848 resultados para Construction management


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Work in the Australian construction industry is fraught with risk and the potential for serious harm. The industry is consistently placed within the three most hazardous industries to work along with other industries such as mining and transport (National Occupational Health and Safety Commission, 2003). In the 2001 to 2002 period, construction work killed 39 people and injured 13,250 more. Hence, more effort is required to reduce the injury rate and maximise the value of the rehabilitation/back-to-work process.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The study presented in this paper reviewed 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011, in order to understand the relationships between the risk factors and injury severity (e.g. fatalities, hospitalized injuries, or non-hospitalized injuries) and to develop a strategic prevention plan to reduce the likelihood of fatalities where an accident is unavoidable. The study specifically aims to: (1) verify the relationships among risk factors, accident types, and injury severity, (2) determine significant risk factors associated with each accident type that are highly correlated to injury severity, and (3) analyze the impact of the identified key factors on accident and fatality occurrence. The analysis results explained that safety managers’ roles are critical to reducing human-related risks—particularly misjudgement of hazardous situations—through safety training and education, appropriate use of safety devices and proper safety inspection. However, for environment-related factors, the dominant risk factors were different depending on the different accident types. The outcomes of this study will assist safety managers to understand the nature of construction accidents and plan for strategic risk mitigation by prioritizing high frequency risk factors to effectively control accident occurrence and manage the likelihood of fatal injuries on construction sites.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A firm, as a dynamic, evolving, and quasi-autonomous system of knowledge production and application, develops knowledge management capability (KMC) through strategic learning in order to sustain competitive advantages in a dynamic environment. Knowledge governance mechanisms and knowledge processes connect and interact with each other forming learning mechanisms, which carry out double loop learning that drives genesis and evolution of KMC to modify operating routines that effect desired performance. This paper reports a study that was carried out within a context of construction contractors, a type of project-based firms, operating within the dynamic Hong Kong construction market. A multiple-case design was used to incorporate evidence from the literature and interviews, with the help of system dynamics modeling, to visualize the evolution of KMC. The study demonstrates the feasibility to visualize how a firm's KMC matches its operating environment over time. The findings imply that knowledge management (KM) applications can be better planned and controlled through evaluation of KM performance over time from a capability perspective.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

As the Indonesian construction industry is now promising to become the engine of national economic development, achieving quality and higher performance, not only domestically but also in the international market, are becoming crucial issues. Implementing quality management systems (QMSs) based on ISO 9001 are important in helping Indonesian construction companies become more competitive, for it is acknowledged that quality in construction is a major concern in the global construction industry. However, the possession of ISO 9001 certification does not reflect the presence of a well-operated QMS, which is capable of giving customer and project end-users satisfaction. The review of literature found that there is a significant correlation between a company.s organisational culture and the quality performance of contractors. While research into this area has involved many researchers, there is no critical mass of information specifically related to the Indonesian situation. Studies based on contemporary perspectives of the characteristics of the Indonesian construction organisational culture using Cameron and Quinn.s Organizational Culture Assessment Instrument (OCAI) and its relationship with the contractor.s ISO 9001 practices, have not been previously undertaken. This thesis research, therefore, investigated the culture profiles in Indonesian construction organisations, together with the current implementation of ISO 9001 and their performance during implementing QMSs, as information in these areas has a bearing on the poor performance and low levels of competitiveness of Indonesian construction companies. Questionnaire surveys were distributed to selected representative grade 7 civil engineering contractors located in the two provincial capitals of Makassar and Manado, and the national capital, Jakarta, in order to collect responses designed to examine the effectiveness of their QMSs implementation. The survey also aimed to identify current problems within the systems, and examine the performance of companies while implementing their QMSs. The questionnaire contained questions to assess the organisational culture profiles of Indonesian construction companies, adopting the OCAI. The survey results were then used to analyse the influence of different organisational culture profiles on QMSs implementation among respondent companies. The results from the questionnaire survey supported the development of a Culture-based Quality Management System Improvement Implementation Framework, designed to help Indonesian construction companies identify some typical barriers associated with impacting on effective QMSs implementation; to assist them to develop cultural values that can drive effective QMSs implementation; to undertake effective QMSs practices; and to recognise the potential results and longer-term benefits obtainable from implementing effective QMSs. A Focus Group Discussion was conducted with the assistance of a panel of professional construction practitioners, policy makers and academic experts, which further considered and validated the usefulness and applicability of the framework. Based on the outcome from this discussion and on the results of the earlier data analysis, a final version of the framework was developed to assist Indonesian construction companies in improving their capability of construction project delivery, and thereby contribute to providing or improving the competitive advantage of Indonesian construction companies in the local, national and global construction market.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

As sustainability becomes an important principle guiding various human activities around the globe, the higher education sector is being asked to take an active part in educating and promoting sustainability due to its moral responsibility, social obligation and its own needs to adapt to new circumstances. There is a global trend of higher education institutions embarking on responses to the sustainability challenge. On-campus building performance is one of the most important indicators for “sustainable universities”, because buildings carry substantially environmental burden such as considerable consumption of raw materials and energy as well as huge amount of waste generation and greenhouse gas emission. Plus, much research proves that building performance can impact on students and staff’s awareness about and behaviours related to sustainability. The past studies rarely discussed about sustainable construction projects in universities’ unique context. Universities are labeled with distinct characteristics such as complex governance, multiple cultures and juggling missions and so on. It is necessary and meaningful to examine the project management system in terms of universities’ organizational environment. Thus, this research project applies Delphi study to identify primary barriers to green technology application in on-campus buildings, critical factors for sustainable project success, key actions in project phases and strategies for project improvement. Through three rounds of questionnaires among panel experts, the authors obtain a profound understanding of project delivery system in universities. The research results are expected to provide sustainability practitioners with holistic understanding and generic information about sustainable construction project performance on campus as an assistance tool.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

As the biggest expo site in history, construction of the Shanghai Expo site faced a lot of challenges, including involvement of lots of investors, megaconstruction scale, concurrent construction mode, involvement of more than 40,000 migrant workers, and extremely tight completion deadlines, among others. Consequently, these challenges imposed great obstacles on accomplishing the safety, quality, and environmental goals. Through a case study of the Shanghai Expo construction, this paper paper presents the design and implementation of multicriteria incentives in megaprojects to accomplish the safety, quality, and environmental goals. Both quantitative and qualitative findings were triangulated to demonstrate the outcome of the incentives. Six critical success factors (CSFs) for the incentives, rule design, process orientation, top management support, training and promotion, communication in process, and process learning and improvement are identified and validated through case study data and content analysis. It is believed that the findings of this paper can enhance understanding of multicriteria incentive schemes in general and provide insights in implementing these incentive schemes in future megaprojects, particularly in the People’s Republic of China (PRC).

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The nature of construction projects and their delivery exposes participants to accidents and dangers. Safety climate serves as a frame of reference for employees to make sense of safety measures in the workplace and adapt their behaviors. Though safety climate research abounds, fewer efforts are made to investigate the formation of a safety climate. An effort to explore forming psychological safety climate, an operationalization of safety climate at the individual level, is an appropriate starting point. Taking the view that projects are social processes, this paper develops a conceptual framework of forming the psychological safety climate, and provides a preliminary validation. The model suggests that management can create the desired psychological safety climate by efforts from structural, perceptual, interactive, and cultural perspectives. Future empirical research can be built on the model to provide a more comprehensive and coherent picture of the determinants of safety climate.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Workplace stress has been an increasing concern in the construction industry. Workers are working longer hours and construction managers’ responsibilities are becoming more complex and complicated due to reduced resources and widespread stakeholder involvements. These additional pressures potentially trigger workplace stress and impact on project performance. The purpose of this study is to examine and advance understanding of stress and its impact relationships that support holistic and strategic stress management. 17 key stress sources are identified with their impact relationships on different stress types examined. Based on the research findings, this paper concludes with a Stressor-Stress-Performance relationships map.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose: Knowledge management (KM) is important to the knowledge-intensive construction industry. The diversified and changing nature of works in this field warrants us to stocktake, identify changes and map out KM research framework for future exploration. Design/methodology/approach: The study involves three aspects. First, three stages of KM research in construction were distinguished in terms of the time distribution of 217 target publications. Major topics in the stages were extracted for understanding the changes of research emphasis from evolutionary perspective. Second, the past works were summed up in a three-dimensional research framework in terms of management organization, managerial methodology and approach, and managerial objective. Finally, potential research orientations in the future were predicted to expand the existing research framework. Findings: It was found that (1) KM research has significantly blossomed in the last two decades with a great potential; (2) major topics of KM were changing in terms of technology, technique, organization, attribute of knowledge and research objectives; (3) past KM studies centred around management organization, managerial methodology and approach, and managerial objective thus a three-dimensional research framework was proposed; (4) within the research framework, team-level, project-level and firm-level KM were studied to achieve project, organizational and competitive objectives by integrated methodologies of information technology, social technique and KM process tool; and (5) nine potential research orientations were predicted corresponding to the three dimensions. Finally, an expanded research framework was proposed to encourage and guide future research works in this field. Research limitations/implications: The paper only focused on the construction industry. The findings need further exploration in order to discover any possible missing important research works which were not published in English or not included in the time period. Originality/value: The paper formed a systematic framework of KM research in construction and predicted the potential research orientations. It provides much value for the researchers who want to understand the past and the future of global KM research in the construction industry.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Electronic document management (EDM) technology has the potential to enhance the information management in construction projects considerably, without radical changes to current practice. Over the past fifteen years this topic has been overshadowed by building product modelling in the construction IT research world, but at present EDM is quickly being introduced in practice, in particular in bigger projects. Often this is done in the form of third party services available over the World Wide Web. In the paper, a typology of research questions and methods is presented, which can be used to position the individual research efforts which are surveyed in the paper. Questions dealt with include: What features should EMD systems have? How much are they used? Are there benefits from use and how should these be measured? What are the barriers to wide-spread adoption? Which technical questions need to be solved? Is there scope for standardisation? How will the market for such systems evolve?