929 resultados para maximum power point tracking(MPPT)


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this study was to verify the correlation between the Wingate arm crank test outputs (peak power, mean power, and fatigue index), obtained on a specific ergometer, and the performance in crawl stroke swim sprints of 14, 25, 50, and 400 m. The experiment was conducted with 9 healthy male volunteers (18.1 ± 2.2 years of age; 172 ± 0.04 cm; 67.7 ± 5.92 kg and 15.7 ± 4.57% body fat). On determined days, all individuals were submitted to the Wingate arm crank test and crawl freestyle sprints of 14, 25, 50, and 400 m as they were timed with a stopwatch. The peak power, the mean power, and the fatigue index, which were obtained during the Wingate arm crank test, were not significantly correlated with the maximum swim velocities during the crawl freestyle tests of 14 (r = 0.40; r = 0.64; r = 0.11), 25 (r = 0.28; r = 0.39; r = -0.17), 50 (r = 0.03; r = 0.09; r = -0.31), and 400 (r = -0.52; r = -0.37; r = -0.65) m, respectively. Thus, it is possible to conclude that the Wingate arm crank test is not suitable to assess the anaerobic power of swimmers under the described experimental conditions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A new approach to solving the Optimal Power Flow problem is described, making use of some recent findings, especially in the area of primal-dual methods for complex programming. In this approach, equality constraints are handled by Newton's method inequality constraints for voltage and transformer taps by the logarithmic barrier method and the other inequality constraints by the augmented Lagrangian method. Numerical test results are presented, showing the effective performance of this algorithm. © 2001 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents some initial concepts for including reactive power in linear methods for computing Available Transfer Capability (ATC). It is proposed an approximation for the reactive power flows computation that uses the exact circle equations for the transmission line complex flow, and then it is determined the ATC using active power distribution factors. The transfer capability can be increased using the sensitivities of flow that show the best group of buses which can have their reactive power injection modified in order to remove the overload in the transmission lines. The results of the ATC computation and of the use of the sensitivities of flow are presented using the Cigré 32-bus system. © 2004 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The perceived exertion has been a target of several investigations, many times with association with objective physiological indicators in exercise. Recently, the identification of the perceived exertion threshold (PET) was proposed in the water running, which presented no difference in relation to the critical velocity. Theoretically, both parameters would be indicators of the maximum steady state of variables such as V̇O2 and blood lactate. The objective of this work was to verify the coincidence between PET, critical power (PCrit) and an indicator of maximum V̇O2 steady state (PCrit') in cycle ergometer. Eight male participants were submitted to progressive effort test in order to determine V̇O2peak (46.7 ± 8.5 ml/kg/min) and to four rectangular tests until exhaustion for the estimation of the critical power model parameters, PET and PCrit'. The hyperbolic relation between mechanical power and time spent for the V̇O2peak to be reached in each test was used for the PCrit' estimation, considered as the asymptote in the power axis, and the portion of the anaerobic work capacity (CTAnaer) depleted up to the establishment of the V̇O2peak (CTAnaer'). In order to identify PET, the straight lines angular coefficients of the perceived exertion in time (ordinate) and the powers used (abscissa) were adjusted to a linear function that provided a point in the power axis in which the perceived exertion would be kept indefinitely stable. The parameters PCrit and CTAnaer were estimated by means of the power-time non-linear equation. In order to compare the estimations of PET, PCrit and PCrit', the analysis of variance ANOVA for repeated measurements was employed, and the associations were established through the Pearson correlation. CTAnaer and CTAnaer' were compared through the t test. PET (180 W ± 61 W), PCrit (174 W ± 43 W) and PCrit' (176 W ± 48 W) were not significantly different and the correlations were of 0.92-0.98. CTAnaer' (14,080 ± 5,219 J) was lower than CTAnaer (22,093 ± 9,042 J). One concludes that the PET predicts the intensity of PCrit and PCrit' with accuracy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper a comparative analysis of the environmental impact caused by the use of natural gas and diesel in thermoelectric power plants utilizing combined cycle is performed. The objective is to apply a thermoeconomical analysis in order to compare the two proposed fuels. In this analysis, a new methodology that incorporates the economical engineering concept to the ecological efficiency once Cardu and Baica [1, 2], which evaluates, in general terms, the environmental impacts caused by CO2, SO2, NOx and Particulate Matter (PM), adopting as reference the air quality standards in vigour is employed. The thermoeconomic model herein proposed utilizes functional diagrams that allow the minimization the Exergetic Manufacturing Cost, which represents the cost of production of electricity incorporating the environmental impact effects to study the performance of the thermoelectric power plant [3,4], It follows that it is possible to determine the environmental impact caused by thermoelectric power plants and, under the ecological standpoint, the use of natural gas as a fuel is the best option compared to the use of the diesel, presenting ecological efficiency values of 0.944 and 0.914 respectively. From the Exergoeconomic point of view of, it was found out that the EMC (Exergetic Manufacturing Cost) is better when natural gas is used as fuel compared to the diesel fuel. Copyright © 2006 by ASME.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, a mathematical model is derived via Lagrange's Equation for a shear building structure that acts as a foundation of a non-ideal direct current electric motor, controlled by a mass loose inside a circular carving. Non-ideal sources of vibrations of structures are those whose characteristics are coupled to the motion of the structure, not being a function of time only as in the ideal case. Thus, in this case, an additional equation of motion is written, related to the motor rotation, coupled to the equation describing the horizontal motion of the shear building. This kind of problem can lead to the so-called Sommerfeld effect: steady state frequencies of the motor will usually increase as more power (voltage) is given to it in a step-by-step fashion. When a resonance condition with the structure is reached, the better part of this energy is consumed to generate large amplitude vibrations of the foundation without sensible change of the motor frequency as before. If additional increase steps in voltage are made, one may reach a situation where the rotor will jump to higher rotation regimes, no steady states being stable in between. As a device of passive control of both large amplitude vibrations and the Sommerfeld effect, a scheme is proposed using a point mass free to bounce back and forth inside a circular carving in the suspended mass of the structure. Numerical simulations of the model are also presented Copyright © 2007 by ASME.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the comparison of three topologies of multilevel inverters applied to drive an induction motor of 500 kVA/4.16 kV. The multilevel inverters analyzed are: a neutral point clamped inverter, a symmetrical cascaded multilevel inverter and a hybrid asymmetrical cascaded multilevel inverter. The performance indexes used in the comparison are total harmonic distortion, first order distortion factor, semiconductors power losses distribution and heat-sink volume. The comparison is developed with the purpose of finding the efficiency and the heat-sink volume where the three systems present the same output filter. ©2008 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes a method for the decentralized solution of the optimal reactive power flow (ORPF) problem in interconnected power systems. The ORPF model is solved in a decentralized framework, consisting of regions, where the transmission system operator in each area operates its system independently of the other areas, obtaining an optimal coordinated but decentralized solution. The proposed scheme is based on an augmented Lagrangian approach using the auxiliary problem principle (APP). An implementation of an interior point method is described to solve the decoupled problem in each area. The described method is successfully implemented and tested using the IEEE two area RTS 96 test system. Numerical results comparing the solutions obtained by the traditional and the proposed decentralized methods are presented for validation. ©2008 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes the application of computational intelligence techniques to assist complex problems concerning lightning in transformers. In order to estimate the currents related to lightning in a transformer, a neural tool is presented. ATP has generated the training vectors. The input variables used in Artificial Neural Networks (ANN) were the wave front time, the wave tail time, the voltage variation rate and the output variable is the maximum current in the secondary of the transformer. These parameters can define the behavior and severity of lightning. Based on these concepts and from the results obtained, it can be verified that the overvoltages at the secondary of transformer are also affected by the discharge waveform in a similar way to the primary side. By using the tool developed, the high voltage process in the distribution transformers can be mapped and estimated with more precision aiding the transformer project process, minimizing empirics and evaluation errors, and contributing to minimize the failure rate of transformers. © 2009 The Berkeley Electronic Press. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We discuss dynamics of a vibro-impact system consisting of a cart with an piecewise-linear restoring force, which vibrates under driving by a source with limited power supply. From the point of view of dynamical systems, vibro-impact systems exhibit a rich variety of phenomena, particularly chaotic motion. In our analyzes, we use bifurcation diagrams, basins of attractions, identifying several non-linear phenomena, such as chaotic regimes, crises, intermittent mechanisms, and coexistence of attractors with complex basins of attraction. © 2009 by ASME.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We consider an infinite horizon optimal impulsive control problems for which a given cost function is minimized by choosing control strategies driving the state to a point in a given closed set C ∞. We present necessary conditions of optimality in the form of a maximum principle for which the boundary condition of the adjoint variable is such that non-degeneracy due to the fact that the time horizon is infinite is ensured. These conditions are given for conventional systems in a first instance and then for impulsive control problems. They are proved by considering a family of approximating auxiliary interval conventional (without impulses) optimal control problems defined on an increasing sequence of finite time intervals. As far as we know, results of this kind have not been derived previously. © 2010 IFAC.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper adjusts decentralized OPF optimization to the AC power flow problem in power systems with interconnected areas operated by diferent transmission system operators (TSO). The proposed methodology allows finding the operation point of a particular area without explicit knowledge of network data of the other interconnected areas, being only necessary to exchange border information related to the tie-lines between areas. The methodology is based on the decomposition of the first-order optimality conditions of the AC power flow, which is formulated as a nonlinear programming problem. To allow better visualization of the concept of independent operation of each TSO, an artificial neural network have been used for computing border information of the interconnected TSOs. A multi-area Power Flow tool can be seen as a basic building block able to address a large number of problems under a multi-TSO competitive market philosophy. The IEEE RTS-96 power system is used in order to show the operation and effectiveness of the decentralized AC Power Flow. ©2010 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper a framework based on the decomposition of the first-order optimality conditions is described and applied to solve the Probabilistic Power Flow (PPF) problem in a coordinated but decentralized way in the context of multi-area power systems. The purpose of the decomposition framework is to solve the problem through a process of solving smaller subproblems, associated with each area of the power system, iteratively. This strategy allows the probabilistic analysis of the variables of interest, in a particular area, without explicit knowledge of network data of the other interconnected areas, being only necessary to exchange border information related to the tie-lines between areas. An efficient method for probabilistic analysis, considering uncertainty in n system loads, is applied. The proposal is to use a particular case of the point estimate method, known as Two-Point Estimate Method (TPM), rather than the traditional approach based on Monte Carlo simulation. The main feature of the TPM is that it only requires resolve 2n power flows for to obtain the behavior of any random variable. An iterative coordination algorithm between areas is also presented. This algorithm solves the Multi-Area PPF problem in a decentralized way, ensures the independent operation of each area and integrates the decomposition framework and the TPM appropriately. The IEEE RTS-96 system is used in order to show the operation and effectiveness of the proposed approach and the Monte Carlo simulations are used to validation of the results. © 2011 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an approach for probabilistic analysis of unbalanced three-phase weakly meshed distribution systems considering uncertainty in load demand. In order to achieve high computational efficiency this approach uses both an efficient method for probabilistic analysis and a radial power flow. The probabilistic approach used is the well-known Two-Point Estimate Method. Meanwhile, the compensation-based radial power flow is used in order to extract benefits from the topological characteristics of the distribution systems. The generation model proposed allows modeling either PQ or PV bus on the connection point between the network and the distributed generator. In addition allows control of the generator operating conditions, such as the field current and the power delivery at terminals. Results on test with IEEE 37 bus system is given to illustrate the operation and effectiveness of the proposed approach. A Monte Carlo Simulations method is used to validate the results. © 2011 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article aims to present proposals for improvement of key standards and resolutions concerned about the methodology for calculating the indicator of total harmonic voltage distortion, and should contribute to the process of examining the compatibility of potentially disturbing loads in electric power quality in distribution systems. These proposals were drawn from the analysis of results from measurement campaigns conducted in a case study including analysis of the connection of a new induction furnace in a foundry served by a distributor of São Paulo state. A general historical situating the quality of electric energy in the electricity sector is presented, and methodological guidelines and procedures used in experimental trials are shown. The analysis and discussion of results are prepared to answer the main questions that arise during the implementation of standards, resolutions and procedures. © 2011 IEEE.