883 resultados para Municipal Solid Waste Management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"SW 897.9."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"This publication (SW 897.8) was prepared by the Office of Solid Waste ... The listing for each Region is in a separate volume."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"SW-869"--Cover.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"ELENR/RR-89/04."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thrust of the argument presented in this chapter is that inter-municipal cooperation (IMC) in the United Kingdom reflects local government's constitutional position and its exposure to the exigencies of Westminster (elected central government) and Whitehall (centre of the professional civil service that services central government). For the most part councils are without general powers of competence and are restricted in what they can do by Parliament. This suggests that the capacity for locally driven IMC is restricted and operates principally within a framework constructed by central government's policy objectives and legislation and the political expediencies of the governing political party. In practice, however, recent examples of IMC demonstrate that the practices are more complex than this initial analysis suggests. Central government may exert top-down pressures and impose hierarchical directives, but there are important countervailing forces. Constitutional changes in Scotland and Wales have shifted the locus of central- local relations away from Westminster and Whitehall. In England, the seeding of English government regional offices in 1994 has evolved into an important structural arrangement that encourages councils to work together. Within the local government community there is now widespread acknowledgement that to achieve the ambitious targets set by central government, councils are, by necessity, bound to cooperate and work with other agencies. In recent years, the fragmentation of public service delivery has affected the scope of IMC. Elected local government in the UK is now only one piece of a complex jigsaw of agencies that provides services to the public; whether it is with non-elected bodies, such as health authorities, public protection authorities (police and fire), voluntary nonprofit organisations or for-profit bodies, councils are expected to cooperate widely with agencies in their localities. Indeed, for projects such as regeneration and community renewal, councils may act as the coordinating agency but the success of such projects is measured by collaboration and partnership working (Davies 2002). To place these developments in context, IMC is an example of how, in spite of the fragmentation of traditional forms of government, councils work with other public service agencies and other councils through the medium of interagency partnerships, collaboration between organisations and a mixed economy of service providers. Such an analysis suggests that, following changes to the system of local government, contemporary forms of IMC are less dependent on vertical arrangements (top-down direction from central government) as they are replaced by horizontal modes (expansion of networks and partnership arrangements). Evidence suggests, however that central government continues to steer local authorities through the agency of inspectorates and regulatory bodies, and through policy initiatives, such as local strategic partnerships and local area agreements (Kelly 2006), thus questioning whether, in the case of UK local government, the shift from hierarchy to network and market solutions is less differentiated and transformation less complete than some literature suggests. Vertical or horizontal pressures may promote IMC, yet similar drivers may deter collaboration between local authorities. An example of negative vertical pressure was central government's change of the systems of local taxation during the 1980s. The new taxation regime replaced a tax on property with a tax on individual residency. Although the community charge lasted only a few years, it was a highpoint of the then Conservative government policy that encouraged councils to compete with each other on the basis of the level of local taxation. In practice, however, the complexity of local government funding in the UK rendered worthless any meaningful ambition of councils competing with each other, especially as central government granting to local authorities is predicated (however imperfectly) on at least notional equalisation between those areas with lower tax yields and the more prosperous locations. Horizontal pressures comprise factors such as planning decisions. Over the last quarter century, councils have competed on the granting of permission to out-of-town retail and leisure complexes, now recognised as detrimental to neighbouring authorities because economic forces prevail and local, independent shops are unable to compete with multiple companies. These examples illustrate tensions at the core of the UK polity of whether IMC is feasible when competition between local authorities heightened by local differences reduces opportunities for collaboration. An alternative perspective on IMC is to explore whether specific purposes or functions promote or restrict it. Whether in the principle areas of local government responsibilities relating to social welfare, development and maintenance of the local infrastructure or environmental matters, there are examples of IMC. But opportunities have diminished considerably as councils lost responsibility for services provision as a result of privatisation and transfer of powers to new government agencies or to central government. Over the last twenty years councils have lost their role in the provision of further-or higher-education, public transport and water/sewage. Councils have commissioning power but only a limited presence in providing housing needs, social care and waste management. In other words, as a result of central government policy, there are, in practice, currently far fewer opportunities for councils to cooperate. Since 1997, the New Labour government has promoted IMC through vertical drivers and the development; the operation of these policy initiatives is discussed following the framework of the editors. Current examples of IMC are notable for being driven by higher tiers of government, working with subordinate authorities in principal-agent relations. Collaboration between local authorities and intra-interand cross-sectoral partnerships are initiated by central government. In other words, IMC is shaped by hierarchical drivers from higher levels of government but, in practice, is locally varied and determined less by formula than by necessity and function. © 2007 Springer.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The uptake in Europe of Energy from Waste (EfW) incinerator plants has increased rapidly in recent years. In the UK, 25 municipal waste incinerators with energy recovery are now in operation; however, their waste supply chains and business practices vary significantly. With over a hundred more plant developments being considered it is important to establish best business practices for ensuring efficient environmental and operational performance. By reviewing the 25 plants we identify four suitable case study plants to compare technologies (moving grate, fluidised bed and rotary kiln), plant economics and operations. Using data collected from annual reports and through interviews and site visits we provide recommendations for improving the supply chain for waste incinerators and highlight the current issues and challenges faced by the industry. We find that plants using moving grate have a high availability of 87-92%. However, compared to the fluidised bed and rotary kiln, quantities of bottom ash and emissions of hydrogen chloride and carbon monoxide are high. The uptake of integrated recycling practices, combined heat and power, and post incineration non-ferrous metal collections needs to be increased among EfW incinerators in the UK. We conclude that one of the major difficulties encountered by waste facilities is the appropriate selection of technology, capacity, site, waste suppliers and heat consumers. This study will be of particular value to EfW plant developers, government authorities and researchers working within the sector of waste management. © 2013 Elsevier Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The uptake in Europe of Energy from Waste (EfW) incinerator plants has increased rapidly in recent years. In the UK, 25 municipal waste incinerators with energy recovery are now in operation; however, their waste supply chains and business practices vary significantly. With over a hundred more plant developments being considered it is important to establish best business practices for ensuring efficient environmental and operational performance. By reviewing the 25 plants we identify four suitable case study plants to compare technologies (moving grate, fluidised bed and rotary kiln), plant economics and operations. Using data collected from annual reports and through interviews and site visits we provide recommendations for improving the supply chain for waste incinerators and highlight the current issues and challenges faced by the industry. We find that plants using moving grate have a high availability of 87-92%. However, compared to the fluidised bed and rotary kiln, quantities of bottom ash and emissions of hydrogen chloride and carbon monoxide are high. The uptake of integrated recycling practices, combined heat and power, and post incineration non-ferrous metal collections needs to be increased among EfW incinerators in the UK. We conclude that one of the major difficulties encountered by waste facilities is the appropriate selection of technology, capacity, site, waste suppliers and heat consumers. This study will be of particular value to EfW plant developers, government authorities and researchers working within the sector of waste management. © 2013 Elsevier Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Due to vigorous globalisation and product proliferation in recent years, more waste has been produced by the soaring manufacturing activities. This has contributed to the significant need for an efficient waste management system to ensure, with all efforts, the waste is properly treated for recycling or disposed. This paper presents a Decision Support System (DSS) framework, based on Constraint Logic Programming (CLP), for the collection management of industrial waste (of all kinds) and discusses the potential employment of Radio-Frequency Identification Technology (RFID) to improve several critical procedures involved in managing waste collection. This paper also demonstrates a widely distributed and semi-structured network of waste producing enterprises (e.g. manufacturers) and waste processing enterprises (i.e. waste recycling/treatment stations) improving their operations planning by means of using the proposed DSS. The potential RFID applications to update and validate information in a continuous manner to bring value-added benefits to the waste collection business are also presented. © 2012 Inderscience Enterprises Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The presented thesis was written in the frame of a project called 'seepage water prognosis'. It was funded by the Federal Ministry for Education and Science (BMBF). 41 German institutions among them research institutes of universities, public authorities and engineering companies were financed for three years respectively. The aim was to work out the scientific basis that is needed to carry out a seepage water prognosis (Oberacker und Eberle, 2002). According to the Federal German Soil Protection Act (Federal Bulletin, 1998) a seepage water prognosis is required in order to avoid future soil impacts from the application of recycling products. The participants focused on the development of either methods to determine the source strength of the materials investigated, which is defined as the total mass flow caused by natural leaching or on models to predict the contaminants transport through the underlying soil. Annual meetings of all participants as well as separate meetings of the two subprojects were held. The department of Geosciences in Bremen participated with two subprojects. The aim of the subproject that resulted in this thesis was the development of easily applicable, valid, and generally accepted laboratory methods for the determination of the source strength. In the scope of the second subproject my colleague Veith Becker developed a computer model for the transport prognosis with the source strength as the main input parameter.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.