997 resultados para Amplitude, number beams


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This act declares that the Long Term Care Ombudsman program is and shall remain an independent voice for Iowans in long-terms care facilities and shall continue to meet all requirements for the Federal Older American Act, but shall be housed with and administratively supported the Department of Again. ATTENTION: This is not an official copy of the executive order due to the lack of no seal or signature.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This act is a competitive and dynamic environment for job creators is needed to achieve our goal of 200,000 new jobs for Iowans and a 25% increase in family incomes over the next five years.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This order rescinds the Natural Resource Commission's (NRC) rule banning the use of traditional shot used in hunting.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa has the same problem that confronts most states in the United States: many bridges constructed more than 20 years ago either have deteriorated to the point that they are inadequate for original design loads or have been rendered inadequate by changes in design/maintenance standards or design loads. Inadequate bridges require either strengthening or posting for reduced loads. A sizeable number of single span, composite concrete deck - steel I beam bridges in Iowa currently cannot be rated to carry today's design loads. Various methods for strengthening the unsafe bridges have been proposed and some methods have been tried. No method appears to be as economical and promising as strengthening by post-tensioning of the steel beams. At the time this research study was begun, the feasibility of posttensioning existing composite bridges was unknown. As one would expect, the design of a bridge-strengthening scheme utilizing post-tensioning is quite complex. The design involves composite construction stressed in an abnormal manner (possible tension in the deck slab), consideration of different sizes of exterior and interior beams, cover-plated beams already designed for maximum moment at midspan and at plate cut-off points, complex live load distribution, and distribution of post-tensioningforces and moments among the bridge beams. Although information is available on many of these topics, there is miminal information on several of them and no information available on the total design problem. This study, therefore, is an effort to gather some of the missing information, primarily through testing a half-size bridge model and thus determining the feasibility of strengthening composite bridges by post-tensioning. Based on the results of this study, the authors anticipate that a second phase of the study will be undertaken and directed toward strengthening of one or more prototype bridges in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Executive Order 17, signed by Governor Chester J. Culver on September 25, 2009, emphasizes revitalization of historic properties and cultural and entertainment districts and also supports safe and healthy work places, sustainable design and cost effective use of state resources. Specifically, the Executive Order requires that State entities managing or leasing real estate on behalf of the State shall give priority to the needs of public entities and the populations they serve consistent with the cost effective use of state revenues. It also indicates that existing resources and facilities shall be used where adequate, cost competitive and appropriate for efficient and effective current state operations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This order directs the Department of Administrative Services to implement an arrangement wherby state employees may voluntarily contribute twenty percent of their health care costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This order directs Article IV, section 9 of the constitution of the State of Iowa provides that the Governor shall ensure the laws are faithfully executed. In this Executive Order many other Orders were resented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This order when adopting regulations to protect the healthy, safety and welfare of the people of the State of Iowa, state agencies should seek to achieve statutory goals as effectively and efficiently as possible without imposing unnecessary burdens.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In severe and variable conditions, specialized resource selection strategies should be less fre‐ quent because extinction risks increase for species that depend on a single and unstable resource. Psithyrus (Bombus subgenus Psithyrus) are bumblebee parasites that usurp Bombus nests and display inter‐specific variation in the number of hosts they parasitize. Using a phylogenetic comparative frame‐ work, we show that Psithyrus species at higher elevations display a higher number of hosts species com‐ pared with species restricted to lower elevations. Species inhabiting high elevations also cover a larger temperature range, suggesting that species able to occur in colder conditions may benefit from recruit‐ ment from populations occurring in warmer conditions. Our results provide evidence for an 'altitudinal niche breadth hypothesis' in parasitic species, showing a decrease in the parasites' specialization along the elevational gradient, and also suggesting that Rapoport's rule might apply to Psithyrus.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) and the Iowa and Illinois Departments of Transportation (Iowa DOT and IDOT) have identified the Selected Alternative for improving Interstate 74 (I-74) from its southern terminus at Avenue of the Cities (23rd Avenue) in Moline, Illinois to its northern terminus one mile north of the I-74 interchange with 53rd Street in Davenport, Iowa. The Selected Alternative identified and discussed in this Record of Decision is the preferred alternative identified in the Final Environmental Impact Statement (FEIS). The purpose of the proposed improvements is to improve capacity, travel reliability, and safety along I-74 between its termini, and provide consistency with local land use planning goals. The need for the proposed improvements to the I-74 corridor is based on a combination of factors related to providing better transportation service and sustaining economic development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND--Oesophageal motor abnormalities have been reported in alcoholism. AIM--To investigate the effects of chronic alcoholism and its withdrawal on oesophageal disease. PATIENTS--23 chronic alcoholic patients (20 men and three women; mean age 43, range 23 to 54). METHODS--Endoscopy, manometry, and 24 hour pH monitoring 7-10 days and six months after ethanol withdrawal. Tests for autonomic and peripheral neuropathy were also performed. Motility and pH tracings were compared with those of age and sex matched control groups: healthy volunteers, nutcracker oesophagus, and gastro-oesophageal reflux disease. RESULTS--14 (61%) alcoholic patients had reflux symptoms, and endoscopy with biopsy showed oesophageal inflammation in 10 patients. One patient had an asymptomatic squamous cell carcinoma. Oesophageal motility studies in the alcoholic patients showed that peristaltic amplitude in the middle third was > 150 mm Hg (95th percentile (P95) of healthy controls) in 13 (57%), the ratio lower/ middle amplitude was < 0.9 in 15 (65%) (> 0.9 in all control groups), and the lower oesophageal sphincter was hypertensive (> 23.4 mm Hg, P95 of healthy controls) in 13 (57%). All three abnormalities were present in five (22%). Abnormal reflux (per cent reflux time > 2.9, P95 of healthy controls) was shown in 12 (52%) alcoholic patients, and was unrelated to peristaltic dysfunction. Subclinical neuropathy in 10 patients did not effect oesophageal abnormalities. Oesophageal motility abnormalities persisted at six months in six patients with ongoing alcoholism, whereas they reverted towards normal in 13 who remained abstinent; reflux, however, was unaffected. CONCLUSIONS--Oesophageal peristaltic dysfunction and reflux are frequent in alcoholism. High amplitude contractions in the middle third of the oesophagus seem to be a marker of excessive alcohol consumption, and tend to improve with abstinence.