959 resultados para management of project acquisition
Resumo:
The purpose of this supplemental project was to collect invaluable data from the large-scale construction sites of Egnatia Odos motorway needed to validate a novel automated vision-tracking method created under the parent grant. For this purpose, one US graduate and three US undergraduate students traveled to Greece for 4 months and worked together with 2 Greek graduate students of the local faculty collaborator. This team of students monitored project activities and scheduled data collection trips on a daily basis, setup a mobile video data collection lab on the back of a truck, and drove to various sites every day to collect hundreds of hours of video from multiple cameras on a large variety of activities ranging from soil excavation to bridge construction. The US students were underrepresented students from minority groups who had never visited a foreign country. As a result, this trip was a major life experience to them. They learned how to live in a non-English speaking country, communicate with Greek students, workers and engineers. They lead a project in a very unfamiliar environment, troubleshoot myriad problems that hampered their progress daily and, above all, how to collaborate effectively and efficiently with other cultures. They returned to the US more mature, with improved leadership and problem-solving skills and a wider perspective of their profession.
Resumo:
Among several others, the on-site inspection process is mainly concerned with finding the right design and specifications information needed to inspect each newly constructed segment or element. While inspecting steel erection, for example, inspectors need to locate the right drawings for each member and the corresponding specifications sections that describe the allowable deviations in placement among others. These information seeking tasks are highly monotonous, time consuming and often erroneous, due to the high similarity of drawings and constructed elements and the abundance of information involved which can confuse the inspector. To address this problem, this paper presents the first steps of research that is investigating the requirements of an automated computer vision-based approach to automatically identify “as-built” information and use it to retrieve “as-designed” project information for field construction, inspection, and maintenance tasks. Under this approach, a visual pattern recognition model was developed that aims to allow automatic identification of construction entities and materials visible in the camera’s field of view at a given time and location, and automatic retrieval of relevant design and specifications information.
Resumo:
This paper reports on research that uses building performance simulation and uncertainty analysis to assess the risks that projected climate change poses to the thermal performance of buildings, and to their critical functions. The work takes meteorological climate change predictions as a starting point, but also takes into account developments and uncertainties in technology, occupancy, intervention and renovation, and others. Four cases are studied in depth to explore the prospects of the quantification of said climate change risks. The research concludes that quantification of the risks posed by climate change is possible, but only with many restrictive assumptions on the input side.
Resumo:
SPIE