686 resultados para EMERGENCY-DEPARTMENT
Resumo:
In September 2009 an enormous dust storm swept across eastern Australia. Dust is potentially hazardous to health as it interferes with breathing, and previous dust storms have been linked to increased risks of asthma and even death. We examined whether the 2009 Australian dust storm changed the volume or characteristics of emergency admissions to hospital. We used an observational study design, using time series analyses to examine changes in the number of admissions, and case-only analyses to examine changes in the characteristics of admissions. The admission data were from the Prince Charles Hospital, Brisbane, between 1 January 2009 and 31 October 2009. There was a 39% increase in emergency admissions associated with the storm (95% confidence interval: 5, 81%), which lasted for just one day. The health effects of the storm could not be detected using particulate matter levels. We found no significant change in the characteristics of admissions during the storm, specifically there was no increase in respiratory admissions. The dust storm had a short-lived impact on emergency hospital admissions. This may be because the public took effective avoidance measures, or because the dust was simply not toxic, being mainly composed of soil. Emergency departments should be prepared for a short-term increase in admissions during dust storms.
Resumo:
The use of professional competency standards to assess postgraduate nursing student’s clinical performance has been in place since 2004, at the Queensland University of Technology, School of Nursing & Midwifery (SONAM) when the Graduate Certificate in Emergency Nursing degree commenced. Emergency nursing students were assessed in their workplace, using a Clinical Performance Appraisal Tool or CPAT which was based on the Australian College of Critical Care Nurses (ACCCN) Competency Standards. With the subsequent formation of a separate Emergency Nursing Course advisory group in 2007, there was a review of clinical assessment course component. The release of the 2008 CENA revised Practice Standards for the Emergency Nursing Specialist’s, led to the emergency nursing course advisory committee supporting the integration of the CENA practice standards for assessment of emergency nurses in preference to the less relevant ACCCN competency standards. The SONAM emergency nursing study area team commenced the phasing in and progression of the CENA practice standards across the two Graduate Certificate units, and Graduate Diploma and Master of Nursing (emergency) clinical major options in 2009. As some units undertaken in the degree are available to nurses in other disciplines a separate CPAT was devised for the clinical assessments according to speciality context. The team has had to carefully consider how the professional standards are integrated into the teaching and assessment of the unit and not just applied instead of the ACCCN competency standards. Professional standards for the emergency context has also helped tailor course content and learning outcomes to be relevant across a number of emergency nursing contexts in Australia. The assessment of the CPAT is undertaken at the workplace by QUT appointed clinical lecturers. Clinical lecturers need to apply and have suitable postgraduate qualification to undertake the position. The clinical lecturer support role is well established at QUT. The integration of the new CENA practice standards has necessitated a review of the postgraduate assessment of emergency nurses. A clinical lecturer workshop has been organised to review role, scope and how to utilise the new look CENA based CPAT, clinical assessment format.
Resumo:
Victorians feel a strong connection to their local waterways and most have a good grasp of river health issues. The My Victorian Waterway report analyses how Victorians interact with their local waterways including rivers, lakes and estuaries. The report is based on the results of a survey completed by more than 7,000 Victorians who answered questions about how they use and care for their local waterways as well as their knowledge of river health issues and aspirations for the future of our waterways.
Resumo:
In 1990 the Dispute Resolution Centres Act, 1990 (Qld) (the Act) was passed by the Queensland Parliament. In the second reading speech for the Dispute Resolution Centres Bill on May 1990 the Hon Dean Wells stated that the proposed legislation would make mediation services available “in a non-coercive, voluntary forum where, with the help of trained mediators, the disputants will be assisted towards their own solutions to their disputes, thereby ensuring that the result is acceptable to the parties” (Hansard, 1990, 1718). It was recognised at that time that a method for resolving disputes was necessary for which “the conventional court system is not always equipped to provide lasting resolution” (Hansard, 1990, 1717). In particular, the lasting resolution of “disputes between people in continuing relationships” was seen as made possible through the new legislation; for example, “domestic disputes, disputes between employees, and neighbourhood disputes relating to such issues as overhanging tree branches, dividing fences, barking dogs, smoke, noise and other nuisances are occurring continually in the community” (Hansard, 1990, 1717). The key features of the proposed form of mediation in the Act were articulated as follows: “attendance of both parties at mediation sessions is voluntary; a party may withdraw at any time; mediation sessions will be conducted with as little formality and technicality as possible; the rules of evidence will not apply; any agreement reached is not enforceable in any court; although it could be made so if the parties chose to proceed that way; and the provisions of the Act do not affect any rights or remedies that a party to a dispute has apart from the Act” (Hansard, 1990, 1718). Since the introduction of the Act, the Alternative Dispute Resolution Branch of the Queensland Department of Justice and Attorney General has offered mediation services through, first the Community Justice Program (CJP), and then the Dispute Resolution Centres (DRCs) for a range of family, neighbourhood, workplace and community disputes. These services have mirrored those available through similar government agencies in other states such as the Community Justice Centres of NSW and the Victorian Dispute Resolution Centres. Since 1990, mediation has become one of the fastest growing forms of alternative dispute resolution (ADR). Sourdin has commented that "In addition to the growth in court-based and community-based dispute resolution schemes, ADR has been institutionalised and has grown within Australia and overseas” (2005, 14). In Australia, in particular, the development of ADR service provision “has been assisted by the creation and growth of professional organisations such as the Leading Edge Alternative Dispute Resolvers (LEADR), the Australian Commercial Dispute Centres (ACDC), Australian Disputes Resolution Association (ADRA), Conflict Resolution Network, and the Institute of Arbitrators and Mediators Australia (IAMA)” (Sourdin, 2005, 14). The increased emphasis on the use of ADR within education contexts (particularly secondary and tertiary contexts) has “also led to an increasing acceptance and understanding of (ADR) processes” (Sourdin, 2005, 14). Proponents of the mediation process, in particular, argue that much of its success derives from the inherent flexibility and creativity of the agreements reached through the mediation process and that it is a relatively low cost option in many cases (Menkel-Meadow, 1997, 417). It is also accepted that one of the main reasons for the success of mediation can be attributed to the high level of participation by the parties involved and thus creating a sense of ownership of, and commitment to, the terms of the agreement (Boulle, 2005, 65). These characteristics are associated with some of the core values of mediation, particularly as practised in community-based models as found at the DRCs. These core values include voluntary participation, party self-determination and party empowerment (Boulle, 2005, 65). For this reason mediation is argued as being an effective approach to resolving disputes, that creates a lasting resolution of the issues. Evaluation of the mediation process, particularly in the context of the growth of ADR, has been an important aspect of the development of the process (Sourdin, 2008). Writing in 2005 for example, Boulle, states that “although there is a constant refrain for more research into mediation practice, there has been a not insignificant amount of mediation measurement, both in Australia and overseas” (Boulle, 2005, 575). The positive claims of mediation have been supported to a significant degree by evaluations of the efficiency and effectiveness of the process. A common indicator of the effectiveness of mediation is the settlement rate achieved. High settlement rates for mediated disputes have been found for Australia (Altobelli, 2003) and internationally (Alexander, 2003). Boulle notes that mediation agreement rates claimed by service providers range from 55% to 92% (Boulle, 2005, 590). The annual reports for the Alternative Dispute Resolution Branch of the Queensland Department of Justice and Attorney-General considered prior to the commencement of this study indicated generally achievement of an approximate settlement figure of 86% by the Queensland Dispute Resolution Centres. More recently, the 2008-2009 annual report states that of the 2291 civil dispute mediated in 2007-2008, 86% reached an agreement. Further, of the 2693 civil disputes mediated in 2008-2009, 73% reached an agreement. These results are noted in the report as indicating “the effectiveness of mediation in resolving disputes” and as reflecting “the high level of agreement achieved for voluntary mediations” (Annual Report, 2008-2009, online). Whilst the settlement rates for the DRCs are strong, parties are rarely contacted for long term follow-up to assess whether agreements reached during mediation lasted to the satisfaction of each party. It has certainly been the case that the Dispute Resolution Centres of Queensland have not been resourced to conduct long-term follow-up assessments of mediation agreements. As Wade notes, "it is very difficult to compare "success" rates” and whilst “politicians want the comparison studies (they) usually do not want the delay and expense of accurate studies" (1998, 114). To date, therefore, it is fair to say that the efficiency of the mediation process has been evaluated but not necessarily its effectiveness. Rather, the practice at the Queensland DRCs has been to evaluate the quality of mediation service provision and of the practice of the mediation process. This has occurred, for example, through follow-up surveys of parties' satisfaction rates with the mediation service. In most other respects it is fair to say that the Centres have relied on the high settlement rates of the mediation process as a sign of the effectiveness of mediation (Annual Reports 1991 - 2010). Research of the mediation literature conducted for the purpose of this thesis has also indicated that there is little evaluative literature that provides an in-depth analysis and assessment of the longevity of mediated agreements. Instead evaluative studies of mediation tend to assess how mediation is conducted, or compare mediation with other conflict resolution options, or assess the agreement rate of mediations, including parties' levels of satisfaction with the service provision of the dispute resolution service provider (Boulle, 2005, Chapter 16).
Resumo:
The REMNANT/EMERGENCY Artlab was funded by the Australia Council InterArts ArtLab Program in 2010 and involves 22 months of rigorous research and experimentation in several countries. The process will be developed between a core transdisciplinary team of practicing media artists, designers and engineers where possible working in consultation and collaboration with local creatives at each venue. Our team asserts that today’s environmental crisis is underpinned by a deep cultural crisis - and so to get our ‘house in order’ we urgently need to create better and more powerful ‘images’ of what a ‘citizen-led’, sustainable world might be. This ArtLab’s core aim is therefore to begin to understand how to develop and create such ‘powerful images’.
Resumo:
A hospital consists of a number of wards, units and departments that provide a variety of medical services and interact on a day-to-day basis. Nearly every department within a hospital schedules patients for the operating theatre (OT) and most wards receive patients from the OT following post-operative recovery. Because of the interrelationships between units, disruptions and cancellations within the OT can have a flow-on effect to the rest of the hospital. This often results in dissatisfied patients, nurses and doctors, escalating waiting lists, inefficient resource usage and undesirable waiting times. The objective of this study is to use Operational Research methodologies to enhance the performance of the operating theatre by improving elective patient planning using robust scheduling and improving the overall responsiveness to emergency patients by solving the disruption management and rescheduling problem. OT scheduling considers two types of patients: elective and emergency. Elective patients are selected from a waiting list and scheduled in advance based on resource availability and a set of objectives. This type of scheduling is referred to as ‘offline scheduling’. Disruptions to this schedule can occur for various reasons including variations in length of treatment, equipment restrictions or breakdown, unforeseen delays and the arrival of emergency patients, which may compete for resources. Emergency patients consist of acute patients requiring surgical intervention or in-patients whose conditions have deteriorated. These may or may not be urgent and are triaged accordingly. Most hospitals reserve theatres for emergency cases, but when these or other resources are unavailable, disruptions to the elective schedule result, such as delays in surgery start time, elective surgery cancellations or transfers to another institution. Scheduling of emergency patients and the handling of schedule disruptions is an ‘online’ process typically handled by OT staff. This means that decisions are made ‘on the spot’ in a ‘real-time’ environment. There are three key stages to this study: (1) Analyse the performance of the operating theatre department using simulation. Simulation is used as a decision support tool and involves changing system parameters and elective scheduling policies and observing the effect on the system’s performance measures; (2) Improve viability of elective schedules making offline schedules more robust to differences between expected treatment times and actual treatment times, using robust scheduling techniques. This will improve the access to care and the responsiveness to emergency patients; (3) Address the disruption management and rescheduling problem (which incorporates emergency arrivals) using innovative robust reactive scheduling techniques. The robust schedule will form the baseline schedule for the online robust reactive scheduling model.
Resumo:
With the world’s largest population of 1.3 billion, China is a rapidly developing country. In line with this development, China’s enormous health system is experiencing an unprecedented series of reforms. According to a recent official government report, China has 300, 000 health organizations, which include 60, 000 hospitals and a total number of 3.07 million beds (China NBoSoP 2006). To provide health services for the national population, as well as the substantial number of visitors, China has 1.93 million doctors and 1.34 million registered nurses (China NBoSoP 2006). From 1984 to 2004, the number of inpatients grew from about 25 to 50 million, with outpatient figures increasing from 1.1 to 1.3 billion (China MoH 2006). The scale of the health system is likely bigger than in any other countries in the world, but the quality of medical services is still among the levels of developing countries. In 2005, approximately 3.8% of inpatients (about 1.5 million)(China NBoSoP 2006) were admitted because of injury and poisoning, which created significant load for the acute health system. These increased figures are at least partly because of the development of the health system and technological health-care advances but, even with such advances, this rapid change in emergency health-care demand has created a very significant burden on existing systems...
Resumo:
The Commonwealth Department of Industry, Science and Resources is identifying best practice case study examples of supply chain management within the building and construction industry to illustrate the concepts, innovations and initiatives that are at work. The projects provide individual enterprises with examples of how to improve their performance, and the competitiveness of the industry as a whole.
Resumo:
Nowadays, Workflow Management Systems (WfMSs) and, more generally, Process Management Systems (PMPs) are process-aware Information Systems (PAISs), are widely used to support many human organizational activities, ranging from well-understood, relatively stable and structures processes (supply chain management, postal delivery tracking, etc.) to processes that are more complicated, less structured and may exhibit a high degree of variation (health-care, emergency management, etc.). Every aspect of a business process involves a certain amount of knowledge which may be complex depending on the domain of interest. The adequate representation of this knowledge is determined by the modeling language used. Some processes behave in a way that is well understood, predictable and repeatable: the tasks are clearly delineated and the control flow is straightforward. Recent discussions, however, illustrate the increasing demand for solutions for knowledge-intensive processes, where these characteristics are less applicable. The actors involved in the conduct of a knowledge-intensive process have to deal with a high degree of uncertainty. Tasks may be hard to perform and the order in which they need to be performed may be highly variable. Modeling knowledge-intensive processes can be complex as it may be hard to capture at design-time what knowledge is available at run-time. In realistic environments, for example, actors lack important knowledge at execution time or this knowledge can become obsolete as the process progresses. Even if each actor (at some point) has perfect knowledge of the world, it may not be certain of its beliefs at later points in time, since tasks by other actors may change the world without those changes being perceived. Typically, a knowledge-intensive process cannot be adequately modeled by classical, state of the art process/workflow modeling approaches. In some respect there is a lack of maturity when it comes to capturing the semantic aspects involved, both in terms of reasoning about them. The main focus of the 1st International Workshop on Knowledge-intensive Business processes (KiBP 2012) was investigating how techniques from different fields, such as Artificial Intelligence (AI), Knowledge Representation (KR), Business Process Management (BPM), Service Oriented Computing (SOC), etc., can be combined with the aim of improving the modeling and the enactment phases of a knowledge-intensive process. The 1st International Workshop on Knowledge-intensive Business process (KiBP 2012) was held as part of the program of the 2012 Knowledge Representation & Reasoning International Conference (KR 2012) in Rome, Italy, in June 2012. The workshop was hosted by the Dipartimento di Ingegneria Informatica, Automatica e Gestionale Antonio Ruberti of Sapienza Universita di Roma, with financial support of the University, through grant 2010-C26A107CN9 TESTMED, and the EU Commission through the projects FP7-25888 Greener Buildings and FP7-257899 Smart Vortex. This volume contains the 5 papers accepted and presented at the workshop. Each paper was reviewed by three members of the internationally renowned Program Committee. In addition, a further paper was invted for inclusion in the workshop proceedings and for presentation at the workshop. There were two keynote talks, one by Marlon Dumas (Institute of Computer Science, University of Tartu, Estonia) on "Integrated Data and Process Management: Finally?" and the other by Yves Lesperance (Department of Computer Science and Engineering, York University, Canada) on "A Logic-Based Approach to Business Processes Customization" completed the scientific program. We would like to thank all the Program Committee members for the valuable work in selecting the papers, Andrea Marrella for his valuable work as publication and publicity chair of the workshop, and Carola Aiello and the consulting agency Consulta Umbria for the organization of this successful event.