937 resultados para Transit Operations


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fastener holes in aeronautical structures are typical sources of fatigue cracks due to their induced local stress concentration. A very efficient solution to this problem is to establish compressive residual stresses around the fastener holes that retard the fatigue crack nucleation and its subsequent local propagation. Previous work done on the subject of the application of LSP treatment on thin, open-hole specimens [1] has proven that the LSP effect on fatigue life of treated specimens can be detrimental, if the process is not properly optimized. In fact, it was shown that the capability of the LSP to introduce compressive residual stresses around fastener holes in thin-walled structures representative of typical aircraft constructions was not superior to the performance of conventional techniques, such as cold-working.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this paper is to propose a model for the design of a robust rapid transit network. In this paper, a network is said to be robust when the effect of disruption on total trip coverage is minimized. The proposed model is constrained by three different kinds of flow conditions. These constraints will yield a network that provides several alternative routes for given origin–destination pairs, therefore increasing robustness. The paper includes computational experiments which show how the introduction of robustness influences network design

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As a thermal separation method, distillation is one of the most important technologies in the chemical industry. Given its importance, it is no surprise that increasing efforts have been made in reducing its energy inefficiencies. A great deal of research is focused in the design and optimization of the Divided-Wall Column. Its applications are still reduced due to distrust of its controllability. Previous references studied the decentralized control of DWC but still few papers deal about Model Predictive Control. In this work we present a decentralized control of both a DWC column along with its equivalent MPC schema.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The road to the automation of the agricultural processes passes through the safe operation of the autonomous vehicles. This requirement is a fact in ground mobile units, but it still has not well defined for the aerial robots (UAVs) mainly because the normative and legislation are quite diffuse or even inexistent. Therefore, to define a common and global policy is the challenge to tackle. This characterization has to be addressed from the field experience. Accordingly, this paper presents the work done in this direction, based on the analysis of the most common sources of hazards when using UAV's for agricultural tasks. The work, based on the ISO 31000 normative, has been carried out by applying a three-step structure that integrates the identification, assessment and reduction procedures. The present paper exposes how this method has been applied to analyze previous accidents and malfunctions during UAV operations in order to obtain real failure causes. It has allowed highlighting common risks and hazardous sources and proposing specific guards and safety measures for the agricultural context.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nowadays, processing Industry Sector is going through a series of changes, including right management and reduction of environmental affections. Any productive process which looks for sustainable management is incomplete if Cycle of Life of mineral resources sustainability is not taken into account. Raw materials for manufacturing are provided by mineral resources extraction processes, such as copper, aluminum, iron, gold, silver, silicon, titanium? Those elements are necessary for Mankind development and are obtained from the Earth through mineral extractive processes. Mineral extraction processes are operations which must take care about the environmental consequences. Extraction of huge volumes of rock for their transformation into raw materials for industry must be optimized to reduce ecological cost of the final product as l was possible. Reducing the ecological balance on a global scale has no sense to design an efficient manufacturing in secondary industry (transformation), if in first steps of the supply chain (extraction) impact exceeds the savings of resources in successive phases. Mining operations size suggests that it is an environmental aggressive activity, but precisely because of its great impact must be the first element to be considered. That idea implies that a new concept born: Reduce economical and environmental cost This work aims to make a reflection on the parameters that can be modified to reduce the energy cost of the process without an increasing in operational costs and always ensuring the same production capacity. That means minimize economic and environmental cost at same time. An efficient design of mining operation which has taken into account that idea does not implies an increasing of the operating cost. To get this objective is necessary to think in global operation view to make that all departments involved have common guidelines which make you think in the optimization of global energy costs. Sometimes a single operational cost must be increased to reduce global cost. This work makes a review through different design parameters of surface mining setting some key performance indicators (KPIs) which are estimated from an efficient point of view. Those KPIs can be included by HQE Policies as global indicators. The new concept developed is that a new criteria has to be applied in company policies: improve management, improving OPERATIONAL efficiency. That means, that is better to use current resources properly (machinery, equipment,?) than to replace them with new things but not used correctly. As a conclusion, through an efficient management of current technologies in each extractive operation an important reduction of the energy can be achieved looking at downstream in the process. That implies a lower energetic cost in the whole cycle of life in manufactured product.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

All activities of an organization involve risks that should be managed. The risk management process aids decision making by taking account of uncertainty and the possibility of future events or circumstances (intended or unintended) and their effects on agreed objectives. With that idea, new ISO Standard has been drawn up. ISO 31010 has been recently issued which provides a structured process that identifies how objectives may be affected, and analyses the risk in term of consequences and their probabilities before deciding on whether further treatment is required. In this lecture, that ISO Standard has been adapted to Open Pit Blasting Operations, focusing in Environmental effects which can be managed properly. Technique used is Fault Tree Analysis (FTA), which is applied in all possible scenarios, providing to Blasting Professionals the tools to identify, analyze and manage environmental effects in blasting operations. Also this lecture can help to minimize each effect, studying each case. This paper also can be useful to Project Managers and Occupational Health and Safety Departments (OH&S) because blasting operations can be evaluated and compared one to each other to determine the risks that should be managed in different case studies. The environmental effects studied are: ground vibrations, flyrock and air overpressure (airblast). Sometimes, blasting operations are carried out near populated areas where environmental effects may impose several limitations on the use of explosives. In those cases, where these factors approach certain limits, National Standards and Regulations have to be applied.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper focuses on the railway rolling stock circulation problem in rapid transit networks where the known demand and train schedule must be met by a given fleet. In rapid transit networks the frequencies are high and distances are relatively short. Although the distances are not very large, service times are high due to the large number of intermediate stops required to allow proper passenger flow. The previous circumstances and the reduced capacity of the depot stations and that the rolling stock is shared between the different lines, force the introduction of empty trains and a careful control on shunting operation. In practice the future demand is generally unknown and the decisions must be based on uncertain forecast. We have developed a stochastic rolling stock formulation of the problem. The computational experiments were developed using a commercial line of the Madrid suburban rail network operated by RENFE (The main Spanish operator of suburban trains of passengers). Comparing the results obtained by deterministic scenarios and stochastic approach some useful conclusions may be obtained.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Light rail systems have proliferated in Spain in the last decade, following a tendency that is common not only in other European countries but also in other parts of the world. This paper reviews the benefits of light rail systems, both related to environmental issues and mobility issues. It analyses the evolution of light rail projects in Spain and shows that light rail systems in this country have evolved towards an extensive use of public-private partnerships. The analysis of the Spanish projects, however, does not contribute any conclusive evidence about whether public-private partnerships have been more efficient than publicly owned enterprises in building and operating light rail systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bus rapid transit (BRT) systems are massive transport systems with medium/high capacity, high quality service and low infrastructure and operating costs. TransMilenio is Bogotá's most important mass transportation system and one of the biggest BRT systems in the world, although it only has completed its third construction phase out of a total of eight. In this paper we review the proposals in the literature to optimize BRT system operation, with a special emphasis on TransMilenio, and propose a mathematical model that adapts elements of the above proposals and incorporates novel elements accounting for the features of TransMilenio system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effects of considering the particle comminution rate -kc- in addition to particle rumen outflow -kp- and the ruminal microbial contamination on estimates of by-pass and intestinal digestibility of DM, organic matter and crude protein were examined in perennial ryegrass and oat hays. By-pass kc-kp-based values of amino acids were also determined. This study was performed using particle transit, in situ and 15N techniques on three rumen and duodenum-cannulated wethers. The above estimates were determined using composite samples from rumen-incubated residues representative of feed by-pass. Considering the comminution rate, kc, modified the contribution of the incubated residues to these samples in both hays and revealed a higher microbial contamination, consistently in oat hay and only as a tendency for crude protein in ryegrass hay. Not considering kc or rumen microbial contamination overvalued by-pass and intestinal digestibility in both hays. Therefore, non-microbial-corrected kp-based values of intestinal digested crude protein were overestimated as compared with corrected and kc-kp-based values in ryegrass hay -17.4 vs 4.40%- and in oat hay -5.73 vs 0.19%-. Both factors should be considered to obtain accurate in situ estimates in grasses, as the protein value of grasses is very conditioned by the microbial synthesis derived from their ruminal fermentation. Consistent overvaluations of amino acid by-pass due to not correcting microbial contamination were detected in both hays, with large variable errors among amino acids. A similar degradation pattern of amino acids was recorded in both hays. Cysteine, methionine, leucine and valine were the most degradation-resistant amino acids.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aim of study: to review the present state of the art in relation to the main labour risks and the most relevant results of recent studies evaluating the safety and health conditions of the forest harvesting work and better ways to reduce accidents. Area of study: It focuses mainly on developed Countries, where the general concern about work risks prevention, together with the complex idiosyncrasy of forest work in forest harvesting operations, has led to a growing interest from the forest scientific and technical community. Material and Methods: The main bibliographic and Internet references have been identified using common reference analysis tools. Their conclusions and recommendations have been comprehensively summarized. Main results: Collection of the principal references and their most important conclusions relating to the main accident risk factors, their causes and consequences, the means used towards their prevention, both instrumental as well as in the aspects of training and business management, besides the influence of the growing mechanization of logging operations on those risks. Research highlights: Accident risk is higher in forest harvesting than in most other work sectors, and the main risk factors such as experience, age, seasonality, training, protective equipment, mechanization degree, etc. have been identified and studied. The paper summarizes some relevant results, one of the principal being that the proper entrepreneurial risk management is a key factor leading to the success in minimizing labour risks..

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents an operational concept for Air Traffic Management, and in particular arrival management, in which aircraft are permitted to operate in a manner consistent with current optimal aircraft operating techniques. The proposed concept allows aircraft to descend in the fuel efficient path managed mode and with arrival time not actively controlled. It will be demonstrated how the associated uncertainty in the time dimension of the trajectory can be managed through the application of multiple metering points strategically chosen along the trajectory. The proposed concept does not make assumptions on aircraft equipage (e.g. time of arrival control), but aims at handling mixed-equipage scenarios that most likely will remain far into the next decade and arguably beyond.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

El objetivo de este Proyecto Fin de Grado es el diseño de megafonía y PAGA (Public Address /General Alarm) de la estación de tren Waipahu Transit Center en la ciudad de Honolulú, Hawái. Esta estación forma parte de una nueva línea de tren que está en proceso de construcción actualmente llamada Honolulu Rail Transit. Inicialmente la línea de tren constará de 21 estaciones, en las que prácticamente todas están diseñadas como pasos elevados usando como referencia las autopistas que cruzan la isla. Se tiene prevista su fecha de finalización en el año 2019, aunque las primeras estaciones se inaugurarán en 2017. Se trata en primer lugar un estudio acústico del recinto a sonorizar, eligiendo los equipos necesarios: conmutadores, altavoces, amplificadores, procesador, equipo de control y micrófonos. Este primer estudio sirve para obtener una aproximación de equipos necesarios, así como la posible situación de estos dentro de la estación. Tras esto, se procede a la simulación de la estación mediante el programa de simulación acústica y electroacústica EASE 4.4. Para ello, se diseña la estación en un modelo 3D, en el que cada superficie se asocia a su material correspondiente. Para facilitar el diseño y el cómputo de las simulaciones se divide la estación en 3 partes por separado. Cada una corresponde a un nivel de la estación: Ground level, el nivel inferior que contiene la entrada; Concourse Level, pasillo que comunica los dos andenes; y Platform Level, en el que realizarán las paradas los trenes. Una vez realizado el diseño se procede al posicionamiento de altavoces en los diferentes niveles de la estación. Debido al clima existente en la isla, el cual ronda los 20°C a lo largo de todo el año, no es necesaria la instalación de sistemas de aire acondicionado o calefacción, por lo que la estación no está totalmente cerrada. Esto supone un problema al realizar las simulaciones en EASE, ya que al tratarse de un recinto abierto se deberán hallar parámetros como el tiempo de reverberación o el volumen equivalente por otros medios. Para ello, se utilizará el método Ray Tracing, mediante el cual se halla el tiempo de reverberación por la respuesta al impulso de la sala; y a continuación se calcula un volumen equivalente del recinto mediante la fórmula de Eyring. Con estos datos, se puede proceder a calcular los parámetros necesarios: nivel de presión sonora directo, nivel de presión sonora total y STI (Speech Transmission Index). Para obtener este último será necesario ecualizar antes en cada uno de los niveles de la estación. Una vez hechas las simulaciones, se comprueba que el nivel de presión sonora y los valores de inteligibilidad son acordes con los requisitos dados por el cliente. Tras esto, se procede a realizar los bucles de altavoces y el cálculo de amplificadores necesarios. Se estudia la situación de los micrófonos, que servirán para poder variar la potencia emitida por los altavoces dependiendo del nivel de ruido en la estación. Una vez obtenidos todos los equipos necesarios en la estación, se hace el conexionado entre éstos, tanto de una forma simplificada en la que se pueden ver los bucles de altavoces en cada nivel de la estación, como de una forma más detallada en la que se muestran las conexiones entre cada equipo del rack. Finalmente, se realiza el etiquetado de los equipos y un presupuesto estimado con los costes del diseño del sistema PAGA. ABSTRACT. The aim of this Final Degree Project is the design of the PAGA (Public Address / General Alarm) system in the train station Waipahu Transit Center in the city of Honolulu, Hawaii. This station is part of a new rail line that is currently under construction, called Honolulu Rail Transit. Initially, the rail line will have 21 stations, in which almost all are designed elevated using the highways that cross the island as reference. At first, it is treated an acoustic study in the areas to cover, choosing the equipment needed: switches, loudspeakers, amplifiers, DPS, control station and microphones. This first study helps to obtain an approximation of the equipments needed, as well as their placement inside the station. Thereafter, it is proceeded to do the simulation of the station through the acoustics and electroacoustics simulation software EASE 4.4. In order to do that, it is made the 3D design of the station, in which each surface is associated with its material. In order to ease the design and calculation of the simulations, the station has been divided in 3 zones. Each one corresponds with one level of the station: Ground Level, the lower level that has the entrance; Concourse Level, a corridor that links the two platforms; and Platform Level, where the trains will stop. Once the design is made, it is proceeded to place the speakers in the different levels of the station. Due to the weather in the island, which is about 20°C throughout the year, it is not necessary the installation of air conditioning or heating systems, so the station is not totally closed. This cause a problem when making the simulations in EASE, as the project is open, and it will be necessary to calculate parameters like the reverberation time or the equivalent volume by other methods. In order to do that, it will be used the Ray Tracing method, by which the reverberation time is calculated by the impulse response; and then it is calculated the equivalent volume of the area with the Eyring equation. With this information, it can be proceeded to calculate the parameters needed: direct sound pressure level, total sound pressure level and STI (Speech Transmission Index). In order to obtain the STI, it will be needed to equalize before in each of the station’s levels. Once the simulations are done, it is checked that the sound pressure level and the intelligibility values agree with the requirements given by the client. After that, it is proceeded to perform the speaker’s loops and the calculation of the amplifiers needed. It is studied the placement of the microphones, which will help to vary the power emitted by the speakers depending on the background noise level in the station. Once obtained all the necessary equipment in the station, it is done the connection diagram, both a simplified diagram in which there can be seen the speaker’s loops in each level of the station, or a more detailed diagram in which it is shown the wiring between each equipment of the rack. At last, it is done the labeling of the equipments and an estimated budget with the expenses for the PAGA design.