854 resultados para Financial risk
Resumo:
The safety risk management process describes the systematic application of management policies, procedures and practices to the activities of communicating, consulting, establishing the context, and identifying, analysing, evaluating, treating, monitoring and reviewing risk. This process is undertaken to provide assurances that the risks of a particular unmanned aircraft system activity have been managed to an acceptable level. The safety risk management process and its outcomes form part of the documented safety case necessary to obtain approvals for unmanned aircraft system operations. It also guides the development of an organisation’s operations manual and is a primary component of an organisation’s safety management system. The aim of this chapter is to provide existing risk practitioners with a high level introduction to some of the unique issues and challenges in the application of the safety risk management process to unmanned aircraft systems. The scope is limited to safety risks associated with the operation of unmanned aircraft in the civil airspace system and over inhabited areas. The structure of the chapter is based on the safety risk management process as defined by the international risk management standard ISO 31000:2009 and draws on aviation safety resources provided by International Civil Aviation Organization, the Federal Aviation Administration and U.S. Department of Defense. References to relevant aviation safety regulations, programs of research and fielded systems are also provided.
Resumo:
Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). As background to this challenge, a brief review is given of current practice in the selection of major public sector infrastructure in Australia, along with a review of the related literature concerning the Multi-Attribute Utility Approach (MAUA) and the effect of MAUA on the role of risk management in procurement selection. To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision making model is mentioned. A brief summary is also given of the research method and hypothesis used to test and develop the new procurement model and which uses competition as the dependent variable and as a proxy for VfM. The hypothesis is given as follows: When the actual procurement mode matches the theoretical/predicted procurement mode (informed by the new procurement model), then actual competition is expected to match optimum competition (based on actual prevailing capacity vis-à-vis the theoretical/predicted procurement mode) and subject to efficient tendering. The aim of this paper is to report on progress towards testing this hypothesis in terms of an analysis of two of the four data components in the hypothesis. That is, actual procurement and actual competition across 87 road and health major public sector projects in Australia. In conclusion, it is noted that the Global Financial Crisis (GFC) has seen a significant increase in competition in public sector major road and health infrastructure and if any imperfections in procurement and/or tendering are discernible, then this would create the opportunity, through the deployment of economic principles embedded in the new procurement model and/or adjustments in tendering, to maintain some of this higher level post-GFC competition throughout the next business cycle/upturn in demand including private sector demand. Finally, the paper previews the next steps in the research with regard to collection and analysis of data concerning theoretical/predicted procurement and optimum competition.
Resumo:
Not for profit organisations face significant challenges in managing organisational risk. In this regard not-for-profits are not unique but they are distinguishable from their 'for-profit' counterparts in that they are less likely to have the resources to find sufficient risk management strategies and plans, are very vunerable to cyclical changes in the insurance market and are not usually in a position to pass on the costs of increased premiums to third parties such as consumers of their services. This article explores the nature and extent of risks faced by the not-for-profit sector; the appropriateness and scope of risk management to reduce and manage the likelihood and incidence of risk; and the types of insurance and options to cover risks that materialise. It concludes with a recommendation for a potential course of action.
Resumo:
Airports worldwide represent key forms of critical infrastructure in addition to serving as nodes in the international aviation network. While the continued operation of airports is critical to the functioning of reliable air passenger and freight transportation, these infrastructure systems face a number of sources of disturbance that threaten their operational viability. Recent examples of high magnitude events include the eruption of Iceland’s Eyjafjallajokull volcano eruption (Folattau and Schofield 2010), the failure of multiple systems at the opening of Heathrow’s Terminal 5 (Brady and Davies 2010) and the Glasgow airport 2007 terrorist attack (Crichton 2008). While these newsworthy events do occur, a multitude of lower-level more common disturbances also have the potential to cause significant discontinuity to airport operations. Regional airports face a unique set of challenges, particularly in a nation like Australia where they serve to link otherwise remote and isolated communities to metropolitan hubs (Wheeler 2005), often without the resources and political attention received by larger capital city airports. This paper discusses conceptual relationships between Business Continuity Management (BCM) and High Reliability Theory, and proposes BCM as an appropriate risk-based management process to ensure continued airport operation in the face of uncertainty. In addition, it argues that that correctly implemented BCM can lead to highly reliable organisations. This is framed within the broader context of critical infrastructures and the need for adequate crisis management approaches suited to their unique requirements (Boin and McConnell 2007).
Resumo:
Obesity is a major public health problem in both developed and developing countries. The body mass index (BMI) is the most common index used to define obesity. The universal application of the same BMI classification across different ethnic groups is being challenged due to the inability of the index to differentiate fat mass (FM) and fat�]free mass (FFM) and the recognized ethnic differences in body composition. A better understanding of the body composition of Asian children from different backgrounds would help to better understand the obesity�]related health risks of people in this region. Moreover, the limitations of the BMI underscore the necessity to use where possible, more accurate measures of body fat assessment in research and clinical settings in addition to BMI, particularly in relation to the monitoring of prevention and treatment efforts. The aim of the first study was to determine the ethnic difference in the relationship between BMI and percent body fat (%BF) in pre�]pubertal Asian children from China, Lebanon, Malaysia, the Philippines, and Thailand. A total of 1039 children aged 8�]10 y were recruited using a non�]random purposive sampling approach aiming to encompass a wide BMI range from the five countries. Percent body fat (%BF) was determined using the deuterium dilution technique to quantify total body water (TBW) and subsequently derive proportions of FM and FFM. The study highlighted the sex and ethnic differences between BMI and %BF in Asian children from different countries. Girls had approximately 4.0% higher %BF compared with boys at a given BMI. Filipino boys tended to have a lower %BF than their Chinese, Lebanese, Malay and Thai counterparts at the same age and BMI level (corrected mean %BF was 25.7�}0.8%, 27.4�}0.4%, 27.1�}0.6%, 27.7�}0.5%, 28.1�}0.5% for Filipino, Chinese, Lebanese, Malay and Thai boys, respectively), although they differed significantly from Thai and Malay boys. Thai girls had approximately 2.0% higher %BF values than Chinese, Lebanese, Filipino and Malay counterparts (however no significant difference was seen among the four ethnic groups) at a given BMI (corrected mean %BF was 31.1�}0.5%, 28.6�}0.4%, 29.2�}0.6%, 29.5�}0.6%, 29.5�}0.5% for Thai, Chinese, Lebanese, Malay and Filipino girls, respectively). However, the ethnic difference in BMI�]%BF relationship varied by BMI. Compared with Caucasians, Asian children had a BMI 3�]6 units lower for a given %BF. More than one third of obese Asian children in the study were not identified using the WHO classification and more than half were not identified using the International Obesity Task Force (IOTF) classification. However, use of the Chinese classification increased the sensitivity by 19.7%, 18.1%, 2.3%, 2.3%, and 11.3% for Chinese, Lebanese, Malay, Filipino and Thai girls, respectively. A further aim of the first study was to determine the ethnic difference in body fat distribution in pre�]pubertal Asian children from China, Lebanon, Malaysia, and Thailand. The skin fold thicknesses, height, weight, waist circumference (WC) and total adiposity (as determined by deuterium dilution technique) of 922 children from the four countries was assessed. Chinese boys and girls had a similar trunk�]to�]extremity skin fold thickness ratio to Thai counterparts and both groups had higher ratios than the Malays and Lebanese at a given total FM. At a given BMI, both Chinese and Thai boys and girls had a higher WC than Malays and Lebanese (corrected mean WC was 68.1�}0.2 cm, 67.8�}0.3 cm, 65.8�}0.4 cm, 64.1�}0.3 cm for Chinese, Thai, Lebanese and Malay boys, respectively; 64.2�}0.2 cm, 65.0�}0.3 cm, 62.9�}0.4 cm, 60.6�}0.3 cm for Chinese, Thai, Lebanese and Malay girls, respectively). Chinese boys and girls had lower trunk fat adjusted subscapular/suprailiac skinfold ratio compared with Lebanese and Malay counterparts. The second study aimed to develop and cross�]validate bioelectrical impedance analysis (BIA) prediction equations of TBW and FFM for Asian pre�]pubertal children from China, Lebanon, Malaysia, the Philippines, and Thailand. Data on height, weight, age, gender, resistance and reactance measured by BIA were collected from 948 Asian children (492 boys and 456 girls) aged 8�]10 y from the five countries. The deuterium dilution technique was used as the criterion method for the estimation of TBW and FFM. The BIA equations were developed from the validation group (630 children randomly selected from the total sample) using stepwise multiple regression analysis and cross�]validated in a separate group (318 children) using the Bland�]Altman approach. Age, gender and ethnicity influenced the relationship between the resistance index (RI = height2/resistance), TBW and FFM. The BIA prediction equation for the estimation of TBW was: TBW (kg) = 0.231�~Height2 (cm)/resistance (ƒ¶) + 0.066�~Height (cm) + 0.188�~Weight (kg) + 0.128�~Age (yr) + 0.500�~Sex (male=1, female=0) . 0.316�~Ethnicity (Thai ethnicity=1, others=0) �] 4.574, and for the estimation of FFM: FFM (kg) = 0.299�~Height2 (cm)/resistance (ƒ¶) + 0.086�~Height (cm) + 0.245�~Weight (kg) + 0.260�~Age (yr) + 0.901�~Sex (male=1, female=0) �] 0.415�~Ethnicity (Thai ethnicity=1, others=0) �] 6.952. The R2 was 88.0% (root mean square error, RSME = 1.3 kg), 88.3% (RSME = 1.7 kg) for TBW and FFM equation, respectively. No significant difference between measured and predicted TBW and between measured and predicted FFM for the whole cross�]validation sample was found (bias = �]0.1�}1.4 kg, pure error = 1.4�}2.0 kg for TBW and bias = �]0.2�}1.9 kg, pure error = 1.8�}2.6 kg for FFM). However, the prediction equation for estimation of TBW/FFM tended to overestimate TBW/FFM at lower levels while underestimate at higher levels of TBW/FFM. Accuracy of the general equation for TBW and FFM compared favorably with both BMI�]specific and ethnic�]specific equations. There were significant differences between predicted TBW and FFM from external BIA equations derived from Caucasian populations and measured values in Asian children. There were three specific aims of the third study. The first was to explore the relationship between obesity and metabolic syndrome and abnormalities in Chinese children. A total of 608 boys and 800 girls aged 6�]12 y were recruited from four cities in China. Three definitions of pediatric metabolic syndrome and abnormalities were used, including the International Diabetes Federation (IDF) and National Cholesterol Education Program (NCEP) definition for adults modified by Cook et al. and de Ferranti et al. The prevalence of metabolic syndrome varied with different definitions, was highest using the de Ferranti definition (5.4%, 24.6% and 42.0%, respectively for normal�]weight, overweight and obese children), followed by the Cook definition (1.5%, 8.1%, and 25.1%, respectively), and the IDF definition (0.5%, 1.8% and 8.3%, respectively). Overweight and obese children had a higher risk of developing the metabolic syndrome compared to normal�]weight children (odds ratio varied with different definitions from 3.958 to 6.866 for overweight children, and 12.640�]26.007 for obese children). Overweight and obesity also increased the risk of developing metabolic abnormalities. Central obesity and high triglycerides (TG) were the most common while hyperglycemia was the least frequent in Chinese children regardless of different definitions. The second purpose was to determine the best obesity index for the prediction of cardiovascular (CV) risk factor clustering across a 2�]y follow�]up among BMI, %BF, WC and waist�]to�]height ratio (WHtR) in Chinese children. Height, weight, WC, %BF as determined by BIA, blood pressure, TG, high�]density lipoprotein cholesterol (HDL�]C), and fasting glucose were collected at baseline and 2 years later in 292 boys and 277 girls aged 8�]10 y. The results showed the percentage of children who remained overweight/obese defined on the basis of BMI, WC, WHtR and %BF was 89.7%, 93.5%, 84.5%, and 80.4%, respectively after 2 years. Obesity indices at baseline significantly correlated with TG, HDL�]C, and blood pressure at both baseline and 2 years later with a similar strength of correlations. BMI at baseline explained the greatest variance of later blood pressure. WC at baseline explained the greatest variance of later HDL�]C and glucose, while WHtR at baseline was the main predictor of later TG. Receiver�]operating characteristic (ROC) analysis explored the ability of the four indices to identify the later presence of CV risk. The overweight/obese children defined on the basis of BMI, WC, WHtR or %BF were more likely to develop CV risk 2 years later with relative risk (RR) scores of 3.670, 3.762, 2.767, and 2.804, respectively. The final purpose of the third study was to develop age�] and gender�]specific percentiles of WC and WHtR and cut�]off points of WC and WHtR for the prediction of CV risk in Chinese children. Smoothed percentile curves of WC and WHtR were produced in 2830 boys and 2699 girls aged 6�]12 y randomly selected from southern and northern China using the LMS method. The optimal age�] and gender�]specific thresholds of WC and WHtR for the prediction of cardiovascular risk factors clustering were derived in a sub�]sample (n=1845) by ROC analysis. Age�] and gender�]specific WC and WHtR percentiles were constructed. The WC thresholds were at the 90th and 84th percentiles for Chinese boys and girls, respectively, with sensitivity and specificity ranging from 67.2% to 83.3%. The WHtR thresholds were at the 91st and 94th percentiles for Chinese boys and girls, respectively, with sensitivity and specificity ranging from 78.6% to 88.9%. The cut�]offs of both WC and WHtR were age�] and gender�]dependent. In conclusion, the current thesis quantifies the ethnic differences in the BMI�]%BF relationship and body fat distribution between Asian children from different origins and confirms the necessity to consider ethnic differences in body composition when developing BMI and other obesity index criteria for obesity in Asian children. Moreover, ethnicity is also important in BIA prediction equations. In addition, WC and WHtR percentiles and thresholds for the prediction of CV risk in Chinese children differ from other populations. Although there was no advantage of WC or WHtR over BMI or %BF in the prediction of CV risk, obese children had a higher risk of developing the metabolic syndrome and abnormalities than normal�]weight children regardless of the obesity index used.
Resumo:
PURPOSE: The purpose of this study is to identify risk factors for developing complications following treatment of refractory glaucoma with transscleral diode laser cyclophotocoagulation (cyclodiode), to improve the safety profile of this treatment modality. METHOD: A retrospective analysis of 72 eyes from 70 patients who were treated with cyclodiode. RESULTS: The mean pre-treatment IOP was 37.0 mmHg (SD 11.0), with a mean post-treatment reduction in intraocular pressure (IOP) of 19.8 mmHg, and a mean IOP at last follow-up of 17.1 mmHg (SD 9.7). Mean total power delivered during treatment was 156.8 Joules (SD 82.7) over a mean of 1.3 treatments (SD 0.6). Sixteen eyes (22.2% of patients) developed complications from the treatment, with the most common being hypotony, occurring in 6 patients, including 4 with neovascular glaucoma. A higher pre-treatment IOP and higher mean total power delivery also were associated with higher complications. CONCLUSIONS: Cyclodiode is an effective treatment option for glaucoma that is refractory to other treatment options. By identifying risk factors for potential complications, cyclodiode can be modified accordingly for each patient to improve safety and efficacy.
Resumo:
Highway construction works have significant bearings on all aspects of sustainability. As they typically involve huge capital funds, stakeholders tend to place all interests on the financial justifications of the project, especially when embedding sustainability principles and practices may demand significant initial investment. Increasing public awareness and government policies demand that infrastructure projects respond to environmental challenges and people start to realise the negative consequences of not to pursue sustainability. Stakeholders are now keen to identify sustainable alternatives and financial implications of including them on a whole lifecycle basis. Therefore tools that aid the evaluation of investment options, such as provision of environmentally sustainable features in roads and highways, are highly desirable. Life-cycle cost analysis (LCCA) is generally recognised as a valuable approach for investment decision making for construction works. However to date it has limited application because the current LCCA models tend to focus on economic issues alone and are not able to deal with sustainability factors. This paper reports a research on identifying sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into existing LCCA models to produce a new sustainability based LCCA model with cost elements specific to sustainability measures. This presents highway project stakeholders a practical tool to evaluate investment decisions and reach an optimum balance between financial viability and sustainability deliverables.
Resumo:
Six Sigma is considered to be an important management philosophy to obtain satisfied customers. But financial service organisations have been slow to adopt Six Sigma issues so far. Despite the extensive effort that has been invested and benefits that can be obtained, the systematic implementation of Six Sigma in financial service organisations is limited. As a company wide implementation framework is missing so far, this paper tries to fill this gap. Based on theory, a conceptual framework is developed and evaluated by experts from financial institutions. The results show that it is very important to link Six Sigma with the strategic as well as the operations level. Furthermore, although Six Sigma is a very important method for improving quality of processes others such as Lean Management are also used This requires a superior project portfolio management to coordinate resources and projects of Six Sigma with the other methods used. Beside the theoretical contribution, the framework can be used by financial service companies to evaluate their Six Sigma activities. Thus, the framework grounded through literature and empirical data will be a useful guide for sustainable and successful implementation of a Six Sigma initiative in financial service organisations.
Resumo:
Increasing the number of bone marrow (BM) donors is important to ensure sufficient diversity on BM registries to meet the needs of patients. This study used an experimental approach to test the hypothesis that providing information about the risks of BM donation to allay unsubstantiated fears would reduce male and female participants’ perceptions of risk for donation and joining the Australian BM Donor Registry (ABMDR). Males’ and females’ intentions to register on the ABMDR, their attitudes, norms, and perceived behavioural control (efficacy) in relation to registering were explored also. Participants were allocated randomly to either a risk (exposed to risk information about BM donation) or no risk(not exposed to risk information) condition. In partial support of hypotheses, exposure to risk information did reduce perceived risk for registering on the ABMDR for males only. Participants in the risk condition also demonstrated lower scores on attitude (males only) and intention compared to participants in the no risk condition. These findings highlight the complex role of risk perceptions and gender differences in understanding people’s decisions to join a BM registry.
Resumo:
Business transformations are large-scale organisational change projects that, evidence suggests, are often unsuccessful. This study aims to develop a conceptual model that explains how management services that are required for a business transformation are orchestrated during such a initiative. We classify management services such as (but not limited to) change management, risk management, IT management, financial management, program management and so forth as bearing transformational and/or transactional capabilities in a transformation initiative. We then draw upon three principles of musical composition, namely melody, harmony and rhythm, and illustrate how they apply to the orchestration of management services in the management of business transformations. In order to illustrate our emerging model, we examine the case of Malaysia Airlines, who have managed to successfully turnaround the near-bankrupt organisation beyond survival. We demonstrate how the notions of melody, harmony and rhythm can be used to describe their endeavour. We conclude by discussing next steps of our research.
Resumo:
Travel in passenger cars is a ubiquitous aspect of the daily activities of many people. During the 2009 influenza A (H1N1) pandemic a case of probable transmission during car travel was reported in Australia, to which spread via the airborne route may have contributed. However, there are no data to indicate the likely risks of such events, and how they may vary and be mitigated. To address this knowledge gap, we estimated the risk of airborne influenza transmission in two cars (1989 model and 2005 model) by employing ventilation measurements and a variation of the Wells-Riley model. Results suggested that infection risk can be reduced by not recirculating air; however, estimated risk ranged from 59 to 99.9% for a 90 min trip when air was recirculated in the newer vehicle. These results have implications for interrupting in-car transmission of other illnesses spread by the airborne route.
Resumo:
The development of highway infrastructure typically requires major capital input over a long period. This often causes serious financial constraints for investors. The push for sustainability has added new dimensions to the complexity in the evaluation of highway projects, particularly on the cost front. This makes the determination of long-term viability even more a precarious exercise. Life-cycle costing analysis (LCCA) is generally recognised as a valuable tool for the assessment of financial decisions on construction works. However to date, existing LCCA models are deficient in dealing with sustainability factors, particularly for infrastructure projects due to their inherent focus on the economic issues alone. This research probed into the major challenges of implementing sustainability in highway infrastructure development in terms of financial concerns and obligations. Using results of research through literature review, questionnaire survey of industry stakeholders and semi-structured interview of senior practitioners involved in highway infrastructure development, the research identified the relative importance of cost components relating to sustainability measures and on such basis, developed ways of improving existing LCCA models to incorporate sustainability commitments into long-term financial management. On such a platform, a decision support model incorporated Fuzzy Analytical Hierarchy Process and LCCA for the evaluation of the specific cost components most concerned by infrastructure stakeholders. Two real highway infrastructure projects in Australia were then used for testing, application and validation, before the decision support model was finalised. Improved industry understanding and tools such as the developed model will lead to positive sustainability deliverables while ensuring financial viability over the lifecycle of highway infrastructure projects.
Resumo:
Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.