922 resultados para extreme hydro meteorological phenomena


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work includes two major parts. The first part of the work concentrated on the studies of the application of the highperfonnance liquid chromatography-particle beam interface-mass spectrometry system of some pesticides. Factors that have effects on the detection sensitivity were studied. The linearity ranges and detection limits of ten pesticides are also given in this work. The second part of the work concentrated on the studies of the reduction phenomena of nitro compounds in the HPLC-PB-MS system. Direct probe mass spectrometry and gas chromatography-mass spectrometry techniques were also used in the work. Factors that have effects on the reduction of the nitro compounds were studied, and the possible explanation is proposed. The final part of this work included the studies of reduction behavior of some other compounds in the HPLC-PB-MS system, included in them are: quinones, sulfoxides, and sulfones.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sir Adam Beck ( a London, Ontario manufacturer, Mayor and Conservative member of the provincial legislature) was a champion of municipal and provincial power ownership. Beck become the “Power Minister” and chairman of the Hydro-Electric Power Commission of Ontario which was the world’s first publicly owned utility. In 1925 the first unit of the Hydro Electric Power Commission’s Queenston Chippawa hydro-electric development on the Niagara River went into service. The station was renamed in 1950 as “Sir Adam Beck #1”. This marked the 25th anniversary of Beck’s death. This is one of 2 generating stations in Niagara Falls. There is also Adam Beck Plant #2. The Niagara generating stations supply one quarter of all power used in New York State and Ontario.Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls. Source: http://www.hydroone.com/OurCompany/Pages/OurHistory.aspx

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A brochure for Ontario Hydro marking the 50 year Jubilee. The brochure also describes the change over from 25 cycle to 60 cycle service. A map details the areas that have made the change to 60 cycle power and those still waiting to transition. There is also a section of eight questions and answers concerning the change to 60 cycle power.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Public Ownership League of America Conference, September 10th to 13th, 1923, at Toronto, Ontario.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Four men (unidentified) walking in tunnel wearing hard hats and carrying flashlights.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Appears to be an engineer's drawing of the Hydro Station. It is a cross-section view of the interior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of my research was to examine how community-based organizations in the Niagara region provide programs for children with Autism Spectrum Disorder (ASD), who are considered to represent “extreme” or “severe” cases. A qualitative, comparative case study was conducted that focused on three organizations who provide summer recreation and activity programs, in order to examine the issues these organizations face when determining program structure and staff training; and to understand what the threshold for physical activity is in this type of setting, and how the unique needs surrounding these “severe” cases are met while attending the program. Purposeful sampling was employed to select a supervisor and senior staff member from each organization to discuss the training process, program development and implementation, and the resources and strategies used within their organization’s community-based program. A confirming comparative analysis was comparative analysis of a parents survey with six mothers whose children are considered “severe” indicated that camp staffs’ expectations are unrealistic where as the parents and supervisors have more realistic expectations within the “real world” of camp. There is no definition of “severe” or “extreme” and therefore severity is dependent upon the context.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ontario Hydro map of the St. Lawrence Power Project General Plan, n.d.