777 resultados para Project 2004-032-A : Construction Industry Business Environment (CIBE)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational structure within a project needs to be responsive, and dynamic. These needs are often not satisfied in the construction industry, due to the lack of analytical tools with which to analyse the environment and to design appropriate temporary organizations. This paper presents two techniques. First is the technique of "Environmental Complexity Analysis", which identifies the key variables in the environment of the construction project. These are classified as Financial, Legal, Technological, Aesthetic and Policy. It is proposed that their identification will set the parameters within which the project has to be managed. This provides a basis for the project managers to define the relevant set of decision points that will be required for the project. The Environmental Complexity Analysis also identifies the project's requirements for control systems concerning Budget, Contractual, Functional, Quality and Time control. The process of environmental scanning needs to be done at regular points during the procurement process to ensure that the organizational structure is adaptive to the changing environment. The second technique introduced is the technique of "3R analysis", being a graphical technique for describing and modelling Roles, Responsibilities and Relationships. A list of steps is introduced that explains the procedure recommended for setting up a flexible organizational structure that is responsive to the environment of the project. This is by contrast with the current trend towards predetermined procurement paths that may not always be in the best interests of the client.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper is from a study on specialist and trade contracting in the construction industry. The research was commissioned by CIRIA and undertaken by the University of Reading in conjunction with Sir Alexander Gibb & Partners Ltd. The purpose of the work was to provide guidance for effective and equitable practice in the management of projects where much of the work is executed, and possibly designed, by specialist and trade contractors (STCs). As part of this study, a preliminary investigation into the nature and origins of specialist contracting was undertaken, in conjunction with a survey of the problems confronting STCs. This paper presents that phase of the project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the rapid development in technology over recent years, construction, in common with many areas of industry, has become increasingly complex. It would, therefore, seem to be important to develop and extend the understanding of complexity so that industry in general and in this case the construction industry can work with greater accuracy and efficiency to provide clients with a better service. This paper aims to generate a definition of complexity and a method for its measurement in order to assess its influence upon the accuracy of the quantity surveying profession in UK new build office construction. Quantitative data came from an analysis of twenty projects of varying size and value and qualitative data came from interviews with professional quantity surveyors. The findings highlight the difficulty in defining and measuring project complexity. The correlation between accuracy and complexity was not straightforward, being subjected to many extraneous variables, particularly the impact of project size. Further research is required to develop a better measure of complexity. This is in order to improve the response of quantity surveyors, so that an appropriate level of effort can be applied to individual projects, permitting greater accuracy and enabling better resource planning within the profession.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This book is aimed primarily at students for whom the study of building or civil engineering contracts forms part of a construction-based course. We have had in mind the syllabus requirements for first degrees in Building, Civil Engineering, Architecture, Quantity Surveying and Building Surveying, as well as those of postgraduate courses in Construction Management and Project Management. We have also assumed that such students will already have been introduced to the general principles of English law, especially those relating to contract and tort. As a result, while aspects of those subjects that are of particular relevance to construction are dealt with here, the reader must look elsewhere for the general legal background. In producing this third edition, we have again been greatly assisted by the many helpful comments made by reviewers and users of its predecessor. Nonetheless, our basic aim is identical to that which underpinned the first edition: to provide an explanation of the fundamental principles of construction contract law, rather than a clause-by-clause analysis of any particular standard-form contract. As a result, while we draw most frequently upon JCT 98 for our illustrations of particular points, this merely reflects the pre-eminent position occupied by that particular form of contract in the UK construction industry. We conclude by repeating our previous warning as to the dangers inherent in a little learning. Neither this book, nor the courses for which it is intended, seek to produce construction lawyers. The objective is rather to enable those who are not lawyers to resolve simple construction disputes before they become litigious, and to recognize when matters require professional legal advice. It should be the aim of every construction student to understand the legal framework sufficiently that they can instruct and brief specialist lawyers, and this book is designed to help them towards that understanding.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Standard form contracts are typically developed through a negotiated consensus, unless they are proffered by one specific interest group. Previously published plans of work and other descriptions of the processes in construction projects tend to focus on operational issues, or they tend to be prepared from the point of view of one or other of the dominant interest groups. Legal practice in the UK permits those who draft contracts to define their terms as they choose. There are no definitive rulings from the courts that give an indication as to the detailed responsibilities of project participants. The science of terminology offers useful guidance for discovering and describing terms and their meanings in their practical context, but has never been used for defining terms for responsibilities of participants in the construction project management process. Organizational analysis enables the management task to be deconstructed into its elemental parts in order that effective organizational structures can be developed. Organizational mapping offers a useful technique for reducing text-based descriptions of project management roles and responsibilities to a comparable basis. Research was carried out by means of a desk study, detailed analysis of nine plans of work and focus groups representing all aspects of the construction industry. No published plan of work offers definitive guidance. There is an enormous amount of variety in the way that terms are used for identifying responsibilities of project participants. A catalogue of concepts and terms (a “Terminology”) has been compiled and indexed to enable those who draft contracts to choose the most appropriate titles for project participants. The purpose of this terminology is to enable the selection and justification of appropriate terms in order to help define roles. The terminology brings an unprecedented clarity to the description of roles and responsibilities in construction projects and, as such, will be helpful for anyone seeking to assemble a team and specify roles for project participants.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Throughout the developed world, professional services play an increasingly important part in an economy, with many countries showing a substantial positive trade balance for services. Yet, there has been relatively little research on construction services (CS) and, in particular, how well professional service companies (PSFs) perform in the international arena. The method for collecting services export information differs to the way in which goods and products exports data are gathered because of the intangible nature of services. Organisational growth of companies aims to share risks across different regions and sectors, however, the rapidly changing business environment challenges companies with the increasing foreign ownership and changes in procurement. The complexity of today’s international construction services organisations raises two questions: how the organisations can successfully manage growth and what are their motives for international trade. The research focuses on top UK consulting engineering companies to understand their organisational strategy, their export strategy, and drivers for overseas activities. The data will feed a model of professional services exports, which can help to inform the way services export data could be collected to better reflect the industry’s performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - The purpose of this paper is to provide a quantitative multicriteria decision-making approach to knowledge management in construction entrepreneurship education by means of an analytic knowledge network process (KANP) Design/methodology/approach- The KANP approach in the study integrates a standard industrial classification with the analytic network process (ANP). For the construction entrepreneurship education, a decision-making model named KANP.CEEM is built to apply the KANP method in the evaluation of teaching cases to facilitate the case method, which is widely adopted in entrepreneurship education at business schools. Findings- The study finds that there are eight clusters and 178 nodes in the KANP.CEEM model, and experimental research on the evaluation of teaching cases discloses that the KANP method is effective in conducting knowledge management to the entrepreneurship education. Research limitations/implications- As an experimental research, this paper ignores the concordance between a selected standard classification and others, which perhaps limits the usefulness of KANP.CEEM model elsewhere. Practical implications- As the KANP.CEEM model is built based on the standard classification codes and the embedded ANP, it is thus expected that the model has a wide potential in evaluating knowledge-based teaching materials for any education purpose with a background from the construction industry, and can be used by both faculty and students. Originality/value- This paper fulfils a knowledge management need and offers a practical tool for an academic starting out on the development of knowledge-based teaching cases and other teaching materials or for a student going through the case studies and other learning materials.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since its popularization in the 1980s, competitiveness has received close attention from practitioners and researchers across a wide range of industries. In the construction sector, many works on competitiveness have also been published. So far, however, there seems to be no comprehensive review to summarize and critique existing research on competitiveness in construction. This research, therefore, reviews the extant literature from four aspects: concept of competitiveness, competitiveness research at the construction industry level, competitiveness research at the firm level, and competitiveness research at the project level. The review presents the state-of-the-art development of competitiveness research in construction, identifies the research gaps, and proposes new directions for further studies. Further research is recommended to validate previous studies in construction practices, identify the mechanisms that encourage mutual enhancement of competitiveness at different levels, and how to achieve its sustainability by embracing new management and/or economics techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current recipes for learning across business sectors too often fail to recognize the embedded and contextual nature of management practice. The existing literature gives little emphasis to the symbiotic relationship between supply chain management and the broader dynamics of context. The aerospace and construction sectors are selected for comparison on the basis that they are so different. The UK aerospace sector has undergone extensive consolidation as a result of the imperatives of global competitive pressures. In contrast, the construction industry has experienced decades of fragmentation and remains highly localized. An increasing proportion of output in the aerospace sector occurs within a small number of large, globally orientated firms. In contrast, construction output is dominated by a plethora of small firms with high levels of subcontracting and a widespread reliance on self-employment. These differences have fundamental implications for the way that supply chain management is understood and implemented in the two sectors. Semi-structured interviews with practitioners from both sectors support the contention that supply chain management is more established in aerospace than construction. The introduction of prime contracting and the increasing use of framework agreements within the construction sector potentially provide a much more supportive climate for supply chain management than has traditionally prevailed. However, progress depends upon an improved continuity of workload under such arrangements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – This paper proposes assessing the context within which integrated logistic support (ILS) can be implemented for whole life performance of building services systems. Design/methodology/approach – The use of ILS within a through-life business model (TLBM) is a better framework to achieve a well-designed, constructed and managed product. However, for ILS to be implemented in a TLBM for building services systems, the practices, tools and techniques need certain contextual prerequisites tailored to suit the construction industry. These contextual prerequisites are discussed. Findings – The case studies conducted reinforced the contextual importance of prime contracting, partnering and team collaboration for the application of ILS techniques. The lack of data was a major hindrance to the full realisation of ILS techniques within the case studies. Originality/value – The paper concludes with the recognition of the value of these contextual prerequisites for the use of ILS techniques within the building industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main aim of this study was to ascertain and discuss the current challenges and opportunities facing construction contractors in Ghana. This involved a review of the economic, legal and political environments in which contractors in Ghana operate; a review of published studies on construction in developing countries generally and Ghana specifically; and in-depth interviews and discussions with seven building and civil engineering contractors in Ghana in 2009 and 2010. Six road contractors were also interviewed. The findings indicate significant challenges relating mainly to financing for projects and a harsh business environment. However, most contractors interviewed admitted to significant problems in their own organisations. It is clear that the contracting environment in Ghana is harsh particularly for local contractors who are often not paid on time and without compensation for late payment. However, local construction firms in Ghana who want to breakthrough ought to formulate the right strategic plans, develop innovative business strategies, develop professionalism, and merge with local firms with similar organisational values and characteristics. In short, local or indigenous Ghanaian contractors ought to face up to the reality of competition and the dynamics of modern business in order to survive, grow and become major players in the construction industry in Ghana.