890 resultados para Construction process improvement
Resumo:
This research project has as main objective the design of a project to raise awareness and environmental education in the area of prevention of the urban waste production by focusing on the presentation of a methodological proposal to incorporate this theme in the Course Curriculum of the Basic Education in Cape Verde. The study aimed beyond the project design, the preparation of a guide and a set of activities, instruments to be used by the educational community and more directly by the teachers of the Basic Education (EB) of Cape Verde for knowledge construction in study area and promove the development of skills of those teachers in terms of planning activities for waste prevention. The realized work included visits to various sources of information considered relevant, the application and validation of some activities in the population testing process using the technique of participant observation. This research involved the collaboration of the educational community of Praia namely the BE teachers, Pedagogical team teaching and Promoters of the new BE Curriculum. The study made a contribution in the view of the definition of the methodology of the work project and the assessment tool in order to reflect on the work process and its subsequent correction / improvement of future operations. We also present a proposal of monitoring and evaluation instrument of the project which will be applied during the implementation phase. Its use will enable the school community to improve their practices and will facilitate the involvement of the educational community taking into consideration an environmental sustainability
Resumo:
O presente trabalho de projecto tem como principal objectivo a concepção de um projecto de sensibilização e educação ambiental na área da prevenção da produção dos resíduos urbanos com enfoque na apresentação de uma proposta metodológica de integração desta temática nos Currícula do Ensino Básico de Cabo Verde. Do estudo desenvolvido resultou, além da concepção do projecto, a elaboração de um guia, bem como um caderno de actividades, instrumentos a serem utilizados pela comunidade educativa e mais directamente pelos professores do Ensino Básico (EB) de Cabo Verde visando o reforço de conhecimentos na área de estudo identificada e o desenvolvimento de competências juntos dos referidos professores, para a planificação de actividades de prevenção da produção dos resíduos urbanos. O trabalho realizado compreendeu visitas a várias fontes de informação consideradas pertinentes assim como a aplicação e validação de algumas actividades numa população-teste com utilização da técnica de observação participante. Deste modo, o estudo contou com a colaboração da comunidade educativa da Cidade da Praia nomeadamente professores do EB, Equipa pedagógica e Promotores do novo Currículo do EB. O estudo permitiu dar um contributo na perspectiva da definição da metodologia do trabalho do projecto e instrumento de avaliação, visando uma reflexão sobre o trabalho desenvolvido e sua consequente correcção/melhoria de futuras acções. Apresentamos ainda uma proposta de instrumentos de acompanhamento e avaliação do projecto cuja aplicação se propõe no decorrer da implementação do mesmo. A sua utilização permitirá à comunidade escolar melhorar as suas práticas e facilitará o envolvimento da comunidade educativa tendo em vista a sustentabilidade ambiental.
Resumo:
This research project has as main objective the design of a project to raise awareness and environmental education in the area of prevention of the urban waste production by focusing on the presentation of a methodological proposal to incorporate this theme in the Course Curriculum of the Basic Education in Cape Verde. The study aimed beyond the project design, the preparation of a guide and a set of activities, instruments to be used by the educational community and more directly by the teachers of the Basic Education (EB) of Cape Verde for knowledge construction in study area and promove the development of skills of those teachers in terms of planning activities for waste prevention. The realized work included visits to various sources of information considered relevant, the application and validation of some activities in the population testing process using the technique of participant observation. This research involved the collaboration of the educational community of Praia namely the BE teachers, Pedagogical team teaching and Promoters of the new BE Curriculum. The study made a contribution in the view of the definition of the methodology of the work project and the assessment tool in order to reflect on the work process and its subsequent correction / improvement of future operations. We also present a proposal of monitoring and evaluation instrument of the project which will be applied during the implementation phase. Its use will enable the school community to improve their practices and will facilitate the involvement of the educational community taking into consideration an environmental sustainability
Resumo:
The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) develop Iowa’s Five-Year Transportation Improvement Program (Five-Year Program) to inform Iowans of planned investments in our state’s multi-modal transportation system. The Five-Year Program is typically updated and approved each year in June. The Five-Year Program encompasses investments in aviation, transit, railroads, trails, and highways. This brochure describes the programming process used by the Commission and Iowa DOT to develop the highway section of the Five-Year Program.
Resumo:
A extracção clandestina de areia, nas faixas costeiras e nos leitos das ribeiras, tem sido prática de muitos agregados familiares cabo-verdianos. Nas últimas décadas, a praia de Calhetona (Ilha de Santiago) foi um dos muitos locais que sofreram degradação ambiental significativa, devido à realização desta actividade sem quaisquer planos de extracção e de posterior recuperação das áreas degradadas. Este trabalho, através da conjugação de recolha de dados por inquérito, observação directa e pesquisa documental e bibliográfica, teve como objectivos a caracterização da comunidade (que habita no bairro de Ponta Calhetona) que se dedica à extracção de areia na praia de Calhetona, a descrição da dinâmica da actividade extractiva, a avaliação da percepção que a comunidade tem relativamente às consequências da sua actividade e a descrição do impacte ambiental resultante da extracção de areia. Da análise dos inquéritos, efectuados em Fevereiro de 2012, a 25 chefes de agregados familiares que efectuam a extracção de areia na praia de Calhetona, constata-se que estes são maioritariamente mulheres, predominantemente com idade compreendida entre os 40 e os 59 anos, domésticas, com baixa escolaridade, com famílias numerosas e/ou alargadas a seu cargo e dedicando-se à extração de areia à mais de 10 anos. Os inquiridos, face à situação de vulnerabilidade económica, à falta de emprego e à grande procura de areia para a construção civil, vêem nesta actividade uma fonte de rendimento. Contudo, o proveito obtido desta actividade difícil e potencialmente perigosa é reduzido. Quem efectivamente beneficia são os camionistas que compram a areia a quem procede à extracção e a vendem ao consumidor final pelo dobro do preço. Os inquiridos demonstram uma consciência generalizada dos diversos impactes ambientais negativos resultantes da sua actividade, mas alegam que a extracção de areia é uma das poucas alternativas existentes para providenciar o sustento dos seus agregados familiares. Com base na comparação do estado actual da praia de Calhetona com relatos de habitantes locais, relativos às características da mesma no passado, verifica-se que nos últimos 40-50 anos, desde que se iniciou a intensa extracção de areia nesta praia, o seu aspecto físico se degradou claramente. Essa degradação caracteriza-se principalmente pelo recuo da linha de costa, pela quase ausência de areia e pela salinização dos solos localizados nas proximidades da praia, para além dos consequentes impactes negativos sobre a desova das tartarugas e o turismo balnear.
Resumo:
This manual captures the experience of practitioners in the Iowa Department of Transportation’s (Iowa DOT’s) Office of Location and Environment (OLE). It also documents the need for coordinated project development efforts during the highway project planning, or location study phase and engineering design. The location study phase establishes: * The definition of, and need for, the highway improvement project * The range of alternatives and many key attributes of the project’s design * The recommended alternative, its impacts, and the agreed-to conditions for project approval The location study process involves developing engineering alternatives, collecting engineering and environmental data, and completing design refinements to accomplish functional designs. The items above also embody the basic content required for projects compliant with the National Environmental Policy Act (NEPA) of 19691, which directs federal agencies to use a systematic, interdisciplinary approach during the planning process whenever proposed actions (or “projects”) have the potential for environmental impacts. In doing so, NEPA requires coordination with stakeholders, review, comment, and public disclosure. Are location studies and environmental studies more about the process or the documents? If properly conducted, they concern both—unbiased and reasonable processes with quality and timely documents. In essence, every project is a story that needs to be told. Engineering and environmental regulations and guidance, as documented in this manual, will help project staff and managers become better storytellers.
Resumo:
This document serves as a reference guide to local planning agencies for the development of their regional Transportation Improvement Program (TIP) and the Statewide Transportation Improvement Program (STIP).
Resumo:
The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) develop Iowa’s Five-Year Transportation Improvement Program (Five-Year Program) to inform Iowans of planned investments in our state’s multi-modal transportation system. The Five-Year Program is typically updated and approved each year in June. The Five-Year Program encompasses investments in aviation, transit, railroads, trails, and highways. This brochure describes the programming process used by the Commission and Iowa DOT to develop the highway section of the Five-Year Program.
Resumo:
A systematic method to improve the quality (Q) factor of RF integrated inductors is presented in this paper. The proposed method is based on the layout optimization to minimize the series resistance of the inductor coil, taking into account both ohmic losses, due to conduction currents, and magnetically induced losses, due to eddy currents. The technique is particularly useful when applied to inductors in which the fabrication process includes integration substrate removal. However, it is also applicable to inductors on low-loss substrates. The method optimizes the width of the metal strip for each turn of the inductor coil, leading to a variable strip-width layout. The optimization procedure has been successfully applied to the design of square spiral inductors in a silicon-based multichip-module technology, complemented with silicon micromachining postprocessing. The obtained experimental results corroborate the validity of the proposed method. A Q factor of about 17 have been obtained for a 35-nH inductor at 1.5 GHz, with Q values higher than 40 predicted for a 20-nH inductor working at 3.5 GHz. The latter is up to a 60% better than the best results for a single strip-width inductor working at the same frequency.
Resumo:
The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) develop Iowa’s Five-Year Transportation Improvement Program (Five-Year Program) to inform Iowans of planned investments in our state’s multi-modal transportation system. The Five-Year Program is typically updated and approved each year in June. The Five-Year Program encompasses investments in aviation, transit, railroads, trails, and highways. This brochure describes the programming process used by the Commission and Iowa DOT to develop the highway section of the Five-Year Program. Each day Iowans are affected by some facet of highway transportation, whether it is to get to work or a medical appointment, receive mail, allow groceries and other goods to be stocked on local shelves, or the many other ways highways keep people, goods and services moving in our state. Iowa’s interstate and primary highways managed by the Iowa DOT are an important part of our personal mobility and state’s economy. They also provide essential connections to Iowa’s secondary roads and city streets. The process of making the critical decisions about what investments will be made to preserve and expand the state-managed highway network is complex. It involves input from a wide range of individuals and organizations, and is based on an expansive programming process.
Resumo:
The transportation system is in demand 24/7 and 365 days a year irrespective of neither the weather nor the conditions. Iowa’s transportation system is an integral and essential part of society serving commerce and daily functions of all Iowans across the state. A high quality transportation system serves as the artery for economic activity and, the condition of the infrastructure is a key element for our future growth opportunities. A key component of Iowa’s transportation system is the public roadway system owned and maintained by the state, cities and counties. In order to regularly re-evaluate the conditions of Iowa’s public roadway infrastructure and assess the ability of existing revenues to meet the needs of the system, the Iowa Department of Transportation’s 2006 Road Use Tax Fund (RUTF) report to the legislature included a recommendation that a study be conducted every five years. That recommendation was included in legislation adopted in 2007 and signed into law. The law specifically requires the following (2011 Iowa Code Section 307.31): •“The department shall periodically review the current revenue levels of the road use tax fund and the sufficiency of those revenues for the projected construction and maintenance needs of city, county, and state governments in the future. The department shall submit a written report to the general assembly regarding its findings by December 31 every five years, beginning in 2011. The report may include recommendations concerning funding levels needed to support the future mobility and accessibility for users of Iowa's public road system.” •“The department shall evaluate alternative funding sources for road maintenance and construction and report to the general assembly at least every five years on the advantages and disadvantages and the viability of alternative funding mechanisms.” Consistent with this requirement, the Iowa Department of Transportation (DOT) has prepared this study. Recognizing the importance of actively engaging with the public and transportation stakeholders in any discussion of public roadway conditions and needs, Governor Terry E. Branstad announced on March 8, 2011, the creation of, and appointments to, the Governor’s Transportation 2020 Citizen Advisory Commission (CAC). The CAC was tasked with assisting the Iowa DOT as they assess the condition of Iowa’s roadway system and evaluate current and future funding available to best address system needs. In particular the CAC was directed to gather input from the public and stakeholders regarding the condition of Iowa’s public roadway system, the impact of that system, whether additional funding is needed to maintain/improve the system, and, if so, what funding mechanisms ought to be considered. With this input, the CAC prepared a report and recommendations that were presented to Governor Branstad and the Iowa DOT in November 2011 for use in the development of this study. The CAC’s report is available at www.iowadot.gov/transportation2020/pdfs/CAC%20REPORT%20FINAL%20110211.pdf. The CAC’s report was developed utilizing analysis and information from the Iowa DOT. Therefore, the report forms the basis for this study and the two documents are very similar. Iowa is fortunate to have an extensive public roadway system that provides access to all areas of the state and facilitates the efficient movement of goods and people. However, it is also a tremendous challenge for the state, cities and counties to maintain and improve this system given flattening revenue, lost buying power, changing demands on the system, severe weather, and an aging system. This challenge didn’t appear overnight and for the last decade many studies have been completed to look into the situation and the legislature has taken significant action to begin addressing the situation. In addition, the Iowa DOT and Iowa’s cities and counties have worked jointly and independently to increase efficiency and streamline operations. All of these actions have been successful and resulted in significant changes; however, it is apparent much more needs to be done. A well-maintained, high-quality transportation system reduces transportation costs and provides consistent and reliable service. These are all factors that are critical in the evaluation companies undertake when deciding where to expand or locate new developments. The CAC and Iowa DOT heard from many Iowans that additional investment in Iowa’s roadway system is vital to support existing jobs and continued job creation in the state of Iowa. Beginning June 2011, the CAC met regularly to review material and discuss potential recommendations to address Iowa’s roadway funding challenges. This effort included extensive public outreach with meetings held in seven locations across Iowa and through a Transportation 2020 website hosted by the Iowa DOT (www.iowadot.gov/transportation2020). Over 500 people attended the public meetings held through the months of August and September, with 198 providing verbal or written comment at the meetings or through the website. Comments were received from a wide array of individuals. The public comments demonstrated overwhelming support for increased funding for Iowa’s roads. Through the public input process, several guiding principles were established to guide the development of recommendations. Those guiding principles are: • Additional revenues are restricted for road and bridge improvements only, like 95 percent of the current state road revenue is currently. This includes the fuel tax and registration fees. • State and local governments continue to streamline and become more efficient, both individually and by looking for ways to do things collectively. • User fee concept is preserved, where those who use the roads pay for them, including non¬residents. • Revenue-generating methods equitable across users. • Increase revenue generating mechanisms that are viable now but begin to implement and set the stage for longer-term solutions that bring equity and stability to road funding. • Continue Iowa’s long standing tradition of state roadway financing coming from pay-as-you-go financing. Iowa must not fall into the situation that other states are currently facing where the majority of their new program dollars are utilized to pay the debt service of past bonding. Based on the analysis of Iowa’s public roadway needs and revenue and the extensive work of the Governor’s Transportation 2020 Citizen Advisory Commission, the Iowa DOT has identified specific recommendations. The recommendations follow very closely the recommendations of the CAC (CAC recommendations from their report are repeated in Appendix B). Following is a summary of the recommendations which are fully documented beginning on page 21. 1. Through a combination of efficiency savings and increased revenue, a minimum of $215 million of revenue per year should be generated to meet Iowa’s critical roadway needs. 2. The Code of Iowa should be changed to require the study of the sufficiency of the state’s road funds to meet the road system’s needs every two years instead of every five years to coincide with the biennial legislative budget appropriation schedule. 3.Modify the current registration fee for electric vehicles to be based on weight and value using the same formula that applies to most passenger vehicles. 4.Consistent with existing Code of Iowa requirements, new funding should go to the TIME-21 Fund up to the cap ($225 million) and remaining new funding should be distributed consistent with the Road Use Tax Fund distribution formula. 5.The CAC recommended the Iowa DOT at least annually convene meetings with cities and counties to review the operation, maintenance and improvement of Iowa’s public roadway system to identify ways to jointly increase efficiency. In direct response to this recommendation, Governor Branstad directed the Iowa DOT to begin this effort immediately with a target of identifying $50 million of efficiency savings that can be captured from the over $1 billion of state revenue already provided to the Iowa DOT and Iowa’s cities and counties to administer, maintain and improve Iowa’s public roadway system. This would build upon past joint and individual actions that have reduced administrative costs and resulted in increased funding for improvement of Iowa’s public roadway system. Efficiency actions should be quantified, measured and reported to the public on a regular basis. 6.By June 30, 2012, Iowa DOT should complete a study of vehicles and equipment that use Iowa’s public roadway system but pay no user fees or substantially lower user fees than other vehicles and equipment.
Resumo:
The Quadrennial Needs Study was developed to assist in the identification of highway needs and the distribution of road funds in Iowa among the various highway entities. During the period 1978 to 1990, the process has seen large shifts in needs and associated funding distribution in individual counties with no apparent reasons. This study investigated the reasons for such shifts. The study identified program inputs that can result in major shifts in needs either up or down from minor changes in the input values. The areas of concern were identified as the condition ratings for roads and structures, traffic volume and mix counts, and the assignment of construction cost areas. Eight counties exhibiting the large shifts (greater than 30%) in needs over time were used to test the sensitivity of the variables. A ninth county was used as the base line for the study. Recommendations are identified for improvements in the process of data collection in the areas of road and structure condition--rating, traffic, and in the assignment of construction cost areas. Advice is also offered in how to account for changes in jurisdiction between successive studies. Maintenance cost area assignment and levels of maintenance service are identified as requiring additional detailed research.
Resumo:
This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.
Resumo:
In the November 2011 report issued by the Governor’s Transportation 2020 Citizen Advisory Commission (CAC), the commission recommended the Iowa Department of Transportation (DOT), at least annually, convene meetings with the cities and counties to review the operation, maintenance and improvement of Iowa’s public roadway system to identify ways to jointly increase efficiency. In response to this recommendation, Gov. Branstad directed the Iowa DOT to begin this effort immediately with a target of identifying $50 million of efficiency savings that can be captured from the $1.2 billion of Road Use Tax Funds (RUTF) provided to the Iowa DOT, cities and counties to administer, maintain and improve the public roadway system. This would build upon past joint and individual actions that have reduced administrative costs and resulted in increased funding for system improvements. Efficiency actions should be quantified, measured and reported to the public on a regular basis. Beyond the discussion of identifying funding solutions to our road and bridge needs, it is critical that all jurisdictions that own, maintain and improve the nation’s road and bridge systems demonstrate to the public these funds are utilized in the most efficient and effective manner. This requires continual innovation in all aspects of transportation planning, design, construction and maintenance - done in a transparent manner to clearly demonstrate to the public how their funds are being utilized. The Iowa DOT has identified 13 efficiency measures separated into two distinct categories – Program Efficiencies and Partnership Efficiencies. The total value of the efficiency measures is $50 million. Many of the efficiency items will need input, refinement and partnership from cities, counties, other local jurisdictions, and stakeholder interest groups. The Iowa DOT has begun meetings with many of these groups to help identify potential efficiency measures and strategies for moving forward. These partnerships and discussions will continue through implementation of the efficiency measures. Dependent on the measures identified, additional action may be required by the legislature, Iowa Transportation Commission, and/or other bodies to implement the action. In addition, a formal process will be developed to quantify, measure and report the results of actions taken on a regular basis.
Resumo:
The possibility of local elastic instabilities is considered in a first¿order structural phase transition, typically a thermoelastic martensitic transformation, with associated interfacial and volumic strain energy. They appear, for instance, as the result of shape change accommodation by simultaneous growth of different crystallographic variants. The treatment is phenomenological and deals with growth in both thermoelastic equilibrium and in nonequilibrium conditions produced by the elastic instability. Scaling of the transformed fraction curves against temperature is predicted only in the case of purely thermoelastic growth. The role of the transformation latent heat on the relaxation kinetics is also considered, and it is shown that it tends to increase the characteristic relaxation times as adiabatic conditions are approached, by keeping the system closer to a constant temperature. The analysis also reveals that the energy dissipated in the relaxation process has a double origin: release of elastic energy Wi and entropy production Si. The latter is shown to depend on both temperature rate and thermal conduction in the system.