991 resultados para Balneario de Fuensanta de Lorca (Murcia).


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Huella ferroviaria Recuperación del embarcadero del El Hornillo, Murcia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this paper is the development of a building cost estimation model whose purpose is to quickly and precisely evaluate rebuilding costs for historic heritage buildings affected by catastrophic events. Specifically, this study will be applied to the monumental buildings owned by the Catholic Church that were affected by two earthquakes on May 11, 2011 in the town of Lorca. To estimate the initial total replacement cost new, calculation model will be applied which, on the one hand, will use two-dimensional metric exterior parameters and, on the other, three-dimensional interior cubic parameters. Based on the total of the analyzed buildings, and considering damage caused by the seismic event, the final reconstruction cost for the building units ruined by the earthquakes can be estimated. The proposed calculation model can also be applied to other emergency scenarios and situations for the quick estimation of construction costs necessary for rebuilding historic heritage buildings which have been affected by catastrophic events that deteriorate or ruin their structural or constructive configuration.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On Wednesday 11th May 2011 at 6:47 pm (local time) a magnitude 5.1 Mw earthquake occurred 6 km northeast of Lorca with a depth of around 5 km. As a consequence of the shallow depth and the small epicentral distance, important damage was produced in several masonry constructions and even led to the collapse of one of them. Pieces of the facades of several buildings fell down onto the sidewalk, being one of the reasons for the killing of a total of 9 people. The objective of this paper is to describe and analyze the failure patterns observed in reinforced concrete frame buildings with masonry infill walls ranging from 3 to 8 floors in height. Structural as well as non-structural masonry walls suffered important damage that led to redistributions of forces causing in some cases the failure of columns. The importance of the interaction between the structural frames and the infill panels is analyzed by means of non-linear Finite Element Models. The resulting load levels are compared with the member capacities and the changes of the mechanical properties during the seismic event are described and discussed. In the light of the results obtained the observed failure patterns are explained. Some comments are stated concerning the adequacy of the numerical models that are usually used during the design phase for the seismic analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Olor a mar. Sobre la galería "My name is Lolita" de Martín Lejarraga en Murcia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Este proyecto desarrolla el diseño de una central de ciclo combinado de 940 MW de potencia. Su objeto es cubrir la demanda energética que tiene actualmente la Región de Murcia y generar la energía suficiente para cesar el uso de la central térmica de carbón, que cubre la demanda actual.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJETIVOS ESPECÍFICOS del proyecto: - Conocer de manera básica la historia del LiDAR y cómo se ha ido desarrollando. - Comprender el funcionamiento del LiDAR para un posterior entendimiento de los resultados obtenidos a partir del Control de Calidad. - Confeccionar un esquema para la metodología decidiendo el procedimiento a seguir. - Una vez hallados los resultados comprobar que medidas estadísticas descriptivas son más óptimas a la hora de mostrar los resultados. ALCANCE DEL PROYECTO. Al llevar a cabo este proyecto en el cual se ha realizado un Control de Calidad de una nube de puntos LiDAR como se especifica en el título del mismo se pretende alcanzar dos principales objetivos, uno inmediato y que obtenemos durante el procedimiento del proyecto y otro objetivo con vistas al futuro. El objetivo inmediato corresponde a la obtención de errores una vez realizado el Control de Calidad. Hallados los resultados se han llevado a cabo diferentes comparaciones y comprobaciones con el fin de detectar errores sistemáticos que se puedan subsanar en un futuro de manera inmediata. Como objetivo futuro y a consecuencia del anterior sería la automatización de todos los procedimientos realizados en este proyecto, es decir, la obtención de una aplicación informática la cual englobase todas las funciones que se han utilizado y que además pudiera eliminar posibles errores sistemáticos producidos por el LiDAR.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Monteagudo y "El Castillejo", en la Vega de Murcia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

El presente trabajo tiene por objeto un estudio económico y selvicola de la Sierra del Molar y de la Tienda. Es decir, como los montes jumillanos se hallan en un deplorable abandono, iniciar los trabajos necesarios para poner esos montes en máxima producción y hacer viable la saca de sus productos.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

El baño musulmán de Murcia y su conservación