967 resultados para Handicap Inventory
Resumo:
Mode of access: Internet.
Resumo:
Objective: The Temptation and Restraint Inventory (TRI) is commonly used to measure drinking restraint in relation to problem drinking behavior. However, as yet the TRI has not been validated in a clinical group with alcohol dependence. Method: Male (n = 111) and female (n = 57) inpatients with DSM-IV diagnosed alcohol dependence completed the TRI and measures of problem drinking severity, including the Alcohol Dependence Scale and the quantity, frequency and week total of alcohol consumed. Results: The factor structure of the TRI was replicated in the alcohol dependent sample. Cognitive Emotional Preoccupation (CEP), one of the two higher order factors of the TRI, demonstrated sound predictive power toward all dependence severity indices. The other higher order factor, Cognitive Behavioral Control (CBC), was related to frequency of drinking. There was limited support for the CEP/CBC interactional model of drinking restraint. Conclusions: Although the construct validity of the TRI was sound, the measure appears more useful in understanding the development, maintenance and severity of alcohol-related problems in nondependent drinkers. The TRI may show promise in detecting either continuous drinking or heavy episodic type dependent drinkers.
Resumo:
The main objective of this study was to describe the outcomes of a communication education program for older people with hearing impairment using the International Outcome Inventory - Alternative Interventions (IOI-AI) and the version for significant others (IOI-AI-SO). Ninety-six people aged 58 to 94 years participated in an interactive group education program for two hours per week for five weeks. The IOI-AI was administered at one to two weeks after the last educational session and 29 significant others also completed the IOI-Al-SO at this time. Overall, positive results were obtained using both questionnaires, and satisfaction with the program was particularly high. Findings also compared favourably to reports of outcomes for other audiological interventions (i.e., another communication training program and hearing aid fitting). Principal components analysis of the IOI-AI revealed a somewhat different factor structure than the original IOI-HA. The two versions of the 101 applied in this study are recommended as simple and effective measures of the outcomes of alternative interventions.
Resumo:
Background: In 1992, Frisch et al (Psychol Assess. 1992;4:92- 10 1) developed the Quality of Life Inventory (QOLI) to measure the concept of quality of life (QOL) because it has long been thought to be related to both physical and emotional well-being. However, the psychometric properties of the QOLI in clinical populations are still in debate. The present study examined the factor structure of QOLI and reported its validity and reliability in a clinical sample. Method: Two hundred seventeen patients with anxiety and depressive disorders completed the QOLI and additional questionnaires measuring symptoms (Zung Self-rating Depression Scale, Beck Anxiety Inventory, Fear Questionnaire, Depression Anxiety Stress Scale-Stress) and subjective well-being (Satisfaction With Life Scale) were also used. Results: Exploratory factor analysis via the principal components method, with oblique rotation, revealed a 2-factor structure that accounted for 42.73% of the total variance, and a subsequent confirmatory factor analysis suggested a moderate fit of the data to this model. The 2 factors appeared to describe self-oriented QOL and externally oriented QOL. The Cronbach alpha coefficients were 0.85 for the overall QOLI score, 0.81 for the first factor, and 0.75 for the second factor. Conclusion: Consistent evidence was also found to support the concurrent, discriminant, predictive, and criterion-related validity of the QOLI. (c) 2006 Elsevier Inc. All rights reserved.
Inventory parameter management and focused continuous improvement for repetitive batch manufacturers
Resumo:
What this thesis proposes is a methodology to assist repetitive batch manufacturers in the adoption of certain aspects of the Lean Production principles. The methodology concentrates on the reduction of inventory through the setting of appropriate batch sizes, taking account of the effect of sequence dependent set-ups and the identification and elimination of bottlenecks. It uses a simple Pareto and modified EBQ based analysis technique to allocate items to period order day classes based on a combination of each item's annual usage value and set-up cost. The period order day classes the items are allocated to are determined by the constraints limits in the three measured dimensions, capacity, administration and finance. The methodology overcomes the limitations associated with MRP in the area of sequence dependent set-ups, and provides a simple way of setting planning parameters taking this effect into account by concentrating on the reduction of inventory through the systematic identification and elimination of bottlenecks through set-up reduction processes, so allowing batch sizes to reduce. It aims to help traditional repetitive batch manufacturers in a route to continual improvement by: Highlighting those areas where change would bring the greatest benefits. Modelling the effect of proposed changes. Quantifying the benefits that could be gained through implementing the proposed changes. Simplifying the effort required to perform the modelling process. It concentrates on increasing flexibility through managed inventory reduction through rationally decreasing batch sizes, taking account of sequence dependent set-ups and the identification and elimination of bottlenecks. This was achieved through the development of a software modelling tool, and validated through a case study approach.
Resumo:
Understanding the feasibility of applying the Team Climate Inventory (TCI) in non-Western cultures is essential for researchers attempting to understand the influence of culture on workers' perceived climate. This study describes the application of the TCI in such a setting using data from 203 administrators employed in a Taiwanese medical center. Reliability and factor analyses were performed to establish the feasibility and psychometric properties of the TCI Taiwan version. Reliabilities of both the four- and five-factor solutions exceeded .80. Factor analyses indicated a satisfactory four-factor structure, despite some variations in comparison with the U.K. version. The TCI Taiwan version is feasible and has acceptable psychometric properties. Further research is warranted regarding the degree to which disparities result from cultural differences and the specific nature of organizational systems in Chinese communities.
Resumo:
Innovation has long been an area of interest to social scientists, and particularly to psychologists working in organisational settings. The team climate inventory (TCI) is a facet-specific measure of team climate for innovation that provides a picture of the level and quality of teamwork in a unit using a series of Likert scales. This paper describes its Italian validation in 585 working group members employed in health-related and other contexts. The data were evaluated by means of factorial analysis (including an analysis of the internal consistency of the scales) and Pearson’s product moment correlations. The results show the internal consistency of the scales and the satisfactory factorial structure of the inventory, despite some variations in the factorial structure mainly due to cultural differences and the specific nature of Italian organisational systems.
Resumo:
Multi-national manufacturing companies are often faced with very difficult decisions regarding where and how to cost effectively manufacture products in a global setting. Clearly, they must utilize efficient and responsive manufacturing strategies to reach low cost solutions, but they must also consider the impact of manufacturing and transportation solutions upon their ability to support sales. One important sales consideration is determining how much work in process, in-transit stock, and finished goods to have on hand to support sales at a desired service level. This paper addresses this important consideration through a comprehensive scenario-based simulation approach, including sensitivity analysis on key study parameters. Results indicate that the inventory needs vary considerably for different manufacturing and delivery methods in ways that may not be obvious when using common evaluative tools.
Resumo:
In recent years, UK industry has seen an explosive growth in the number of `Computer Aided Production Management' (CAPM) system installations. Of the many CAPM systems, materials requirement planning/manufacturing resource planning (MRP/MRPII) is the most widely implemented. Despite the huge investments in MRP systems, over 80 percent are said to have failed within 3 to 5 years of installation. Many people now assume that Just-In-Time (JIT) is the best manufacturing technique. However, those who have implemented JIT have found that it also has many problems. The author argues that the success of a manufacturing company will not be due to a system which complies with a single technique; but due to the integration of many techniques and the ability to make them complement each other in a specific manufacturing environment. This dissertation examines the potential for integrating MRP with JIT and Two-Bin systems to reduce operational costs involved in managing bought-out inventory. Within this framework it shows that controlling MRP is essential to facilitate the integrating process. The behaviour of MRP systems is dependent on the complex interactions between the numerous control parameters used. Methodologies/models are developed to set these parameters. The models are based on the Pareto principle. The idea is to use business targets to set a coherent set of parameters, which not only enables those business targets to be realised, but also facilitates JIT implementation. It illustrates this approach in the context of an actual manufacturing plant - IBM Havant. (IBM Havant is a high volume electronics assembly plant with the majority of the materials bought-out). The parameter setting models are applicable to control bought-out items in a wide range of industries and are not dependent on specific MRP software. The models have produced successful results in several companies and are now being developed as commercial products.