802 resultados para Building Engineering students


Relevância:

30.00% 30.00%

Publicador:

Resumo:

cover-title

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One-dimensional drying of a porous building material is modelled as a nonlinear diffusion process. The most difficult case of strong surface drying when an internal drying front is created is treated in particular. Simple analytical formulae for the drying front and moisture profiles during second stage drying are obtained when the hydraulic diffusivity is known. The analysis demonstrates the origin of the constant drying front speed observed elsewhere experimentally. Application of the formulae is illustrated for an exponential diffusivity and applied to the drying of a fired clay brick.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a critical analysis of the Bachelor of Materials Engineering programme compared with the expectations of the Institution of Engineers Australia (IEAust) and of UQ. To set the scene, the graduate attributes are listed, the programme framework is presented and the educational culture and available facilities are described Then, the programme delivery is described; this includes an analysis of the learning opportunities that allow students to develop the graduate attributes. Finally, an assessment is made of programme outcomes relating to graduate attributes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The field of environmental engineering is developing as a result of changing environmental requirements. In response, environmental engineering education (E3) needs to ensure that it provides students with the necessary tools to address these challenges. In this paper the current status and future development of E3 is evaluated based on a questionnaire sent to universities and potential employers of E3 graduates. With increasing demands on environmental quality, the complexity of environmental engineering problems to be solved can be expected to increase. To find solutions environmental engineers will need to work in interdisciplinary teams. Based on the questionnaire there was a broad agreement that the best way to prepare students for these future challenges is to provide them with a fundamental education in basic sciences and related engineering fields. Many exciting developments in the environmental engineering profession will be located at the interface between engineering, science, and society. Aspects of all three areas need to be included in E3 and the student needs to be exposed to the tensions associated with linking the three.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Control Engineering is an essential part of university electrical engineering education. Normally, a control course requires considerable mathematical as well as engineering knowledge and is consequently regarded as a difficult course by many undergraduate students. From the academic point of view, how to help the students to improve their learning of the control engineering knowledge is therefore an important task which requires careful planning and innovative teaching methods. Traditionally, the didactic teaching approach has been used to teach the students the concepts needed to solve control problems. This approach is commonly adopted in many mathematics intensive courses; however it generally lacks reflection from the students to improve their learning. This paper addresses the practice of action learning and context-based learning models in teaching university control courses. This context-based approach has been practised in teaching several control engineering courses in a university with promising results, particularly in view of student learning performances.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An approach and strategy for automatic detection of buildings from aerial images using combined image analysis and interpretation techniques is described in this paper. It is undertaken in several steps. A dense DSM is obtained by stereo image matching and then the results of multi-band classification, the DSM, and Normalized Difference Vegetation Index (NDVI) are used to reveal preliminary building interest areas. From these areas, a shape modeling algorithm has been used to precisely delineate their boundaries. The Dempster-Shafer data fusion technique is then applied to detect buildings from the combination of three data sources by a statistically-based classification. A number of test areas, which include buildings of different sizes, shape, and roof color have been investigated. The tests are encouraging and demonstrate that all processes in this system are important for effective building detection.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes and analyses an innovative engineering management course that applies a project management framework in the context of a feasibility study for a prospective research project. The aim is to have students learn aspects of management that will be relevant from the outset of their professional career while simultaneously having immediate value in helping them to manage a research project and capstone design project in their senior year. An integral part of this innovation was the development of a web-based project management tool. While the main objectives of the new course design were achieved, a number of important lessons were learned that would guide the further development and continuous improvement of this course. The most critical of these is the need to achieve the optimum balance in the mind of the students between doing the project and critically analyzing the processes used to accomplish the work.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There has been a greater emphasis over the past few years of encouraging high school students to take up engineering as a career. This is due to a greater need for engineers in society, particularly in areas that are suffering a skills shortage. Both the engineering profession and universities across Australia have moved to address this shortage, with a proliferation of engineering outreach activities and programs the result. The Engineering Link Group (TELG) began the Engineering Link Project (ELP) over a decade ago with a focus on helping motivated high school students make an informed choice about engineering as a career. It also aimed at encouraging more high school students to study maths and science at high school. From the start the ELP was designed so that the students became engineers, rather than just hear from or watch engineers. Real working engineers pose problems to groups of students for them solve over the course of a day. In this way, students experience what it is like to be an engineer. It has been found that the project does help high school students make more informed career choices about engineering. The project also gave the students real life and practical reasons for studying sciences and mathematics at high school. © 2005, Australasian Association for Engineering Education

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Continuing Professional Development (CPD) is seen as a vital part of a professional engineer’s career, by professional engineering institutions as well as individual engineers. Factors such as ever-changing workforce requirements and rapid technological change have resulted in engineers no longer being able to rely just on the skills they learnt at university or can pick up on the job; they must undergo a structured professional development with clear objectives to develop further professional knowledge, values and skills. This paper presents a course developed for students undertaking a Master of Engineering or Master of Project Management at the University of Queensland. This course was specifically designed to help students plan their continuing professional development, while developing professional skills such as communication, ethical reasoning, critical judgement and the need for sustainable development. The course utilised a work integrated learning pedagogy applied within a formal learning environment, and followed the competency based chartered membership program of Engineers Australia, the peak professional body of engineers in Australia. The course was developed and analysed using an action learning approach. The main research question was “Can extra teaching and learning activities be developed that will simulate workplace learning?” The students continually assessed and reflected upon their current competencies, skills and abilities, and planed for the future attainment of specific competencies which they identified as important to their future careers. Various evaluation methods, including surveys before and after the course, were used to evaluate the action learning intervention. It was found that the assessment developed for the course was one of the most important factors, not only in driving student learning, as is widely accepted, but also in changing the students’ understandings and acceptance of the need for continuous professional development. The students also felt that the knowledge, values and skills they developed would be beneficial for their future careers, as they were developed within the context of their own professional development, rather than to just get through the course. © 2005, American Society for Engineering Education

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many maintenance managers find it difficult to justify investments in maintenance improvement initiatives. In part, this is due to a tendency by mine managers to regard maintenance purely as a cost centre, and not as a process able to influence productive capacity and profit. It is also hindered by a lack of alignment between commonly used maintenance performance measures and key business drivers, and the lack of formal business training amongst maintenance professionals. With this in mind, a model to assist maintenance managers in evaluating the benefits of maintenance improvement projects was recently formulated. The model considers four cost saving dimensions. These are: 1. reduction in the cost of unplanned repairs and maintenance, 2. increased or accelerated production and/or sales, 3. spares inventory reduction, and 4. reduction in over-investment in physical assets and operating costs. This paper discusses the application of this model and a number of numerical examples are given to justify investments in maintenance improvement projects having varying objectives.