727 resultados para Construction industry Asia
Resumo:
The current research agenda for construction process improvement is heavily influenced by the rhetoric of business process re-engineering (BPR). In contrast to the wider literature on BPR, there is little evidence of critical thought within the construction management research community. A postmodernist interpretation is advocated whereby the reality of management practice is defined by the dominant management discourse. The persuasiveness of BPR rhetoric is analysed with particular reference to the way in which it plays on the insecurity of modern managers. Despite the lip service given to ‘empowerment’ and ‘teamwork’, the dominant theme of the re-engineering movement is that of technocratic totalitarianism. From a critical perspective, it is suggested that BPR is imposed on construction organizations to ensure continued control by the industry's dominant power groups. Whilst industry leaders are fond of calling for ‘attitudinal and cultural improvement’, the language of the accepted research agenda continually reinforces the industry's dominant culture of ‘control and command’. Therefore, current research directions in process improvement perpetuate existing attitudes rather than facilitating cultural change. The concept of lean construction is seen to be the latest manifestation of this phenomenon.
Resumo:
Lean construction is considered from a human resource management (HRM) perspective. It is contended that the UK construction sector is characterised by an institutionalised regressive approach to HRM. In the face of rapidly declining recruitment rates for built environment courses, the dominant HRM philosophy of utilitarian instrumentalism does little to attract the intelligent and creative young people that the industry so badly needs. Given this broader context, there is a danger that an uncritical acceptance of lean construction will exacerbate the industry's reputation for unrewarding jobs. Construction academics have strangely ignored the extensive literature that equates lean production to a HRM regime of control, exploitation and surveillance. The emphasis of lean thinking on eliminating waste and improving efficiency makes it easy to absorb into the best practice agenda because it conforms to the existing dominant way of thinking. 'Best practice' is seemingly judged by the extent to which it serves the interests of the industry's technocratic elite. Hence it acts as a conservative force in favour of maintaining the status quo. In this respect, lean construction is the latest manifestation of a long established trend. In common with countless other improvement initiatives, the rhetoric is heavy in the machine metaphor whilst exhorting others to be more efficient. If current trends in lean construction are extrapolated into the future the ultimate destination may be uncomfortably close to Aldous Huxley's apocalyptic vision of a Brave New World. In the face of these trends, the lean construction research community pleads neutrality whilst confining its attention to the rational high ground. The future of lean construction is not yet predetermined. Many choices remain to be made. The challenge for the research community is to improve practice whilst avoiding the dehumanising tendencies of high utilitarianism.
Resumo:
From its roots in strategic management theory, stakeholder management has been adopted by the construction management academic community and applied as a valid paradigm around which research work has been generated aiming to improve project effi ciencies and effectiveness. However, academics have argued that stakeholder management should move away from purely theoretical discussions and engage more with the realities of construction project work. This paper re-appraises the stakeholder management concept for the construction domain by re-thinking some of the fundamental principles and ideals present within the more general stakeholder theory literature. It engages with issues which researchers have arguably failed to acknowledge and calls for a re-evaluation of construction stakeholder management research by presenting a review around four distinctive themes: the moral obligations of engaging with stakeholders against the business and efficiency driven imperatives of construction organisations; the contrast between theoretical abstractions and empirically grounded research; the tensions between theoretical convergence versus calls for multiple and divergent perspectives on stakeholder management and the practicalities of conducting stakeholder management in the construction domain. Such a critical re-appraisal of stakeholder management thinking both generates new lines of enquiry and promises to help inform and shape current and future industry practice.
Resumo:
Government and institutionally-driven ‘good practice transfer’ initiatives are consistently presented as a means to enhance construction firm and industry performance. Two implicit tenets of these initiatives appear to be: knowledge embedded in good practice will transfer automatically; and, the potential of implementing good practice will be capitalised regardless of the context where it is to be used. The validity of these tenets is increasingly being questioned and, concurrently, more nuanced knowledge production understandings are being developed which recognise and incorporate context-specificity. This research contributes to this growing, more critical agenda by examining the actual benefits accrued from good practice transfer from the perspective of a small specialist trade contracting firm. A concept model for successful good practice transfer is developed from a single longitudinal case study within a small heating and plumbing firm. The concept model consists of five key variables: environment, strategy, people, technology, and organisation of work. The key findings challenge the implicit assumptions prevailing in the existing literature and support a contingency approach that argues successful good practice transfer is not just adopting and mechanistically inserting into the firm, but requires addressing ‘behavioural’ aspects. For successful good practice transfer, small specialist trade contracting firms need to develop and operationalise organisation slack, mechanisms for scanning external stimuli and absorbing knowledge. They also need to formulate and communicate client-driven external strategies; to motive and educate people at all levels; to possess internal or accessible complementary skills and knowledge; to have ‘soft focus’ immediate/mid-term benefits at a project level; and, to embed good practice in current work practices.
Resumo:
Individual-level constructs are seldom taken into consideration in construction management research relating to project performance. This is antithetical to the objectives of properly conceptualizing and contextualizing the research we do because many project performance outcomes, such as the extent of cooperation and level of communication or teamwork are influenced and moderated by individuals’ perceptions, values and behaviour. A brief review of the literature in organizational studies centred on culture, identity, empowerment and trust is offered. These constructs are then explored in relation to project performance issues and outcomes, and it is noted that they are predominantly studied at the project and industry levels. We argue that focusing these constructs at the individual unit of analysis has significant implications for project performance and therefore their effects need to be systematically accounted for in explanations of the success and failure of projects. Far from being prescriptive, the aim is to generate interest and awareness for more focused research at the individual level of analysis in order to add new insights and perspectives to critical performance questions in construction management. To this end, a research agenda is outlined, arguing that construction management research integrating individual-level constructs and broader, macro-contextual issues will help define and enhance the legitimacy of the field.
Resumo:
Local, tacit and normally unspoken OHS (occupational health and safety) knowledge and practices can too easily be excluded from or remain below the industry horizon of notice, meaning that they remain unaccounted for in formal OHS policy and practice. In this article we stress the need to more systematically and routinely tap into these otherwise ‘hidden’ communication channels, which are central to how everyday safe working practices are achieved. To demonstrate this approach this paper will draw on our ethnographic research with a gang of migrant curtain wall installers on a large office development project in the north of England. In doing so we reflect on the practice-based nature of learning and sharing OHS knowledge through examples of how workers’ own patterns of successful communication help avoid health and safety problems. These understandings, we argue, can be advanced as a basis for the development of improved OHS measures, and of organizational knowing and learning.
Resumo:
This conference was an unusual and interesting event. Celebrating 25 years of Construction Management and Economics provides us with an opportunity to reflect on the research that has been reported over the years, to consider where we are now, and to think about the future of academic research in this area. Hence the sub-title of this conference: “past, present and future”. Looking through these papers, some things are clear. First, the range of topics considered interesting has expanded hugely since the journal was first published. Second, the research methods are also more diverse. Third, the involvement of wider groups of stakeholder is evident. There is a danger that this might lead to dilution of the field. But my instinct has always been to argue against the notion that Construction Management and Economics represents a discipline, as such. Granted, there are plenty of university departments around the world that would justify the idea of a discipline. But the vast majority of academic departments who contribute to the life of this journal carry different names to this. Indeed, the range and breadth of methodological approaches to the research reported in Construction Management and Economics indicates that there are several different academic disciplines being brought to bear on the construction sector. Some papers are based on economics, some on psychology and others on operational research, sociology, law, statistics, information technology, and so on. This is why I maintain that construction management is not an academic discipline, but a field of study to which a range of academic disciplines are applied. This may be why it is so interesting to be involved in this journal. The problems to which the papers are applied develop and grow. But the broad topics of the earliest papers in the journal are still relevant today. What has changed a lot is our interpretation of the problems that confront the construction sector all over the world, and the methodological approaches to resolving them. There is a constant difficulty in dealing with topics as inherently practical as these. While the demands of the academic world are driven by the need for the rigorous application of sound methods, the demands of the practical world are quite different. It can be difficult to meet the needs of both sets of stakeholders at the same time. However, increasing numbers of postgraduate courses in our area result in larger numbers of practitioners with a deeper appreciation of what research is all about, and how to interpret and apply the lessons from research. It also seems that there are contributions coming not just from construction-related university departments, but also from departments with identifiable methodological traditions of their own. I like to think that our authors can publish in journals beyond the construction-related areas, to disseminate their theoretical insights into other disciplines, and to contribute to the strength of this journal by citing our articles in more mono-disciplinary journals. This would contribute to the future of the journal in a very strong and developmental way. The greatest danger we face is in excessive self-citation, i.e. referring only to sources within the CM&E literature or, worse, referring only to other articles in the same journal. The only way to ensure a strong and influential position for journals and university departments like ours is to be sure that our work is informing other academic disciplines. This is what I would see as the future, our logical next step. If, as a community of researchers, we are not producing papers that challenge and inform the fundamentals of research methods and analytical processes, then no matter how practically relevant our output is to the industry, it will remain derivative and secondary, based on the methodological insights of others. The balancing act between methodological rigour and practical relevance is a difficult one, but not, of course, a balance that has to be struck in every single paper.
Resumo:
The construction field is dynamic and dominated by complex, ill-defined problems for which myriad possible solutions exist. Teaching students to solve construction-related problems requires an understanding of the nature of these complex problems as well as the implementation of effective instructional strategies to address them. Traditional approaches to teaching construction planning and management have long been criticized for presenting students primarily with well-defined problems - an approach inconsistent with the challenges encountered in the industry. However, growing evidence suggests that employing innovative teaching approaches, such as interactive simulation games, offers more active, hands-on and problem-based learning opportunities for students to synthesize and test acquired knowledge more closely aligned with real-life construction scenarios. Simulation games have demonstrated educational value in increasing student problem solving skills and motivation through critical attributes such as interaction and feedback-supported active learning. Nevertheless, broad acceptance of simulation games in construction engineering education remains limited. While recognizing benefits, research focused on the role of simulation games in educational settings lacks a unified approach to developing, implementing and evaluating these games. To address this gap, this paper provides an overview of the challenges associated with evaluating the effectiveness of simulation games in construction education that still impede their wide adoption. An overview of the current status, as well as the results from recently implemented Virtual Construction Simulator (VCS) game at Penn State provide lessons learned, and are intended to guide future efforts in developing interactive simulation games to reach their full potential.
Resumo:
Construction procurement is complex and there is a very wide range of options available to procurers. Inappropriate choices about how to procure may limit practical opportunities for innovation. In particular, traditional approaches to construction procurement set up many obstacles for technology suppliers to provide innovative solutions. This is because they are often employed as sub-contractors simply to provide and install equipment to specifications developed before the point at which they become involved in a project. A research team at the University of Reading has developed a procurement framework that comprehensively defines the various options open to procurers in a more fine-grained way than has been known in the past. This enables informed decisions that can establish tailor-made procurement approaches that take into account the needs of specific clients. It enables risk and reward structures to be aligned so that contracts and payment mechanisms are aligned precisely with what a client seeks to achieve. This is not a “one-size-fits-all” approach. Rather, it is an approach that enables informed decisions about how to organize individual procurements that are appropriate to particular circumstances, acknowledging that they differ for each client and for each procurement exercise. Within this context, performance-based contracting (PBC) is explored in terms of the different ways in which technology suppliers within constructed facilities might be encouraged and rewarded for the kinds of innovation sought by the ultimate clients. Examples from various industry sectors are presented, from public sector and from private sector, with a commentary about what they sought to achieve and the extent to which they were successful. The lessons from these examples are presented in terms of feasibility in relation to financial issues, governance, economics, strategic issues, contractual issues and cash flow issues for clients and for contractors. Further background documents and more detailed readings are provided in an appendix for those who wish to find out more.
Resumo:
In Kazakhstan, a transitional nation in Central Asia, the development of public–private partnerships (PPPs) is at its early stage and increasingly of strategic importance. This case study investigates risk allocation in an ongoing project: the construction and operation of 11 kindergartens in the city of Karaganda in the concession form for 14 years. Drawing on a conceptual framework of effective risk allocation, the study identifies principal PPP risks, provides a critical assessment of how and in what way each partner bears a certain risk, highlights the reasons underpinning risk allocation decisions and delineates the lessons learned. The findings show that the government has effectively transferred most risks to the private sector partner, whilst both partners share the demand risk of childcare services and the project default risk. The strong elements of risk allocation include clear assignment of parties’ responsibilities, streamlined financing schemes and incentives to complete the main project phases on time. However, risk allocation has missed an opportunity to create incentives for service quality improvements and take advantage of economies of scale. The most controversial element of risk allocation, as the study finds, is a revenue stream that an operator is supposed to receive from the provision of services unrelated to childcare, as neither partner is able to mitigate this revenue risk. The article concludes that in the kindergartens’ PPP, the government has achieved almost complete transfer of risks to the private sector partner. However, the costs of transfer are extensive government financial outlays that seriously compromise the PPP value for money.
Resumo:
In order to overcome divergence of estimation with the same data, the proposed digital costing process adopts an integrated design of information system to design the process knowledge and costing system together. By employing and extending a widely used international standard, industry foundation classes, the system can provide an integrated process which can harvest information and knowledge of current quantity surveying practice of costing method and data. Knowledge of quantification is encoded from literatures, motivation case and standards. It can reduce the time consumption of current manual practice. The further development will represent the pricing process in a Bayesian Network based knowledge representation approach. The hybrid types of knowledge representation can produce a reliable estimation for construction project. In a practical term, the knowledge management of quantity surveying can improve the system of construction estimation. The theoretical significance of this study lies in the fact that its content and conclusion make it possible to develop an automatic estimation system based on hybrid knowledge representation approach.
Resumo:
The Westminster Sustainable Business Forum (WSBF) has compiled a collection of expert essays on the topic of ‘sustainable construction’ contributed to by industry, policy-makers, and specialists from academia.
Resumo:
The Pre-Pottery Neolithic A (PPNA) period in Southwest Asia is essential for our understanding of the transition to sedentary, agricultural communities. Developments in architecture are key to understanding this transition, but many aspects of PPNA architecture remain elusive, such as construction techniques, the selection of building materials, and the functional use of space. The primary aim of the research described within this contribution was to build a PPNA-like structure in order to answer questions about PPNA architecture in general, while specifically addressing issues raised by the excavation of structures at the site of WF16, Southern Jordan. The second aim was to display a ‘PPNA’ building to visitors in Wadi Faynan to enhance their understanding of the period. The experimental construction based on one of the WF16 structures showed that 1) required materials can be acquired locally; 2) a construction technique using mud layers as described in this paper was likely used; 3) flat, or very slightly dome-shaped, roofs are functional and can also be used as a solid working platform; 4) the WF16 small semi-subterranean buildings appear inappropriate for housing a nuclear family unit.