968 resultados para Execution semantics


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The civil construction is an industrial sector of great economic importance and that it comes exponentially growing in the country. However, this activity is deficient in its management processes, and in this context that the management of construction as a way of organizing and controlling all the technical and construction of an enterprise. The literature shows that the manager has a key role throughout the process of planning, execution and analysis of the results of the work being of prime importance that all steps have its due attention in order to avoid any technical problems or lack information. The management’s main objective is the transparency of technical and financial information to investors and their assessments of physical and financial performances of the work intervened positively in quality, deadlines and costs. In this sense, this paper aims to present consideration about the proper management of a residential development in vertical construction

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The contemporary organizations establish complex networks of relationships with their audiences. However, it is the socio-historical setting of the organizations that allow that their internal structures, management and culture as well as their interests and goals in relation to the macro social environment to be understood. To understand what is currently proposed as institutional relations, it is necessary to search on that socio-historical source the progress in the studies of management and organizational communication aiming to prove the assumptions underlying this strategic role within organizations. In order to do that, this project raises ethnographic aspects of the institutional relationships to see what is proposed by the organizations and, therefore, highlights the lack of detailed studies in this area. From this survey, it is clear the possible role of public relations in contributing to studies, plans and execution of institutional relations according to the basement in the humanities and communication processes of networks of relationships between organizations

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Educação - FFC

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Ciência da Computação - IBILCE

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An optimal control framework to support the management and control of resources in a wide range of problems arising in agriculture is discussed. Lessons extracted from past research on the weed control problem and a survey of a vast body of pertinent literature led to the specification of key requirements to be met by a suitable optimization framework. The proposed layered control structure—including planning, coordination, and execution layers—relies on a set of nested optimization processes of which an “infinite horizon” Model Predictive Control scheme plays a key role in planning and coordination. Some challenges and recent results on the Pontryagin Maximum Principle for infinite horizon optimal control are also discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Once multi-relational approach has emerged as an alternative for analyzing structured data such as relational databases, since they allow applying data mining in multiple tables directly, thus avoiding expensive joining operations and semantic losses, this work proposes an algorithm with multi-relational approach. Methods: Aiming to compare traditional approach performance and multi-relational for mining association rules, this paper discusses an empirical study between PatriciaMine - an traditional algorithm - and its corresponding multi-relational proposed, MR-Radix. Results: This work showed advantages of the multi-relational approach in performance over several tables, which avoids the high cost for joining operations from multiple tables and semantic losses. The performance provided by the algorithm MR-Radix shows faster than PatriciaMine, despite handling complex multi-relational patterns. The utilized memory indicates a more conservative growth curve for MR-Radix than PatriciaMine, which shows the increase in demand of frequent items in MR-Radix does not result in a significant growth of utilized memory like in PatriciaMine. Conclusion: The comparative study between PatriciaMine and MR-Radix confirmed efficacy of the multi-relational approach in data mining process both in terms of execution time and in relation to memory usage. Besides that, the multi-relational proposed algorithm, unlike other algorithms of this approach, is efficient for use in large relational databases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper consists in the evaluation of the exposure rate to ionizing radiation to which professionals working in surgical procedures which require radiological examinations are subjected. Were initially performed real-time readings of exposure rate within four distinct operating rooms during the execution of four surgical procedures that made use of fluoroscopy equipment (including three orthopedic surgeries, one in the shoulder, one in the arm, another for deployment of metal pin in the leg region, and a fourth for vascular procedure); in these surgeries were used ionization chamber detector and an electrometer. In order to check the values achieved, was made a re-evaluation of the distribution of the rate of exposure to radiation, from the surgical procedures, now with thermoluminescent dosimeters (TLDs). For this, thirty TLDs were distributed in the operating rooms, arranged in points of interest as occupation by professionals. The TLDs were prepared for thirty consecutive days, after which they were removed and replaced with new dosimeters not exposed yet. The dosimeters were subjected to reading of the rate of exposure; this procedure was repeated for four months without interruption. The quantification of the results sought primarily to convert the rate of exposure for equivalent dose rate, both in measurements with ionization chamber as in measurements with TLDs, in order to highlight the presence of the biological effect of ionizing radiation for comparisons within scientific context. Then, the results were plotted to establish the relationship between the values of equivalent dose and the distance to the central axis of the x -ray source, confirming the inverse square law for distance. Finally, the values were associated with the maximum limit recommended by the legislation for occupationally exposed individuals. The methodology for the analysis and quantification of the data in this work aims at implementing a work plan that meets ...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wind power is a type of energy that is still not too explored in Brazil and, because of the lack of experience in projects of this size, there are still some problems during the stages of planning and execution of wind farms projects. One of these problems is related with the parts’ transportation logistics, since these parts are difficult to transport, because of their length, weight or shape. Furthermore, another aggravating factor is the lack of options regarding to the transportation modals that are available to do the route between the manufacture place and the project site. To help in the decision-making process about the ideal transportation configuration, aiming to reduce the dependence of the logistics’ coordinator, it was chosen to use he AHP method to compare some criteria that have influence in the modal’s choice process. The criteria, determined by the members of the company’s logistics’ department, are: transportation costs, transportation time and the risk of causing damages to the cargo. The results shown by this model, using theoretical background, that standardize the processes related to the modal’s choice

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Given the high competitiveness in the construction industry, businesses became necessary in a management which reduce costs and delivery times, and is fundamental to running a compatible planning with the magnitude of each work order is the same make feasible the executor. When it comes to planning, one is including both the physical planning of the work, time and duration of the events, as well as the preparation of the cost thereof. There are numerous ways to run the management of works, then it is necessary, in most cases, the planning experience, in previous works, the engineer in charge, because with it he should know what strategy to take the work skirt as planned and designed. For a complete and efficient management, an initial study hard to prepare the physical and financial planning it is necessary, in order to make it real and consistent throughout the execution of the work. It is necessary also a hard monitoring of both the physical and the financial schedule in order to what was initially planned to be completed as close as possible. This paper shows a case study which uses some ways to the management be held with the course of planning, medium and short term, as well as the preparation of the initial budget of the work. Will also be presented as is performed physical planning of a real estate work

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Brazil there are many cases of cities that suffer from flooding. It often destroys much of the structure of the city, and isolates many families. Relying on emergency measures for these cases and similar cases is of utmost importance. This paper proposes the development of a project of a timber bridge that can be used in emergency situations such as occurs in situations of floods and especially on side roads. It is considered one type of structural bridge which has, among other characteristics, an easy transportation and assembly of the elements. The development is carried out, at this early stage of the project, only about the verification and sizing of structural elements of the superstructure of the bridge. For this purpose, it relies on computer programs, and fundamentally on PCFrame Visual Taco. The first allows you to model the structure and determine the efforts of calculating the elements, and the second one assists at the scaling and the verifications in accordance with the Brazilian technical standards for timber bridges. The wood used in the project comes from the tree Eucalyptus saligna, which is easy to acquaint and manipulate and comes from the region Vale do Paraíba. The bridge in this case of application should have the characteristics mentioned below: short execution time, simplicity of structure and an assembly of a relatively low cost