945 resultados para Infrastructure Projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Considerable progress has been made towards the successful classical biological control of many of Australia’s exotic weeds over the past decade. Some 43 new arthropod or pathogen agents were released in 19 projects. Effective biological control was achieved in several projects with the outstanding successes being the control of rubber vine, Cryptostegia grandiflora, and bridal creeper, Asparagus asparagoides. Significant developments also occurred in target prioritization, procedures for target and agent approval, funding, infrastructure and cooperation between agencies. Scientific developments included greater emphasis on climate matching, plant and agent phylogeny, molecular diagnostics, agent prioritization and agent evaluation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research was undertaken to encompass and identify challenges and impact factors that affect the successful outcomes of heritage building projects, especially those related to finding major causes of delays and cost overruns across projects in all Australian states. This project determined and analysed the causes of such delays and programme issues emanating from the planning and execution phases, whilst also analysing the requirements for management of multiple stakeholder relationships and the influence of unforeseen technical factors. The research proposes "call for action" guidance and was validated by experienced experts in heritage building projects in Australia. The proposed guidance is designed to ensure that realistic cost targets and delivery timeframes are set in future heritage projects, and necessary interventions made at appropriate project stages to ensure decisions are made that will help to prevent overtime and cost overuns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The network scenario is that of an infrastructure IEEE 802.11 WLAN with a single AP with which several stations (STAs) are associated. The AP has a finite size buffer for storing packets. In this scenario, we consider TCP controlled upload and download file transfers between the STAs and a server on the wireline LAN (e.g., 100 Mbps Ethernet) to which the AP is connected. In such a situation, it is known (see, for example, (3), [9]) that because of packet loss due to finite buffers at the Ap, upload file transfers obtain larger throughputs than download transfers. We provide an analytical model for estimating the upload and download throughputs as a function of the buffer size at the AP. We provide models for the undelayed and delayed ACK cases for a TCP that performs loss recovery only by timeout, and also for TCP Reno.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Improving development outcomes for smallholder farmers through closer collaboration between landcare and other ACIAR projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public private partnerships (PPP) are widely used for construction project procurement. However, the briefing stage of PPP projects has been largely overlooked, although it has a far-reaching influence throughout the project life cycle. In response, we rectify this by exploring the critical factors involved. A set of 15 procurement-related factors are first identified from the existing literature. Then the effects of four background variables on the factors are tested with Hong Kong government data by an exploratory factor analysis extracting four major dimensions. The relationships between these dimensions and background variables indicate the need to take the background variables into account when ranking the factors. The ranking of the factors is then obtained by considering their weighted importance. Finally, the final practical value of the results is discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Improved information on the product quality of the plantation resource is needed to allow businesses to consider investing in the development of value-adding processing facilities. These facilities are likely to require customised design that optimises the utilisation of future small diameter plantation hardwood logs. This log resource will become available as wood supply in Queensland transitions from native forests to 100% from sustainable plantations. This resource will be controlled by plantations established prior to 2000. A survey of the three main growers (former Forest Enterprises Australia Pty Ltd, former Forestry Corporation of New South Wales, Hancock Queensland Plantation Pty Ltd) revealed that C. citriodora subsp.variegata – CCV (28.0%), Eucalyptus dunnii (27.5%), E. pilularis (23.0%), E. grandis (11.3%) and E. cloeziana –GMS (7.1%) were the most widely planted species in the southern Queensland and northern New South Wales subtropical hardwood estate and would potentially dominate the supply of plantation hardwoods to sawmill processing facilities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Free and Open Source Software (FOSS) has gained increased interest in the computer software industry, but assessing its quality remains a challenge. FOSS development is frequently carried out by globally distributed development teams, and all stages of development are publicly visible. Several product and process-level quality factors can be measured using the public data. This thesis presents a theoretical background for software quality and metrics and their application in a FOSS environment. Information available from FOSS projects in three information spaces are presented, and a quality model suitable for use in a FOSS context is constructed. The model includes both process and product quality metrics, and takes into account the tools and working methods commonly used in FOSS projects. A subset of the constructed quality model is applied to three FOSS projects, highlighting both theoretical and practical concerns in implementing automatic metric collection and analysis. The experiment shows that useful quality information can be extracted from the vast amount of data available. In particular, projects vary in their growth rate, complexity, modularity and team structure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Developing major infrastructure and construction (MIC) projects is complicated, since it involves multifaceted policy issues. As a result, appropriate participatory mechanisms have been increasingly employed to improve the legitimacy of the project decision process. Yet it cannot always guarantee a mutually acceptable solution since the expectations and requirements of multiple stakeholders involved can be diverse and even conflicting. Overcoming this necessitates a thorough identification and careful analysis of the expectations of various stakeholder groups in MIC projects. On the other hand, though most project stakeholder concerns are consistent across the globe, contextual differences may lead to diverse priority levels being attached to these factors. This research, therefore, aimed to examine the perceptual differences between paired stakeholder groups from mainland China mega-cities and Hong Kong in rating their concerns over MIC projects. The research findings are expected to benefit both the Central Government of China and the Government of Hong Kong SAR for coping better with the rapid expansion of MIC projects in the territory and the increasing expectations of social equality, and therefore achieving the much desired harmonious development of the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Distributed Network Protocol v3.0 (DNP3) is one of the most widely used protocols to control national infrastructure. The move from point-to-point serial connections to Ethernet-based network architectures, allowing for large and complex critical infrastructure networks. However, networks and con- figurations change, thus auditing tools are needed to aid in critical infrastructure network discovery. In this paper we present a series of intrusive techniques used for reconnaissance on DNP3 critical infrastructure. Our algorithms will discover DNP3 outstation slaves along with their DNP3 addresses, their corresponding master, and class object configurations. To validate our presented DNP3 reconnaissance algorithms and demonstrate it’s practicality, we present an implementation of a software tool using a DNP3 plug-in for Scapy. Our implementation validates the utility of our DNP3 reconnaissance technique. Our presented techniques will be useful for penetration testing, vulnerability assessments and DNP3 network discovery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Any plan for decoupling growth from fossil fuel use needs to prioritise locally appropriate, integrated and multi-faceted outcomes. Such transitions can be highly complex, given the physical and institutional characteristics of existing electricity infrastructure as well as various financial, technical and practical challenges. This Chapter applies a whole systems perspective to developing decoupling solutions, reflecting on the Dutch Sustainable Technology Development Program and Townsville City (Queensland, Australia). Key aspects considered include the need for demonstrating outcomes to multiple stakeholders, using pilot projects with integrated monitoring and evaluation, fostering collaborative approaches to energy management, cultivating cultures of ‘learning by doing’, and seeking synergies across multiple agendas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The network scenario is that of an infrastructure IEEE 802.11 WLAN with a single AP with which several stations (STAs) are associated. The AP has a finite size buffer for storing packets. In this scenario, we consider TCP-controlled upload and download file transfers between the STAs and a server on the wireline LAN (e.g., 100 Mbps Ethernet) to which the AP is connected. In such a situation, it is well known that because of packet losses due to finite buffers at the AP, upload file transfers obtain larger throughputs than download transfers. We provide an analytical model for estimating the upload and download throughputs as a function of the buffer size at the AP. We provide models for the undelayed and delayed ACK cases for a TCP that performs loss recovery only by timeout, and also for TCP Reno. The models are validated incomparison with NS2 simulations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Theories of deliberative politics position grass-roots community members as more than spectators of politics, and instead recognize their capacity for political engagement by discussing and evaluating options in order to make decisions about issues affecting community life. The processes and products of journalism can assist deliberative politics by providing community members with information resources that are vital for understanding the root causes of problems, weighing up competing claims, forming networks around shared concerns, reaching decisions and undertaking action. This article presents the findings of case studies of four community–classroom projects--one each from Australia, New Zealand, the United States and South Africa--that develop the capacity of journalism students to be effective contributors to deliberative politics. The research points to the importance of learning activities that prepare students to work in diverse communities, map significant community places and structures, identify leaders and stakeholders, engage in respectful dialogue about problems and perspectives, and appreciate community frames and values.