961 resultados para slotting contracts
Resumo:
Long-Term Community Recovery Targeted Technical Assistance Strategy is an outcome of the coordinated effort of the city, Rebuild Iowa Office and Federal Emergency Management Agency Emergency Support Function. In partnership with City officials and RIO and informed by community outreach efforts, provided Targeted Technical Assistance to the community. This support helped the community identify and provide visibility to recovery issues, needs and opportunities that when addressed can result in a more effective long-term recovery for the community.
Resumo:
Long-Term Community Recovery Targeted Technical Assistance Strategy is an outcome of the coordinated effort of the city, Rebuild Iowa Office and Federal Emergency Management Agency Emergency Support Function. In partnership with City officials and RIO and informed by community outreach efforts, provided Targeted Technical Assistance to the community. This support helped the community identify and provide visibility to recovery issues, needs and opportunities that when addressed can result in a more effective long-term recovery for the community.
Resumo:
The Department of Corrections contracts with Spectrum Health Systems to conduct front-end substance abuse assessments at the inmate reception center – Iowa Medical and Classification Center. Such assessments are considered vital in so far as 80-85% of offenders in DOC institutions list alcohol/drug problems as one of their top three need areas.
Resumo:
We empirically assess the effect of the winner's curse in auctions for toll road concessions, taking into account, to our knowledge for the first time, problems of commitment and enforcement, using a unique dataset of 49 worldwide road concessions.
Resumo:
Independent Living foster care is a foster care type of placement in which youth served must be at least 16 years of age and have the capacity to function outside the structure of a foster family or group care setting. This is a annual report about these living arrangements and how the Department of Human Services contracts them.
Resumo:
The individual life model has always been considered as the one closest to the real situation of the total claims of a life insurance portfolio. It only makes the ¿nearly inevitable assumption¿ of independence of the lifelenghts of insured persons in the portfolio. Many clinical studies, however, have demonstrated positive dependence of paired lives such as husband and wife. In our opinion, it won¿t be unrealistic expecting a considerable number of married couples in any life insurance portfolio (e.g. life insurance contracts formalized at the time of signing a mortatge) and these dependences materially increase the values for the stop-loss premiums associated to the aggregate claims of the portfolio. Since the stop-loss order is the order followed by any risk averse decison maker, the simplifying hypothesis of independence constitute a real financial danger for the company, in the sense that most of their decisions are based on the aggregated claims distribution. In this paper, we will determine approximations for the distribution of the aggregate claims of a life insurance portfolio with some married couples and we will describe how to make safe decisions when we don¿t know exactly the dependence structure between the risks in each couple. Results in this paper are partly based on results in Dhaene and Goovaerts (1997)
Resumo:
Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.
Resumo:
Premature deterioration of concrete at the joints in concrete pavements and parking lots has been reported across the northern states. The distress is first observed as shadowing when microcracking near the joints traps water, later exhibiting as significant loss of material. Not all roadways are distressed, but the problem is common enough to warrant attention. The aim of the work being conducted under this and parallel contracts was to improve understanding of the mechanisms behind premature joint deterioration and, based on this understanding, develop training materials and guidance documents to help practitioners reduce the risk of further distress and provide guidelines for repair techniques. While work is still needed to understand all of the details of the mechanisms behind premature deterioration and prevention of further distress, the work in this report has contributed to advancing the state of knowledge.
Resumo:
Expansion joints increase both the initial cost and the maintenance cost of bridges. Integral abutment bridges provide an attractive design alternative because expansion joints are eliminated from the bridge itself. However, the piles in these bridges are subjected to horizontal movement as the bridge expands and contracts during temperature changes. The objective of this research was to develop a method of designing piles for these conditions. Separate field tests simulating a pile and a bridge girder were conducted for three loading cases: (1) vertical load only, (2) horizontal displacement of pile head only, and (3) combined horizontal displacement of pile head with subsequent vertical load. Both tests (1) and (3) reached the same ultimate vertical load, that is, the horizontal displacement had no effect on the vertical load capacity. Several model tests were conducted in sand with a scale factor of about 1:10. Experimental results from both the field and model tests were used to develop the vertical and horizontal load-displacement properties of the soil. These properties were input into the finite element computer program Integral Abutment Bridge Two-Dimensional (IAB2D), which was developed under a previous research contract. Experimental and analytical results compared well for the test cases. Two alternative design methods, both based upon the American Association of State Highway and Transportation Officials (AASHTO) Specification, were developed. Alternative One is quite conservative relative to IAB2D results and does not permit plastic redistribution of forces. Alternative Two is also conservative when compared to IAB2D, but plastic redistribution is permitted. To use Alternative Two, the pile cross section must have sufficient inelastic rotation capacity before local buckling occurs. A design example for a friction pile and an end-bearing pile illustrates both alternatives.
Resumo:
The objective of this report is to provide Iowa county engineers and highway maintenance personnel with procedures that will allow them to efficiently and effectively interpret and repair or avoid landslides. The research provides an overview of basic slope stability analyses that can be used to diagnose the cause and effect associated with a slope failure. Field evidence for identifying active or potential slope stability problems is outlined. A survey of county engineers provided data for presenting a slope stability risk map for the state of Iowa. Areas of high risk are along the western border and southeastern portion of the state. These regions contain deep to moderately deep loess. The central portion of the state is a low risk area where the surficial soils are glacial till or thin loess over till. In this region, the landslides appear to occur predominately in backslopes along deeply incised major rivers, such as the Des Moines River, or in foreslopes. The south-central portion of the state is an area of medium risk where failures are associated with steep backslopes and improperly compacted foreslopes. Soil shear strength data compiled from the Iowa DOT and consulting engineers files are correlated with geologic parent materials and mean values of shear strength parameters and unit weights were computed for glacial till, friable loess, plastic loess and local alluvium. Statistical tests demonstrate that friction angles and unit weights differ significantly but in some cases effective stress cohesion intercept and undrained shear strength data do not. Moreover, effective stress cohesion intercept and undrained shear strength data show a high degree of variability. The shear strength and unit weight data are used in slope stability analyses for both drained and undrained conditions to generate curves that can be used for a preliminary evaluation of the relative stability of slopes within the four materials. Reconnaissance trips to over fifty active and repaired landslides in Iowa suggest that, in general, landslides in Iowa are relatively shallow [i.e., failure surfaces less than 6 ft (2 m) deep] and are either translational or shallow rational. Two foreslope and two backslope failure case histories provide additional insights into slope stability problems and repair in Iowa. These include the observation that embankment soils compacted to less than 95% relative density show a marked strength decrease from soils at or above that density. Foreslopes constructed of soils derived from shale exhibit loss of strength as a result of weathering. In some situations, multiple causes of instability can be discerned from back analyses with the slope stability program XSTABL. In areas where the stratigraphy consists of loess over till or till over bedrock, the geologic contracts act as surfaces of groundwater accumulation that contribute to slope instability.
Resumo:
A review of the Iowa Department of Transportation's field data collection and reporting system has been performed. Included were several systems used by the Office of Construction and Local Jurisdictions. The entire field data collection and reporting systems for asphalt cement concrete (ACC) paving, portland cement concrete (PCC) paving, and PCC structures were streamlined and computerized. The field procedures for materials acceptance were also reviewed. Best practices were identified and a method was developed to prioritize materials so transportation agencies could focus their efforts on high priority materials. Iowa State University researchers facilitated a discussion about Equal Employment Opportunity (EEO) and Affirmative Action (AA) procedures between the Office of Construction field staff and the Office of Contracts. A set of alternative procedures was developed. Later the Office of Contracts considered these alternatives as they developed new procedures that are currently being implemented. The job close-out package was reviewed and two unnecessary procedures were eliminated. Numerous other procedures were reviewed and flowcharted. Several changes have been recommended that will increase efficiency and allow staff time to be devoted to higher priority activities. It is estimated the improvements in ACC paving, PCC paving and structural concrete will by similar to three full time equivalent (FTE) positions to field construction, field materials and Office of Materials. Elimination of EEO interviews will be equivalent to one FTE position. It is estimated that other miscellaneous changes will be equivalent to at least one other FTE person. This is a total five FTEs. These are conservative estimates based on savings that are easily quantified. It is likely that total positive effect is greater when items that are difficult to quantify are considered.
Resumo:
When referenced, the 2012 edition of the Iowa Department of Transportation’s (Iowa DOT) Standard Specifications for Highway and Bridge Construction shall be used for contract work awarded by the Iowa DOT. They may also be incorporated by reference in other contract work on secondary, urban, local systems, or other contract work in which the Iowa DOT has an interest. As modified by the General Supplemental Specifications, these Standard Specifications represent the minimum requirements and may be modified by Supplemental Specifications, Developmental Specifications, and Special Provisions on specific contracts. These Standard Specifications have been written so the Contractor’s responsibilities are indicated by plain language using the Imperative Mood and Active Voice form. Sentences are of the form: Construct isolation joints at all points where driveways meet other walks, curbs, or fixtures in the surface. Ensure finished members are true to detailed dimensions and free from twists, bends, open joints, or other defects resulting from faulty fabrication or defective work. Personnel preparing the JMF shall be Iowa DOT certified in bituminous mix design. The Contracting Authority’s responsibilities are (with some exceptions) indicated by the use of the modal verb “will”. Sentences are of the form: The Engineer will obtain and test density samples for each lot according to Materials I.M. 204. Payment will be the contract unit price for Fabric Reinforcement per square yard (square meter). These standard specifications contain dual units of measure: the United States Standard measure (English units) and the International System of Units (SI or “metric” units). The English units are expressed first then followed by the metric units in parentheses. The measurements expressed in the two systems are not necessarily equal. In some cases the measurements in metric units is a “hard” conversion of the English measurement; i.e. the metric unit has been approximated with a rounded, rationalized metric measurement that is easy to work with and remember. The proposal form will identify whether the work was designed and shall be constructed in English or metric units.
Resumo:
When deciding to resort to a PPP contract for the provision of a local public service, local governments have to consider the demand risk allocation between the contracting parties. In this article, I investigate the effects of demand risk allocation on the accountability of procuring authorities regarding consumers changing demand, as well as on the cost-reducing effort incentives of the private public-service provider. I show that contracts in which the private provider bears demand risk motivate more the public authority from responding to customer needs. This is due to the fact that consumers are empowered when the private provider bears demand risk, that is, they have the possibility to oust the private provider in case of non-satisfaction with the service provision, which provides procuring authorities with more credibility in side-trading and then more incentives to be responsive. As a consequence, I show that there is a lower matching with consumers' preferences over time when demand risk is on the public authority rather than on the private provider, and this is corroborated in the light of two famous case studies. However, contracts in which the private provider does not bear demand risk motivate more the private provider from investing in cost-reducing efforts. I highlight then a tradeoff in the allocation of demand risk between productive and allocative efficiency. The striking policy implication of this article for local governments would be that the current trend towards a greater resort to contracts where private providers bear little or no demand risk may not be optimal. Local governments should impose demand risk on private providers within PPP contracts when they expect that consumers' preferences over the service provision will change over time.
Resumo:
Structure of the Thesis This thesis consists of 5 sections. Section 1 starts with the problem definition and the presentation of the objectives of this thesis. Section 2 introduces a presentation of the theoretical foundations of Venture financing and a review of the main theories developed on Venture investing. It includes a taxonomy of contracting clauses relevant in venture contracting, the conflicts they address, and presents some general observations on contractual clauses. Section 3 presents the research findings on the analysis of a European VC's deal flow and investment screening linked to the prevailing market conditions. Section 4 focuses an empirical study of a European VC's investment process, the criteria it uses to make its investments. It presents empirical findings on the investment criteria over time, business cycles, and investment types. It also links these criteria to the VC's subsequent performance. Finally, section 5 presents an empirical research on the comparison of the legal contracts signed between European and United States Venture Capitalists and the companies they finance. This research highlights some of the contracting practices in Europe and the United States.
Resumo:
In past years, comprehensive representations of cell signalling pathways have been developed by manual curation from literature, which requires huge effort and would benefit from information stored in databases and from automatic retrieval and integration methods. Once a reconstruction of the network of interactions is achieved, analysis of its structural features and its dynamic behaviour can take place. Mathematical modelling techniques are used to simulate the complex behaviour of cell signalling networks, which ultimately sheds light on the mechanisms leading to complex diseases or helps in the identification of drug targets. A variety of databases containing information on cell signalling pathways have been developed in conjunction with methodologies to access and analyse the data. In principle, the scenario is prepared to make the most of this information for the analysis of the dynamics of signalling pathways. However, are the knowledge repositories of signalling pathways ready to realize the systems biology promise? In this article we aim to initiate this discussion and to provide some insights on this issue.