946 resultados para action level


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was an innovative approach in developing smart coordination of available energy resources to improve the integration level of PV in distribution network. Voltage and loading issues are considered as the main concerns for future electricity grid which need to be avoided using such resources. A distributed control structure was proposed for the resources in distribution network to avoid noted power quality issues.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes a diode-clamped three-level inverter-based battery/supercapacitor direct integration scheme for renewable energy systems. The study is carried out for three different cases. In the first case, one of the two dc-link capacitors of the inverter is replaced by a battery bank and the other by a supercapacitor bank. In the second case, dc-link capacitors are replaced by two battery banks. In the third case, ordinary dc-link capacitors are replaced by two supercapacitor banks. The first system is supposed to mitigate both long-term and short-term power fluctuations while the last two systems are intended for smoothening long-term and short-term power fluctuations, respectively. These topologies eliminate the need for interfacing dc-dc converters and thus considerably improve the overall system efficiency. The major issue in aforementioned systems is the unavoidable imbalance in dc-link voltages. An analysis on the effects of unbalance and a space vector modulation method, which can produce undistorted current even in the presence of such unbalances, are presented in this paper. Furthermore, small vector selection-based power sharing and state of charge balancing techniques are proposed. Experimental results, obtained from a laboratory prototype, are presented to verify the efficacy of the proposed modulation and control techniques.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study proposes a five-level Z-source diode-clamped inverter designed with two intermediate Z-source networks connected between the dc input sources and rear-end inverter circuitry. By partially shorting the Z-source networks, new operating states not previously reported for two-level Z-source inverter are introduced here for operating the proposed inverter with voltage buck-boost energy conversion ability and five-level phase voltage switching. These characteristic features are in fact always ensured at the inverter terminal output by simply adopting a properly designed carrier modulation scheme, which always inserts two partial shoot-through states per half carrier cycle for smooth balanced operation. Theoretical findings and practical issues identified are eventually verified by constructing a scaled down laboratory prototype for testing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents new five-level current-source inverters (CSIs) with voltage/current buck-boost capability, unlike existing five-level CSIs where only voltage-boost operation is supported. The proposed inverters attain self-inductive-current-balancing per switching cycle at their dc front ends without having to include additional balancing hardware or complex control manipulation. The inverters can conveniently be controlled by using the well-established phase-shifted carrier modulation scheme with only two additional linear references and a mapping logic table needed. Existing modulators can therefore be conveniently retrofitted for controlling the presented inverters. By appropriately coordinating the inverter gating signals, their implementations can be realized by using the least number of components without degrading performance. These enhanced features of the inverters have already been verified in simulation and experimentally using a scaled-down laboratory platform.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

MMP-2 (gelatinase A) has been associated with the invasive potential of many cancer cells both in vitro and in vivo. It is now becoming clear that the activation of this enzyme might be a key step in tumor invasion. This activation process has been shown to be a membrane-associated pathway inducible by various agents such as collagen type I, concanavalin A or TGF-β, but its physiological regulation is still largely unresolved. MT-MMP was recently discovered and described as a potential gelatinase-A activator. In the present study, we investigated the expression of MT-MMP (membrane-type metalloproteinase) in cervical cancer cells both in vitro and in vivo. Comparing several in vitro-transformed cervical cell lines, previously shown to display different invasive potentials, our results showed that the ability of cells to overexpress MT-MMP mRNA following ConA induction correlated with their ability to activate gelatinase A and with a highly invasive behavior. Moreover, using immunohistochemistry and in situ hybridization, we found a higher level of MT-MMP expression in invasive cervical carcinoma and lymphnode metastases compared to its expression in non-invasive CIN III lesions. Our in vivo observations also clearly demonstrated a cooperation between stromal and tumor cells for the production of MT-MMP. Taken together, our results clearly correlated high level MT-MMP expression with invasiveness, and thus suggested that MT-MMP might play a crucial role in cervical tumor invasion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the current climate of global economic volatility, there are increasing calls for training in enterprising skills and entrepreneurship to underpin the systemic innovation required for even medium-term business sustainability. The skills long-recognised as the essential for entrepreneurship now appear on the list of employability skills demanded by industry. The QUT Innovation Space (QIS) was an experiment aimed at delivering entrepreneurship education (EE), as an extra-curricular platform across the university, to the undergraduate students of an Australian higher education institute. It was an ambitious project that built on overseas models of EE studied during an Australian Learning and Teaching Council (ALTC) Teaching Fellowship (Collet, 2011) and implemented those approaches across an institute. Such EE approaches have not been attempted in an Australian university. The project tested resonance not only with the student population, from the perspective of what worked and what didn’t work, but also with every level of university operations. Such information is needed to inform the development of EE in the Australian university landscape. The QIS comprised a physical co-working space, virtual sites (web, Twitter and Facebook) and a network of entrepreneurial mentors, colleagues, and students. All facets of the QIS enabled connection between like-minded individuals that underpins the momentum needed for a project of this nature. The QIS became an innovation community within QUT. This report serves two purposes. First, as an account of the QIS project and its evolution, the report serves to identify the student demand for skills and training as well as barriers and facilitators of the activities that promote EE in an Australian university context. Second, the report serves as a how-to manual, in the tradition of many tomes on EE, outlining the QIS activities that worked as well as those that failed. The activities represent one measure of QIS outcomes and are described herein to facilitate implementation in other institutes. The QIS initially aimed to adopt an incubation model for training in EE. The ‘learning by doing’ model for new venture creation is a highly successful and high profile training approach commonly found in overseas contexts. However, the greatest demand of the QUT student population was not for incubation and progression of a developed entrepreneurial intent, but rather for training that instilled enterprising skills in the individual. These two scenarios require different training approaches (Fayolle and Gailly, 2008). The activities of the QIS evolved to meet that student demand. In addressing enterprising skills, the QIS developed the antecedents of entrepreneurialism (i.e., entrepreneurial attitudes, motivation and behaviours) including high-level skills around risk-taking, effective communication, opportunity recognition and action-orientation. In focusing on the would-be entrepreneur and not on the (initial) idea per se, the QIS also fostered entrepreneurial outcomes that would never have gained entry to the rigid stage-gated incubation model proposed for the original QIS framework. Important lessons learned from the project for development of an innovation community include the need to: 1. Evaluate the context of the type of EE program to be delivered and the student demand for the skills training (as noted above). 2. Create a community that builds on three dimensions: a physical space, a virtual environment and a network of mentors and partners. 3. Supplement the community with external partnerships that aid in delivery of skills training materials. 4. Ensure discovery of the community through the use of external IT services to deliver advertising and networking outlets. 5. Manage unrealistic student expectations of billion dollar products. 6. Continuously renew and rebuild simple activities to maintain student engagement. 7. Accommodate the non-university end-user group within the community. 8. Recognise and address the skills bottlenecks that serve as barriers to concept progression; in this case, externally provided IT and programming skills. 9. Use available on-line and published resources rather than engage in constructing project-specific resources that quickly become obsolete. 10. Avoid perceptions of faculty ownership and operate in an increasingly competitive environment. 11. Recognise that the continuum between creativity/innovation and entrepreneurship is complex, non-linear and requires different training regimes during the different phases of the pipeline. One small entity, such as the QIS, cannot address them all. The QIS successfully designed, implemented and delivered activities that included events, workshops, seminars and services to QUT students in the extra-curricular space. That the QIS project can be considered successful derives directly from the outcomes. First, the QIS project changed the lives of emerging QUT student entrepreneurs. Also, the QIS activities developed enterprising skills in students who did not necessarily have a business proposition, at the time. Second, successful outcomes of the QIS project are evidenced as the embedding of most, perhaps all, of the QIS activities in a new Chancellery-sponsored initiative: the Leadership Development and Innovation Program hosted by QUT Student Support Services. During the course of the QIS project, the Brisbane-based innovation ecosystem underwent substantial change. From a dearth of opportunities for the entrepreneurially inclined, there is now a plethora of entities that cater for a diversity of innovation-related activities. While the QIS evolved with the landscape, the demand endpoint of the QIS activities still highlights a gap in the local and national innovation ecosystems. The freedom to experiment and to fail is not catered for by the many new entities seeking to build viable businesses on the back of the innovation push. The onus of teaching the enterprising skills, which are the employability skills now demanded by industry, remains the domain of the higher education sector.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Level crossing risk continues to be a significant safety concern for the security of rail operations around the world. Over the last decade or so, a third of railway related fatalities occurred as a direct result of collisions between road and rail vehicles in Australia. Importantly, nearly half of these collisions occurred at railway level crossings with no active protection, such as flashing lights or boom barriers. Current practice is to upgrade level crossings that have no active protection. However, the total number of level crossings found across Australia exceed 23,500, and targeting the proportion of these that are considered high risk (e.g. public crossings with passive controls) would cost in excess of AU$3.25 billion based on equipment, installation and commissioning costs of warning devices that are currently type approved. Level crossing warning devices that are low-cost provide a potentially effective control for reducing risk; however, over the last decade, there have been significant barriers and legal issues in both Australia and the US that have foreshadowed their adoption. These devices are designed to have significantly lower lifecycle costs compared with traditional warning devices. They often make use of use of alternative technologies for train detection, wireless connectivity and solar energy supply. This paper describes the barriers that have been encountered for the adoption of these devices in Australia, including the challenges associated with: (1) determining requisite safety levels for such devices; (2) legal issues relating to duty of care obligations of railway operators; and (3) issues of Tort liability around the use of less than fail-safe equipment. This paper provides an overview of a comprehensive safety justification that was developed as part of a project funded by a collaborative rail research initiative established by the Australian government, and describes the conceptual framework and processes being used to justify its adoption. The paper provides a summary of key points from peer review and discusses prospective barriers that may need to be overcome for future adoption. A successful outcome from this process would result in the development of a guideline for decision-making, providing a precedence for adopting low-cost level crossing warning devices in other parts of the world. The framework described in this paper also provides relevance to the review and adoption of analogous technologies in rail and other safety critical industries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Intelligent Transport System (ITS) technology is seen as a cost-effective way to increase the conspicuity of approaching trains and the effectiveness of train warnings at level crossings by providing an in-vehicle warning of an approaching train. The technology is often seen as a potential low-cost alternative to upgrading passive level crossings with traditional active warning systems (flashing lights and boom barriers). ITS platforms provide sensor, localization and dedicated short-range communication (DSRC) technologies to support cooperative applications such as collision avoidance for road vehicles. In recent years, in-vehicle warning systems based on ITS technology have been trialed at numerous locations around Australia, at level crossing sites with active and passive controls. While significant research has been conducted on the benefits of the technology in nominal operating modes, little research has focused on the effects of the failure modes, the human factors implications of unreliable warnings and the technology adoption process from the railway industry’s perspective. Many ITS technology suppliers originate from the road industry and often have limited awareness of the safety assurance requirements, operational requirements and legal obligations of railway operators. This paper aims to raise awareness of these issues and start a discussion on how such technology could be adopted. This paper will describe several ITS implementation cenarios and discuss failure modes, human factors considerations and the impact these scenarios are likely to have in terms of safety, railway safety assurance requirements and the practicability of meeting these requirements. The paper will identify the key obstacles impeding the adoption of ITS systems for the different implementation scenarios and a possible path forward towards the adoption of ITS technology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Homologous recombination catalyzed by the RAD51 recombinase is essential for maintaining genome integrity upon the induction of DNA double strand breaks and other DNA lesions. By enhancing the recombinase activity of RAD51, RAD51AP1 (RAD51-associated protein 1) serves a key role in homologous recombination-mediated chromosome damage repair. We show here that RAD51AP1 harbors two distinct DNA binding domains that are both needed for maximal protein activity under physiological conditions. We have finely mapped the two DNA binding domains in RAD51AP1 and generated mutant variants that are impaired in either or both of the DNA binding domains. Examination of these mutants reveals that both domains are indispensable for RAD51AP1 function in cells. These and other results illuminate the mechanistic basis of RAD51AP1 action in homologous DNA repair.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The occurrence of extreme water level events along low-lying, highly populated and/or developed coastlines can lead to devastating impacts on coastal infrastructure. Therefore it is very important that the probabilities of extreme water levels are accurately evaluated to inform flood and coastal management and for future planning. The aim of this study was to provide estimates of present day extreme total water level exceedance probabilities around the whole coastline of Australia, arising from combinations of mean sea level, astronomical tide and storm surges generated by both extra-tropical and tropical storms, but exclusive of surface gravity waves. The study has been undertaken in two main stages. In the first stage, a high-resolution (~10 km along the coast) hydrodynamic depth averaged model has been configured for the whole coastline of Australia using the Danish Hydraulics Institute’s Mike21 modelling suite of tools. The model has been forced with astronomical tidal levels, derived from the TPX07.2 global tidal model, and meteorological fields, from the US National Center for Environmental Prediction’s global reanalysis, to generate a 61-year (1949 to 2009) hindcast of water levels. This model output has been validated against measurements from 30 tide gauge sites around Australia with long records. At each of the model grid points located around the coast, time series of annual maxima and the several highest water levels for each year were derived from the multi-decadal water level hindcast and have been fitted to extreme value distributions to estimate exceedance probabilities. Stage 1 provided a reliable estimate of the present day total water level exceedance probabilities around southern Australia, which is mainly impacted by extra-tropical storms. However, as the meteorological fields used to force the hydrodynamic model only weakly include the effects of tropical cyclones the resultant water levels exceedance probabilities were underestimated around western, northern and north-eastern Australia at higher return periods. Even if the resolution of the meteorological forcing was adequate to represent tropical cyclone-induced surges, multi-decadal periods yielded insufficient instances of tropical cyclones to enable the use of traditional extreme value extrapolation techniques. Therefore, in the second stage of the study, a statistical model of tropical cyclone tracks and central pressures was developed using histroic observations. This model was then used to generate synthetic events that represented 10,000 years of cyclone activity for the Australia region, with characteristics based on the observed tropical cyclones over the last ~40 years. Wind and pressure fields, derived from these synthetic events using analytical profile models, were used to drive the hydrodynamic model to predict the associated storm surge response. A random time period was chosen, during the tropical cyclone season, and astronomical tidal forcing for this period was included to account for non-linear interactions between the tidal and surge components. For each model grid point around the coast, annual maximum total levels for these synthetic events were calculated and these were used to estimate exceedance probabilities. The exceedance probabilities from stages 1 and 2 were then combined to provide a single estimate of present day extreme water level probabilities around the whole coastline of Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The potential impacts of extreme water level events on our coasts are increasing as populations grow and sea levels rise. To better prepare for the future, coastal engineers and managers need accurate estimates of average exceedance probabilities for extreme water levels. In this paper, we estimate present day probabilities of extreme water levels around the entire coastline of Australia. Tides and storm surges generated by extra-tropical storms were included by creating a 61-year (1949-2009) hindcast of water levels using a high resolution depth averaged hydrodynamic model driven with meteorological data from a global reanalysis. Tropical cyclone-induced surges were included through numerical modelling of a database of synthetic tropical cyclones equivalent to 10,000 years of cyclone activity around Australia. Predicted water level data was analysed using extreme value theory to construct return period curves for both the water level hindcast and synthetic tropical cyclone modelling. These return period curves were then combined by taking the highest water level at each return period.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The self-modulation process of a high-frequency surface wave (SW) in a wave-guiding structure - a semibounded magnetoactive plasma and perfectly conducting metal wall - is considered for the weak nonlinearity approximation. Estimates are given for the contributions to the nonlinear frequency shift of the SW from the two principal self-action channels: via the generation of a signal of the doubled frequency and of static surface perturbations, arising as the result of the action of a ponderomotive force. Solutions for the field envelope of the nonlinear wave are examined with regard to their stability with respect to longitudinal and transverse perturbations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To date, designed topologies for DC-AC inversion with both voltage-buck and boost capabilities are mainly focused on two-level circuitries with extensions to three-level possibilities left nearly unexplored. Contributing to this area of research, this paper presents the design of a number of viable buck-boost three-level inverters that can also support bidirectional power conversion. The proposed front-end circuitry is developed from the Cuk-derived buck-boost two-level inverter, and by using the "alternative phase opposition disposition" (APOD) modulation scheme, the buck-boost three-level inverters can perform distinct five-level line voltage and three-level phase voltage switching by simply controlling the active switches located in the designed voltage boost section of the circuits. As a cost saving option, one active switch can further be removed from the voltage-boost section of the circuits by simply re-routing the gating commands of the remaining switches without influencing the ac output voltage amplitude. To verify the validity of the proposed inverters, Matlab/PLECS simulations were performed before a laboratory prototype was implemented for experimental testing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To date, designed topologies for DC-AC inversion with both voltage buck and boost capabilities are mainly focused on two-level circuitries with extensions to three-level possibilities left nearly unexplored. Contributing to this area of research, this paper presents the design of a number of viable buck-boost three-level inverters that can also support bidirectional power conversion. The proposed front-end circuitry is developed from the Cuk-derived buck-boost two-level inverter, and by using the ldquoalternative phase opposition dispositionrdquo modulation scheme, the buck-boost three-level inverters can perform distinct five-level line voltage and three-level phase voltage switching by simply controlling the active switches located in the designed voltage boost section of the circuits. As a cost saving option, one active switch can further be removed from the voltage boost section of the circuits by simply rerouting the gating commands of the remaining switches without influencing the AC output voltage amplitude. To verify the validity of the proposed inverters, MATLAB/PLECS simulations were performed before a laboratory prototype was implemented for experimental testing.