880 resultados para Life cycle stages
Resumo:
En el presente proyecto se propone la definición e implementación de un subsistema de monitorización para un sistema de tiempo real distribuido. Este monitor supervisará el estado de todos los componentes software y hardware del sistema original, y permitirá el arranque y parada de cada componente individualmente o del subsistema completo. Constará de dos componentes básicos: un supervisor local para cada subsistema, y un supervisor central con interfaz gráfica. El supervisor local es un componente software asociado a cada subsistema que realizará las funciones de monitorización, arranque/parada de los componentes y envío de informes al supervisor central. Atenderá además a los comandos de arranque y parada provenientes del supervisor central. El supervisor central recibirá los informes de estado de cada uno de los supervisores locales y permitirá el arranque y parada de los subsistemas. Contará con un interfaz gráfico a modo de posición de control. El sistema será desarrollado íntegramente (salvo la posición gráfica) en ADA95, y podrá ejecutarse en cualquiera de las distribuciones Linux más extendidas. En el contexto de Ingeniería de Software, se seguirá un desarrollo en cascada, aportándose los requisitos, el diseño, la codificación y un plan de pruebas. Abstract In this project, the definition and implementation of a monitoring system is proposed for a previously defined real-time distributed system. This supervisory system will monitor the status of each subsystem and its software and hardware components. This new system will also be able to start and stop each individual component and start or stop the entire system. It will consist of two basic components: a local supervisor for each subsystem, and a central supervisor with a graphical unit interface (GUI). The local supervisor will be a software component attached to each original subsystem, which will perform functions such as components monitoring, start and stop the associated subsystem, and sending reports to the central supervisor. It also will attend the start and stop commands from the central supervisor. The central supervisor will receive status reports from each of the local supervisors and will allow starting and stopping the subsystems. It will offer a graphical interface to be used as a main control panel. The system will be developed in ADA 95 (except the graphical position), and should work on any of the most common Linux distributions. In the context of Software Engineering, the project will be developed following a waterfall life cycle. Reports on the stages of requirements, design, coding and testing plan shall be provided.
Resumo:
El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.
Resumo:
Los procesos de diseño y construcción en Arquitectura han mostrado un desarrollo de optimización históricamente muy deficiente cuando se compara con las restantes actividades típicamente industriales. La aspiración constante a una industrialización efectiva, tanto en aras de alcanzar mayores cotas de calidad así como de ahorro de recursos, recibe hoy una oportunidad inmejorable desde el ámbito informático: el Building Information Modelling o BIM. Lo que en un inicio puede parecer meramente un determinado tipo de programa informático, en realidad supone un concepto de “proceso” que subvierte muchas rutinas hoy habituales en el desarrollo de proyectos y construcciones arquitectónicas. La inclusión y desarrollo de datos ligados al proyecto, desde su inicio hasta el fin de su ciclo de vida, conlleva la oportunidad de crear una realidad virtual dinámica y actualizable, que por añadidura posibilita su ensayo y optimización en todos sus aspectos: antes y durante su ejecución, así como vida útil. A ello se suma la oportunidad de transmitir eficientemente los datos completos de proyecto, sin apenas pérdidas o reelaboración, a la cadena de fabricación, lo que facilita el paso a una industrialización verdaderamente significativa en edificación. Ante una llamada mundial a la optimización de recursos y el interés indudable de aumentar beneficios económicos por medio de la reducción del factor de incertidumbre de los procesos, BIM supone un opción de mejora indudable, y así ha sido reconocido a través de la inminente implantación obligatoria por parte de los gobiernos (p. ej. Gran Bretaña en 2016 y España en 2018). La modificación de procesos y roles profesionales que conlleva la incorporación de BIM resulta muy significativa y marcará el ejercicio profesional de los futuros graduados en las disciplinas de Arquitectura, Ingeniería y Construcción (AEC por sus siglas en inglés). La universidad debe responder ágilmente a estas nuevas necesidades incorporando esta metodología en la enseñanza reglada y aportando una visión sinérgica que permita extraer los beneficios formativos subyacentes en el propio marco BIM. En este sentido BIM, al aglutinar el conjunto de datos sobre un único modelo virtual, ofrece un potencial singularmente interesante. La realidad tridimensional del modelo, desarrollada y actualizada continuamente, ofrece al estudiante una gestión radicalmente distinta de la representación gráfica, en la que las vistas parciales de secciones y plantas, tan complejas de asimilar en los inicios de la formación universitaria, resultan en una mera petición a posteriori, para ser extraída según necesidad del modelo virtual. El diseño se realiza siempre sobre el propio modelo único, independientemente de la vista de trabajo elegida en cada momento, permaneciendo los datos y sus relaciones constructivas siempre actualizados y plenamente coherentes. Esta descripción condensada de características de BIM preconfiguran gran parte de las beneficios formativos que ofrecen los procesos BIM, en especial, en referencia al desarrollo del diseño integrado y la gestión de la información (incluyendo TIC). Destacan a su vez las facilidades en comprensión visual de elementos arquitectónicos, sistemas técnicos, sus relaciones intrínsecas así como procesos constructivos. A ello se une el desarrollo experimental que la plataforma BIM ofrece a través de sus software colaborativos: la simulación del comportamiento estructural, energético, económico, entre otros muchos, del modelo virtual en base a los datos inherentes del proyecto. En la presente tesis se describe un estudio de conjunto para explicitar tanto las cualidades como posibles reservas en el uso de procesos BIM, en el marco de una disciplina concreta: la docencia de la Arquitectura. Para ello se ha realizado una revisión bibliográfica general sobre BIM y específica sobre docencia en Arquitectura, así como analizado las experiencias de distintos grupos de interés en el marco concreto de la enseñanza de la en Arquitectura en la Universidad Europea de Madrid. El análisis de beneficios o reservas respecto al uso de BIM se ha enfocado a través de la encuesta a estudiantes y la entrevista a profesionales AEC relacionados o no con BIM. Las conclusiones del estudio permiten sintetizar una implantación de metodología BIM que para mayor claridad y facilidad de comunicación y manejo, se ha volcado en un Marco de Implantación eminentemente gráfico. En él se orienta sobre las acciones docentes para el desarrollo de competencias concretas, valiéndose de la flexibilidad conceptual de los Planes de Estudio en el contexto del Espacio Europeo de Educación Superior (Declaración de Bolonia) para incorporar con naturalidad la nueva herramienta docente al servicio de los objetivos formativo legalmente establecidos. El enfoque global del Marco de Implementación propuesto facilita la planificación de acciones formativas con perspectiva de conjunto: combinar los formatos puntuales o vehiculares BIM, establecer sinergias transversales y armonizar recursos, de modo que la metodología pueda beneficiar tanto la asimilación de conocimientos y habilidades establecidas para el título, como el propio flujo de aprendizaje o learn flow BIM. Del mismo modo reserva, incluso visualmente, aquellas áreas de conocimiento en las que, al menos en la planificación actual, la inclusión de procesos BIM no se considera ventajosa respecto a otras metodologías, o incluso inadecuadas para los objetivos docentes establecidos. Y es esta última categorización la que caracteriza el conjunto de conclusiones de esta investigación, centrada en: 1. la incuestionable necesidad de formar en conceptos y procesos BIM desde etapas muy iniciales de la formación universitaria en Arquitectura, 2. los beneficios formativos adicionales que aporta BIM en el desarrollo de competencias muy diversas contempladas en el currículum académico y 3. la especificidad del rol profesional del arquitecto que exigirá una implantación cuidadosa y ponderada de BIM que respete las metodologías de desarrollo creativo tradicionalmente efectivas, y aporte valor en una reorientación simbiótica con el diseño paramétrico y fabricación digital que permita un diseño finalmente generativo. ABSTRACT The traditional architectural design and construction procedures have proven to be deficient where process optimization is concerned, particularly when compared to other common industrial activities. The ever‐growing strife to achieve effective industrialization, both in favor of reaching greater quality levels as well as sustainable management of resources, has a better chance today than ever through a mean out of the realm of information technology, the Building Information Modelling o BIM. What may initially seem to be merely another computer program, in reality turns out to be a “process” concept that subverts many of today’s routines in architectural design and construction. Including and working with project data from the very beginning to the end of its full life cycle allows for creating a dynamic and updatable virtual reality, enabling data testing and optimizing throughout: before and during execution, all the way to the end of its lifespan. In addition, there is an opportunity to transmit complete project data efficiently, with hardly any loss or redeveloping of the manufacture chain required, which facilitates attaining a truly significant industrialization within the construction industry. In the presence of a world‐wide call for optimizing resources, along with an undeniable interest in increasing economic benefits through reducing uncertainty factors in its processes, BIM undoubtedly offers a chance for improvement as acknowledged by its imminent and mandatory implementation on the part of governments (for example United Kingdom in 2016 and Spain in 2018). The changes involved in professional roles and procedures upon incorporating BIM are highly significant and will set the course for future graduates of Architecture, Engineering and Construction disciplines (AEC) within their professions. Higher Education must respond to such needs with swiftness by incorporating this methodology into their educational standards and providing a synergetic vision that focuses on the underlying educational benefits inherent in the BIM framework. In this respect, BIM, in gathering data set under one single virtual model, offers a uniquely interesting potential. The three‐dimensional reality of the model, under continuous development and updating, provides students with a radically different graphic environment, in which partial views of elevation, section or plan that tend characteristically to be difficult to assimilate at the beginning of their studies, become mere post hoc requests to be ordered when needed directly out the virtual model. The design is always carried out on the sole model itself, independently of the working view chosen at any particular moment, with all data and data relations within construction permanently updated and fully coherent. This condensed description of the features of BIM begin to shape an important part of the educational benefits posed by BIM processes, particularly in reference to integrated design development and information management (including ITC). At the same time, it highlights the ease with which visual understanding is achieved regarding architectural elements, technology systems, their intrinsic relationships, and construction processes. In addition to this, there is the experimental development the BIM platform grants through its collaborative software: simulation of structural, energetic, and economic behavior, among others, of the virtual model according to the data inherent to the project. This doctoral dissertation presents a broad study including a wide array of research methods and issues in order to specify both the virtues and possible reservations in the use of BIM processes within the framework of a specific discipline: teaching Architecture. To do so, a literature review on BIM has been carried out, specifically concerning teaching in the discipline of Architecture, as well as an analysis of the experience of different groups of interest delimited to Universidad Europea de Madrid. The analysis of the benefits and/or limitations of using BIM has been approached through student surveys and interviews with professionals from the AEC sector, associated or not, with BIM. Various diverse educational experiences are described and academic management for experimental implementation has been analyzed. The conclusions of this study offer a synthesis for a Framework of Implementation of BIM methodology, which in order to reach greater clarity, communication ease and user‐friendliness, have been posed in an eminently graphic manner. The proposed framework proffers guidance on teaching methods conducive to the development of specific skills, taking advantage of the conceptual flexibility of the European Higher Education Area guidelines based on competencies, which naturally facilitate for the incorporation of this new teaching tool to achieve the educational objectives established by law. The global approach of the Implementation Framework put forth in this study facilitates the planning of educational actions within a common perspective: combining exceptional or vehicular BIM formats, establishing cross‐disciplinary synergies, and sharing resources, so as to purport a methodology that contributes to the assimilation of knowledge and pre‐defined competencies within the degree program, and to the flow of learning itself. At the same time, it reserves, even visually, those areas of knowledge in which the use of BIM processes is not considered necessarily an advantage over other methodologies, or even inadequate for the learning outcomes established, at least where current planning is concerned. It is this last category which characterizes the research conclusions as a whole, centering on: 1. The unquestionable need for teaching BIM concepts and processes in Architecture very early on, in the initial stages of higher education; 2. The additional educational benefits that BIM offers in a varied array of competency development within the academic curriculum; and 3. The specific nature of the professional role of the Architect, which demands a careful and balanced implementation of BIM that respects the traditional teaching methodologies that have proven effective and creative, and adds value by a symbiotic reorientation merged with parametric design and digital manufacturing so to enable for a finally generative design.
Resumo:
Este proyecto trata el desarrollo de un weblog sobre tecnología e internet siguiendo la Metodología de December, abordando todas sus etapas e incorporando otros aspectos a la metodología que han enriquecido el proyecto hasta su resultado final. Se pretende realizar una aplicación web con la funcionalidad de un weblog centrándose tanto en la parte del usuario final como del administrador de la web. Que este weblog sirva para compartir conocimientos de forma dinámica actualizándose con frecuencia y para usuarios con inquietudes tecnologías y con mayor o menor nivel de conocimientos. Se pone especial interés en la usabilidad de la herramienta y es tenida en cuenta a lo largo de todo el ciclo de vida de la metodología. Como punto de partida para estructurar la aplicación se toma como metodología de desarrollo la metodología December enfocada al desarrollo web y como a partir de ella se da forma a lo que hoy es el proyecto completo. Se tienen en cuenta cada una de sus etapas en las cuales se va avanzando para ir completando cada pieza del desarrollo final. Se intenta también en esta memoria abordar datos más técnicos de la herramienta, desde la elección de los lenguajes utilizados hasta el diseño de la estructura de base de datos, los procesos que intervienen en la aplicación y las decisiones más subjetivas de diseño de la interface web. En todo momento se ha intentado estructurar la memoria de tal forma que resultará clara y concisa, fácil de leer. Plasmando en ella todo el proceso de realización del proyecto. ABSTRACT This project involves the development of a technology and internet weblog following the December’s Methodology, covering all stages and adding other aspects to this methodology that have enriched the project to its final result. I plan to develop a web application with the functionality of a weblog focusing on both, the end user and the webmaster. A weblog to share knowledge in a dynamic and updated way, for users concerned with technologies and different levels of expertise. Special emphasis has been made on the usability of the web tool, taking this aspect into account through the entire methodology’s life cycle. To begin the development, the application structure is based on December’s methodology focused on web development. The whole project is built from this methodology. All the stages have been taken into account to complete each part of the final development. This project deals with technical data of the web tool, from the choice of the programming languages used to the design of the database structure, the processes involved in the application and the subjective decisions of interface design. At all times I have tried to structure the report in a clear, concise and easy to read way, reflecting it in the whole process of the project.
Resumo:
As várias teorias acerca da estrutura de capital despertam interesse motivando diversos estudos sobre o assunto sem, no entanto, ter um consenso. Outro tema aparentemente pouco explorado refere-se ao ciclo de vida das empresas e como ele pode influenciar a estrutura de capital. Este estudo teve como objetivo verificar quais determinantes possuem maior relevância no endividamento das empresas e se estes determinantes alteram-se dependendo do ciclo de vida da empresa apoiada pelas teorias Trade Off, Pecking Order e Teoria da Agência. Para alcançar o objetivo deste trabalho foi utilizado análise em painel de efeito fixo sendo a amostra composta por empresas brasileiras de capital aberto, com dados secundários disponíveis na Economática® no período de 2005 a 2013, utilizando-se os setores da BM&FBOVESPA. Como resultado principal destaca-se o mesmo comportamento entre a amostra geral, alto e baixo crescimento pelo endividamento contábil para o determinante Lucratividade apresentando uma relação negativa, e para os determinantes Oportunidade de Crescimento e Tamanho, estes com uma relação positiva. Para os grupos de alto e baixo crescimento alguns determinantes apresentaram resultados diferentes, como a singularidade que resultou significância nestes dois grupos, sendo positiva no baixo crescimento e negativa no alto crescimento, para o valor colateral dos ativos e benefício fiscal não dívida apresentaram significância apenas no grupo de baixo crescimento. Para o endividamento a valor de mercado foi observado significância para o Benefício fiscal não dívida e Singularidade. Este resultado reforça o argumento de que o ciclo de vida influência a estrutura de capital.
Resumo:
Few experiments have demonstrated a genetic correlation between the process of sexual selection and fitness benefits in offspring, either through female choice or male competition. Those that have looked at the relationship between female choice and offspring fitness have focused on juvenile fitness components, rather than fitness at later stages in the life cycle. In addition, many of these studies have not controlled for possible maternal effects. To test for a relationship between sexual selection and adult fitness, we carried out an artificial selection experiment in the fruit fly, Drosophila melanogaster. We created two treatments that varied in the level of opportunity for sexual selection. Increased opportunity for female choice and male competition was genetically correlated with an increase in adult survivorship, as well as an increase in male and female body size. Contrary to previous, single-generation studies, we did not find an increase in larval competitive ability. This study demonstrates that mate choice and/or male–male competition are correlated with an increase in at least one adult fitness component of offspring.
Resumo:
We report here the development of a regulated gene expression system for Dictyostelium discoideum based on the DNA-damage inducibility of the rnrB gene. rnrB, which codes for the small subunit of the enzyme ribonucleotide reductase, responds to DNA-damaging agents at all stages of the D.discoideum life cycle. Doses that have little effect on development have previously been shown to increase the level of the rnrB transcript by up to 15-fold. Here we show that all elements necessary for DNA-damage induction are contained in a 450 bp promoter fragment. We used a fusion of the rnrB promoter with the gene encoding GFP to demonstrate an up to 10-fold induction at the RNA level, which appears in all aspects similar to induction of the endogenous rnrB transcript. Using a fusion with the lacZ gene we observed an up to 7-fold induction at the protein level. These results indicate that the rnrB promoter can be used to regulate the expression of specific genes in D.discoideum. This controllable gene expression system provides the following new characteristics: the induction is rapid, taking place in the order of minutes, and the promoter is responsive at all stages of the D.discoideum life cycle.
Resumo:
Adult Schistosoma mansoni blood flukes reside in the mesenteric veins of their vertebrate hosts, where they absorb immense quantities of glucose through their tegument by facilitated diffusion. Previously, we obtained S. mansoni cDNAs encoding facilitated-diffusion schistosome glucose transporter proteins 1 and 4 (SGTP1 and SGTP4) and localized SGTP1 to the basal membranes of the tegument and the underlying muscle. In this study, we characterize the expression and localization of SGTP4 during the schistosome life cycle. Antibodies specific to SGTP4 appear to stain only the double-bilayer, apical membranes of the adult parasite tegument, revealing an asymmetric distribution relative to the basal transporter SGTP1. On living worms, SGTP4 is available to surface biotinylation, suggesting that it is exposed at the hose-parasite interface. SGTP4 is detected shortly after the transformation of free-living, infectious cercariae into schistosomula and coincides with the appearance of the double membrane. Within 15 min after transformation, anti-SGTP4 staining produces a bright, patchy distribution at the surface of schistosomula, which becomes contiguous over the entire surface of the schistosomula by 24 hr after transformation. SGTP4 is not detected in earlier developmental stages (eggs, sporocysts, and cercariae) that do not possess the specialized double membrane. Thus, SGTP4 appears to be expressed only in the mammalian stages of the parasite's life cycle and specifically localized within the host-interactive, apical membranes of the tegument.
Resumo:
O crescimento de uma empresa pode ser apoiado com recursos de terceiros provenientes do mercado de crédito ou do mercado de capitais. Credores ou potenciais investidores disponibilizam recursos a partir de um processo de avaliação de indicadores de performance. Para as PMEs que consideram o crescimento, conhecer como os indicadores relevantes se comportam ao longo de um ciclo de crescimento é uma questão estratégica. Fatores como tamanho, lucratividade, oportunidades de crescimento, composição de ativos das empresas, risco inerente aos resultados, têm sido vinculados a determinantes de uma estrutura de capital. Assim sendo, este trabalho busca verificar quais indicadores podem nortear o desempenho empresarial de PMEs ao longo de um ciclo de crescimento. Como contribuição original, este trabalho apresenta um painel com indicadores em diferentes estágios de crescimento que resultam na geração de valor para os proprietários e potenciais investidores do mercado de capitais. A amostra inicial é composta por 1.610 empresas para o período de 2010 a 2014. Entretanto, considerando a disponibilidade de informações, a amostra final é composta por 28 empresas de porte médio/grande, 387 empresas grandes e 138 empresas listadas na BM&FBOVESPA, totalizando 553 empresas. A metodologia adotada envolve a classificação de porte de empresa do BNDES como critério para definir ciclo de crescimento, e testes de estatística descritiva, análise fatorial, análise de correlação, regressão múltipla linear e montagem de painel. Como resultado, verificou-se que as variáveis tamanho, composição de ativos e lucratividade são fatores que explicam o endividamento de curto prazo para o estágio médias/grandes empresas. Ainda, que esses fatores explicam o endividamento de longo prazo para os estágios grandes e empresas listadas na BM&FBOVESPA. Tais resultados estão de acordo com estudos prévios, mas as variáveis relacionadas a volatilidade e crescimento não foram significantes nos modelos para os estágios de empresas. O painel montado a partir das variáveis de composição de ativos e lucratividade indicou que endividamento de curto prazo, endividamento de longo prazo, receita líquida, retorno sobre o patrimônio líquido e lucros antes de juros, impostos, depreciação e amortização (EBITDA) sinalizam empresas, em cada estágio de ciclo de crescimento do estudo, que buscam o crescimento com rentabilidade acima da média e atendem a critérios valorizados pelo investidor do mercado de capitais. Estes indicadores podem sinalizar o desempenho empresarial de PMEs ao longo de um ciclo de crescimento
Resumo:
Atualmente, os edifícios, em função dos avanços tecnológicos dos sistemas prediais, necessitam de maior planejamento, detalhamento de projetos, controles de execução e treinamento dos profissionais de operação e manutenção para atender os requisitos de projeto do proprietário, que têm como premissa os conceitos de sustentabilidade, qualidade e desempenho. A presença dos sofisticados sistemas de controle contribui para facilitar o gerenciamento de insumos como água e energia, porém pequenas falhas podem levar a grandes falhas de desempenho. As falhas na concepção dos edifícios têm início com a má interpretação, por parte da equipe técnica, dos requisitos dos proprietários. Assim, é necessário que na concepção do edifício sejam verificados todos os requisitos solicitados pelos proprietários para o edifício durante o seu ciclo de vida. A falha da comunicação percorre toda a cadeia produtiva do edifício gerando falhas de planejamento, projeto, execução e manutenção. O comissionamento é um processo para atender aos requisitos de projeto do proprietário, documentar as fases do ciclo de vida dos edifícios, capacitar os profissionais de operação e manutenção, com o objetivo de evitar as falhas, diminuir desperdícios e retrabalhos, melhorar a qualidade, o desempenho e a sustentabilidade dos edifícios. O comissionamento é mais difundido em sistemas prediais de ar condicionado e de iluminação tendo como meta a alta eficiência energética e a economia de água, sendo pouco utilizado no Brasil. Neste contexto, o objetivo desta pesquisa é propor um modelo conceitual de comissionamento para sistemas prediais. A metodologia adotada para o desenvolvimento do modelo, utiliza a pesquisa bibliográfica como procedimento técnico. Para elucidar em que fase o comissionamento é aplicado, este foi relacionado com os outros conceitos utilizados no ciclo de vida do edifício como a coordenação de projeto, o gerenciamento de execução, o gerenciamento de facilidades, a qualidade, o desempenho, a sustentabilidade. Para o desenvolvimento do modelo conceitual é apresentado um fluxo das fases do ciclo de vida e respectivas etapas do comissionamento e outro fluxo com a relação de documentos gerados em cada fase. O resultado, ou seja, o modelo conceitual dá as diretrizes para o desenvolvimento de um comissionamento por meio da descrição das atividades, das competências e dos produtos gerados em cada etapa do comissionamento, conforme as fases do ciclo do edifício. Este trabalho contribui para difundir o comissionamento e embasar a sua aplicação em edifícios.
Resumo:
A hipótese de \"manipulação comportamental\" supõe que um parasito pode alterar o comportamento de seu hospedeiro visando aumentar a probabilidade de completar seu ciclo evolutivo. Tais alterações aumentariam a taxa de transmissão hospedeirohospedeiro, assegurando ao parasito ou a seus propágulos o encontro de novo hospedeiro. A possibilidade de infecções parasitárias provocarem mudanças comportamentais em seus hospedeiros e a elevada frequência com que o acometimento de seres humanos por larvas de Toxocara e cistos de Toxoplasma ocorre, têm chamado à atenção de pesquisadores interessados no estudo das relações hospedeiro-parasita. Na infecção por Toxoplasma gondii e Toxocara canis, cistos e larvas estão presentes em diversos locais anatômicos incluindo musculatura, coração, pulmões, olhos e cérebro. A presença de parasitos no cérebro dá oportunidade de manipulação do comportamento do hospedeiro. Entretanto, não se sabe qual ou quais mecanismos estão envolvidos no processo de manipulação do comportamento. Os objetivos do presente estudo foram verificar alterações na ansiedade, medo, memória e aprendizagem de Rattus norvegicus experimentalmente infectados por Toxocara canis e/ou Toxoplasma gondii em dois períodos após infecção, bem como a localização das larvas e cistos e presença de placas beta amiloide ( A) na região do hipocampo no tecido cerebral desses roedores corado pela técnica de Hematoxilina e Eosina (HE), e Vermelho de Congo, respectivamente. Foram utilizadas 40 exemplares fêmeas da espécie Rattus norvegicus, com seis a oito semanas. Os animais foram divididos em quatro grupos: Toxocara - 10 ratos infectados com 300 ovos de Toxocara canis, Toxoplasma -10 ratos infectados com 10 cistos de Toxoplasma gondii, Infecção dupla - 10 ratos infectados com 300 ovos de Toxocara canis e 10 cistos de Toxoplasma gondii, e controle - 10 ratos sem infecção. Nos dias 40, 41, 70 e 71 após a infecção, os animais dos grupos infectados e controle foram submetidos à avaliação no Labirinto em Cruz Elevado e Campo aberto. Aos 120 após infecção foi feita avaliação da memória, aprendizado e aversão a urina de gato dos animais no Labirinto de Barnes. No final das análises comportamentais os animais foram levados a eutanásia para retirada do cérebro e confecção dos cortes histológicos preparados em HE e Vermelho de Congo. Os resultados mostraram efeito ansiolítico para ambas as infecções, principalmente para Toxoplasma gondii. Não houve comprometimento da memória e aprendizado no LB, porém os animais infectados por Toxocara canis ou Toxoplasma gondii apresentaram menor tempo para encontrar a toca com urina e entrar nela. A leitura dos cortes histológicos corados com HE mostraram larvas de Toxocara canis e cistos de Toxoplasma gondii em regiões do sistema nervoso central dos animais relacionadas com memória e aprendizado. As lâminas coradas com Vermelho de Congo apresentaram placas beta amiloides ( A) em metade dos animais infectados por Toxoplasma gondii. Conclui-se que a infecção por ambos os parasitos apresenta efeito ansiolítico quando ocorre infecção única. Quando a Infecção ocorre concomitantemente há modulação no comportamento. Além disso, ratas infectadas com infecção única apresentam-se menos aversivas à urina de gatos.
Resumo:
A obtenção de etanol a partir de rotas alcoolquímicas consagradas gera resíduos com potencial de aproveitamento, tanto em outros setores produtivos como no ciclo produtivo do próprio combustível. Este é o caso de torta de filtro e vinhaça. A vinhaça em particular costuma ser devolvida ao campo com o intuito de ajustar teores nutricionais do solo no cultivo da cana. No entanto, estudos ambientais destacam que esta alternativa traz efeitos negativos sobre os meios receptores (água e solo), condição que abre a perspectiva para exploração de usos alternativos dessas substâncias. Este estudo se propôs a contribuir para o tema ao avaliar de forma sistêmica o desempenho ambiental de duas alternativas de reaproveitamento de vinhaça: (i) reuso no campo em processos de fertirrigação, alternativa consolidada no Brasil, e (ii) reuso da fração líquida da vinhaça em etapas diversas do processo industrial de obtenção de etanol. Em qualquer das situações fez-se uso da técnica de Avaliação de Ciclo de Vida - ACV para proceder tal verificação. A análise ambiental da prática de reuso de vinhaça e torta para fertirrigação foi conduzida a partir da comparação de cenários que consideraram a forma de suprimento de nutrientes para a cana e o método de colheita. A avaliação de impactos ocorreu em dois níveis: quanto ao consumo de recursos, a partir de Primary Energy Demand (PED); e em termos de emissões para o ambiente por meio da elaboração do Perfil Ambiental. Uma Análise de Sensibilidade foi também realizada para verificar o efeito de oscilações dos teores de Nitrogênio (N), Fósforo (P) e Potássio (K) na composição da vinhaça sobre os resultados obtidos, caso da primeira alternativa. Concluiu-se para esse caso que a substituição parcial de fertilizantes químicos por vinhaça traz aumento da Demanda de Energia Primária global para ambos os métodos de colheita. Em termos de Perfil Ambiental, a comparação entre cenários das mesmas práticas de manejo mostrou que a troca de adubos por vinhaça e torta é positiva para o desempenho ambiental do etanol por reduzir impactos quanto a Mudanças Climáticas (CC), Acidificação Terrestre (TA) e Toxicidade Humana (HT). Por outro lado, o tratamento de vinhaça para reposição de água na etapa industrial resultou em aumento global das contribuições para as categorias acima mencionadas além de incrementos para Eutrofização de água doce (FEut) e Ecotoxicidade de água doce (FEC), a despeito de ser constatada a redução de 45% quanto a Depleção de água (WD). Os aumentos no impacto se deveram principalmente aos efeitos negativos causados durante a produção do CaO usado no processo de tratamento da vinhaça. No entanto, a substituição deste insumo por NaOH só representou melhora em termos de CC. Pode-se concluir que a reutilização de vinhaça e de torta de filtro como complemento nutricional para o cultivo de cana-de-açúcar resultou em uma alternativa mais adequada de reaproveitamento do que o se este fluído fosse reutilizado para suprir parte da demanda hídrica de processo, mesmo quando o consumo de água na etapa industrial tenha inexoravelmente se reduzido a partir da implantação dessa medida.
Resumo:
El turismo residencial en Valle de Bravo (Estado de México) surge a partir de la consolidación de su presa, iniciando un proceso de transformación no sólo paisajística, sino territorial y socioeconómica, el cual además, ha marcado la pauta para llevar a este destino a convertirse en uno de los sitios turísticos más importantes del Estado de México. El presente artículo tiene como objetivo realizar una caracterización territorial y urbana de las etapas que ha tenido Valle de Bravo debido a la proliferación de residencias desde sus inicios como sitio turístico hasta la época actual, analizando su posible tendencia de crecimiento para los próximos años. Para poder realizar este análisis, se utilizó el modelo del Ciclo de Vida Turístico en el que diversas variables cuantitativas y cualitativas fueron utilizadas para ejemplificar cómo ha ido evolucionando Valle de Bravo. A través de éste análisis se demuestra que la zona está acercándose a límites de capacidad de carga, lo cual supone un mayor impacto en la zona principalmente en sus recursos más importantes: el espacio físico y, su alto valor paisajístico y natural.
Resumo:
The emergence of widespread offshoring of information-intensive services is arguably one of the more impactful phenomena to transform business in the last ten years. A growing body of research has examined the firm-level drivers andlocation factors (i.e., the why's and where's) of services offshoring. However, little empirical research has examined the maturation sequencing (or when's) of services offshoring. Adopting industry life cycle theory as a framework, the key research questions examined in the paper are: when do different categories of offshoring services provision change from being emergent sectors to more mature ones, and how does the timing of this sequence relate to the type of service offshored. Using a database of 1420 offshore services FDI projects, we find that the value-add as well as the information sensitivity of the service category are related to when the service categories progress through the industry life cycle. Implications for future waves of service offshoring are discussed.
Resumo:
Apicomplexan parasites of the genera Theileria and Plasmodium have complicated life cycles including infection of a vertebrate intermediate host and an arthropod definitive host. As the Plasmodium parasite progresses through its life cycle, it enters a number of different cell types, both in its mammalian and mosquito hosts. The fate of these cells varies greatly, as do the parasite and host molecules involved in parasite-host interactions. In mammals, Plasmodium parasites infect hepatocytes and erythrocytes whereas Theileria infects ruminant leukocytes and erythrocytes. Survival of Plasmodium-infected hepatocytes and Theileria-infected leukocytes depends on parasite-mediated inhibition of host cell apoptosis but only Theileria-infected cells exhibit a fully transformed phenotype. As the development of both parasites progresses towards the merozoite stage, the parasites no longer promote the survival of the host cell and the infected cell is finally destroyed to release merozoites. In this review we describe similarities and differences of parasite-host cell interactions in Plasmodium-infected hepatocytes and Theileria-infected leukocytes and compare the observed phenotypes to other parasite stages interacting with host cells.