q_t^S )┤ P_((t-1))^CU=e^((-2.5165))∙〖GDP〗_t^((2.1910))∙e^((0.0202)∙〖IP〗_t )∙T_t^((-0.1799))∙P_(OIL(t))^((0.1991))∙〖USDI〗_t^((-1.5881))∙〖LIBOR〗_((t-6))^((0.0717) Where, Q_t^D and Q_t^Sare world demand for and supply of copper at time t respectively. P(t-1) is the lagged price of copper, which is the focus of the analysis in this part. GDPt is world gross domestic product at time t, which represents aggregate economic activity. In addition, industrial production should be considered here, so the global industrial production growth that is noted as IPt is included in the model. Tt is the time variable, which is a useful proxy for technological change. A proxy variable for the cost of energy in producing copper is the price of oil at time t, which is noted as POIL(t ) . USDIt is the U.S. dollar index variable at time t, which is an important variable for explaining the copper supply and copper prices. At last, LIBOR(t-6) is the 6-month lagged 1-year London Inter bank offering rate of interest. Although, the model can be applicable for different base metals' industries, the omitted exogenous variables such as the price of substitute or a combined variable related to the price of substitutes have not been considered in this study. Based on this econometric model and using a Monte-Carlo simulation analysis, the probabilities that the monthly average copper prices in 2006 and 2007 will be greater than specific strike price of an option are defined. The final part evaluates risk management strategies including options strategies, metal swaps and simple options in relation to the simulation results. The basic options strategies such as bull spreads, bear spreads and butterfly spreads, which are created by using both call and put options in 2006 and 2007 are evaluated. Consequently, each risk management strategy in 2006 and 2007 is analyzed based on the day of data and the price prediction model. As a result, applications stemming from this project include valuing Asian options, developing a copper price prediction model, forecasting and planning, and decision making for price risk management in the copper market.
Resumo:
In distribution system operations, dispatchers at control center closely monitor system operating limits to ensure system reliability and adequacy. This reliability is partly due to the provision of remote controllable tie and sectionalizing switches. While the stochastic nature of wind generation can impact the level of wind energy penetration in the network, an estimate of the output from wind on hourly basis can be extremely useful. Under any operating conditions, the switching actions require human intervention and can be an extremely stressful task. Currently, handling a set of switching combinations with the uncertainty of distributed wind generation as part of the decision variables has been nonexistent. This thesis proposes a three-fold online management framework: (1) prediction of wind speed, (2) estimation of wind generation capacity, and (3) enumeration of feasible switching combinations. The proposed methodology is evaluated on 29-node test system with 8 remote controllable switches and two wind farms of 18MW and 9MW nameplate capacities respectively for generating the sequence of system reconfiguration states during normal and emergency conditions.
Resumo:
The challenges posed by global climate change are motivating the investigation of strategies that can reduce the life cycle greenhouse gas (GHG) emissions of products and processes. While new construction materials and technologies have received significant attention, there has been limited emphasis on understanding how construction processes can be best managed to reduce GHG emissions. Unexpected disruptive events tend to adversely impact construction costs and delay project completion. They also tend to increase project GHG emissions. The objective of this paper is to investigate ways in which project GHG emissions can be reduced by appropriate management of disruptive events. First, an empirical analysis of construction data from a specific highway construction project is used to illustrate the impact of unexpected schedule delays in increasing project GHG emissions. Next, a simulation based methodology is described to assess the effectiveness of alternative project management strategies in reducing GHG emissions. The contribution of this paper is that it explicitly considers projects emissions, in addition to cost and project duration, in developing project management strategies. Practical application of the method discussed in this paper will help construction firms reduce their project emissions through strategic project management, and without significant investment in new technology. In effect, this paper lays the foundation for best practices in construction management that will optimize project cost and duration, while minimizing GHG emissions.
Resumo:
Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.
Resumo:
BACKGROUND: Only data of published study results are available to the scientific community for further use such as informing future research and synthesis of available evidence. If study results are reported selectively, reporting bias and distortion of summarised estimates of effect or harm of treatments can occur. The publication and citation of results of clinical research conducted in Germany was studied. METHODS: The protocols of clinical research projects submitted to the research ethics committee of the University of Freiburg (Germany) in 2000 were analysed. Published full articles in several databases were searched and investigators contacted. Data on study and publication characteristics were extracted from protocols and corresponding publications. RESULTS: 299 study protocols were included. The most frequent study design was randomised controlled trial (141; 47%), followed by uncontrolled studies (61; 20%), laboratory studies (30; 10%) and non-randomised studies (29; 10%). 182 (61%) were multicentre studies including 97 (53%) international collaborations. 152 of 299 (51%) had commercial (co-)funding and 46 (15%) non-commercial funding. 109 of the 225 completed protocols corresponded to at least one full publication (total 210 articles); the publication rate was 48%. 168 of 210 identified publications (80%) were cited in articles indexed in the ISI Web of Science. The median was 11 citations per publication (range 0-1151). CONCLUSIONS: Results of German clinical research projects conducted are largely underreported. Barriers to successful publication need to be identified and appropriate measures taken. Close monitoring of projects until publication and adequate support provided to investigators may help remedy the prevailing underreporting of research.
Resumo:
This case report presents the treatment sequence of a 56 years old patient after he developed periimplantitis at the implant in position of tooth 22. This implant was integrated in an overdenture reconstruction connected to a soldered screw retained gold bar. The entire 2-stage procedure of implant explantation, simultaneous bone augmentation and new implant placement is documented. The onlay-graft was performed by means of the Transfer-Ring-Control System (Meisinger). The existing gold bar could be resoldered and adapted to the new implant. Accordingly the overdenture was relined and the female retainer mounted. The treatment period covered almost one year.