916 resultados para Pipeline Maintenance


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gazprom is determined to continue its efforts to build the South Stream gas pipeline regardless of the slump on the European gas market and the fact that there is sufficient capacity already in the existing transport infrastructure. The official inauguration of the maritime section of South Stream was held on 7 December this year, but the construction itself will commence in 2014. The agreements concluded so far, both intergovernmental and between corporations, are necessary for the launch of the construction of the new pipeline, but still do not guarantee that the project will be completed on time. First of all, some legal problems have yet to be resolved, such as the evaluation of the compliance of the planned actions with the ‘third energy package’ or the fact that ecological surveys required under European law need to be carried out. Secondly, given the present situation on the European gas market and medium-term forecasts, the high cost of implementation of this project and the maintenance expenses of existing pipelines – which are not being used to full capacity – the new project seems to be unfeasible. However, Gazprom’s determination in its efforts to build the pipeline proves that Russia is ready to take a high economic risk to maintain its dominant position on the European gas supply market; it will restrict the possibilities of alternative infrastructural projects being implemented (above all, the EU’s Southern Corridor) and use the construction of new pipelines as an instrument of political pressure on the present transit countries (especially Ukraine).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since taking power in 2009, the Alliance for European Integration (AIE) has been trying to end Moldova’s dependence on Russian gas. Currently, natural gas accounts for about 50% of the country’s energy balance (excluding Transnistria), and Gazprom has a monopoly on the supply of gas to the republic. The key element of Chișinău’s diversification project is the construction of the Iasi-Ungheni pipeline, which is designed to link the Moldovan and Romanian gas transmission networks, and consequently make it possible for Moldova to purchase gas from countries other than Russia. Despite significant delays, construction work on the interconnector began in August 2013. The Moldovan government sees ensuring energy independence from Russia as its top priority. The significance and urgency of the project reflect Chișinău’s frustration at Moscow’s continued attempts to use its monopoly of Moldova’s energy sector to exert political pressure on the republic. Nonetheless, despite numerous declarations by Moldovan and Romanian politicians, the Iasi- -Ungheni pipeline will not end Moldova’s dependence on Russian gas before the end of the current decade. This timeframe is unrealistic for two reasons: first, because an additional gas pipeline from Ungheni to Chisinau and a compression station must be constructed, which will take at least five years and will require significant investment; and second, because of the unrelenting opposition to the project coming from Gazprom, which currently controls Moldova’s pipelines and will likely try to torpedo any energy diversification attempts. Independence from Russian gas will only be possible after the the Gazprom-controlled Moldova-GAZ, the operator of the Moldovan transmission network and the country’s importer of natural gas, is divided. The division of the company has in fact been envisaged in the EU’s Third Energy Package, which is meant to be implemented by Moldova in 2020.