867 resultados para workflow scheduling
Resumo:
Utilizing advanced information technology, Intensive Care Unit (ICU) remote monitoring allows highly trained specialists to oversee a large number of patients at multiple sites on a continuous basis. In the current research, we conducted a time-motion study of registered nurses’ work in an ICU remote monitoring facility. Data were collected on seven nurses through 40 hours of observation. The results showed that nurses’ essential tasks were centered on three themes: monitoring patients, maintaining patients’ health records, and managing technology use. In monitoring patients, nurses spent 52% of the time assimilating information embedded in a clinical information system and 15% on monitoring live vitals. System-generated alerts frequently interrupted nurses in their task performance and redirected them to manage suddenly appearing events. These findings provide insight into nurses’ workflow in a new, technology-driven critical care setting and have important implications for system design, work engineering, and personnel selection and training.
Resumo:
An understanding of interruptions in healthcare is important for the design, implementation, and evaluation of health information systems and for the management of clinical workflow and medical errors. The purpose of this study is to identify and classify the types of interruptions experienced by Emergency Department(ED) nurses working in a Level One Trauma Center. This was an observational field study of Registered Nurses (RNs) employed in a Level One Trauma Center using the shadowing method. Results of the study indicate that nurses were both recipients and initiators of interruptions. Telephones, pagers, and face-to-face conversations were the most common sources of interruptions. Unlike other industries, the healthcare community has not systematically studied interruptions in clinical settings to determine and weigh the necessity of the interruption against their sometimes negative results such as medical errors, decreased efficiency, and increased costs. Our study presented here is an initial step to understand the nature, causes, and effects of interruptions, thereby improving both the quality of healthcare and patient safety. We developed an ethnographic data collection technique and a data coding method for the capturing and analysis of interruptions. The interruption data we collected are systematic, comprehensive, and close to exhaustive. They confirmed the findings from earlier studies by other researchers that interruptions are frequent events in critical care and other healthcare settings. We are currently using these data to analyze the workflow dynamics of ED clinicians, to identify the bottlenecks of information flow, and to develop interventions to improve the efficiency of emergency care through the management of interruptions.
Resumo:
OBJECTIVE: To identify and describe unintended adverse consequences related to clinical workflow when implementing or using computerized provider order entry (CPOE) systems. METHODS: We analyzed qualitative data from field observations and formal interviews gathered over a three-year period at five hospitals in three organizations. Five multidisciplinary researchers worked together to identify themes related to the impacts of CPOE systems on clinical workflow. RESULTS: CPOE systems can affect clinical work by 1) introducing or exposing human/computer interaction problems, 2) altering the pace, sequencing, and dynamics of clinical activities, 3) providing only partial support for the work activities of all types of clinical personnel, 4) reducing clinical situation awareness, and 5) poorly reflecting organizational policy and procedure. CONCLUSIONS: As CPOE systems evolve, those involved must take care to mitigate the many unintended adverse effects these systems have on clinical workflow. Workflow issues resulting from CPOE can be mitigated by iteratively altering both clinical workflow and the CPOE system until a satisfactory fit is achieved.
Resumo:
An understanding of interruptions in healthcare is important for the design, implementation, and evaluation of health information systems and for the management of clinical workflow and medical errors. The purpose of this study is to identify and classify the types of interruptions experienced by ED nurses working in a Level One Trauma Center. This was an observational field study of Registered Nurses employed in a Level One Trauma Center using the shadowing method. Results of the study indicate that nurses were both recipients and initiators of interruptions. Telephone, pagers, and face-to-face conversations were the most common sources of interruptions. Unlike other industries, the outcomes caused by interruptions resulting in medical errors, decreased efficiency and increased cost have not been systematically studied in healthcare. Our study presented here is an initial step to understand the nature, causes, and effects of interruptions, and to develop interventions to manage interruptions to improve healthcare quality and patient safety. We developed an ethnographic data collection technique and a data coding method for the capturing and analysis of interruptions. The interruption data we collected are systematic, comprehensive, and close to exhaustive. They confirmed the findings from early studies by other researchers that interruptions are frequent events in critical care and other healthcare settings. We are currently using these data to analyze the workflow dynamics of ED clinicians, identify the bottlenecks of information flow, and develop interventions to improve the efficiency of emergency care through the management of interruptions.
Resumo:
This paper deals with scheduling batch (i.e., discontinuous), continuous, and semicontinuous production in process industries (e.g., chemical, pharmaceutical, or metal casting industries) where intermediate storage facilities and renewable resources (processing units and manpower) of limited capacity have to be observed. First, different storage configurations typical of process industries are discussed. Second, a basic scheduling problem covering the three above production modes is presented. Third, (exact and truncated) branch-and-bound methods for the basic scheduling problem and the special case of batch scheduling are proposed and subjected to an experimental performance analysis. The solution approach presented is flexible and in principle simple, and it can (approximately) solve relatively large problem instances with sufficient accuracy.
Resumo:
Car manufacturers increasingly offer delivery programs for the factory pick-up of new cars. Such a program consists of a broad range of event-marketing activities. In this paper we investigate the problem of scheduling the delivery program activities of one day such that the sum of the customers’ waiting times is minimized. We show how to model this problem as a resource-constrained project scheduling problem with nonregular objective function, and we present a relaxation-based beam-search solution heuristic. The relaxations are solved by exploiting a duality relationship between temporal scheduling and min-cost network flow problems. This approach has been developed in cooperation with a German automaker. The performance of the heuristic has been evaluated based on practical and randomly generated test instances.
Resumo:
We study a real-world scheduling problem arising in the context of a rolling ingots production. First we review the production process and discuss peculiarities that have to be observed when scheduling a given set of production orders on the production facilities. We then show how to model this scheduling problem using prescribed time lags between operations, different kinds of resources, and sequence-dependent changeovers. A branch-and-bound solution procedure is presented in the second part. The basic principle is to relax the resource constraints by assuming infinite resource availability. Resulting resource conflicts are then stepwise resolved by introducing precedence relationships among operations competing for the same resources. The algorithm has been implemented as a beam search heuristic enumerating alternative sets of precedence relationships.
Resumo:
An Advanced Planning System (APS) offers support at all planning levels along the supply chain while observing limited resources. We consider an APS for process industries (e.g. chemical and pharmaceutical industries) consisting of the modules network design (for long–term decisions), supply network planning (for medium–term decisions), and detailed production scheduling (for short–term decisions). For each module, we outline the decision problem, discuss the specifi cs of process industries, and review state–of–the–art solution approaches. For the module detailed production scheduling, a new solution approach is proposed in the case of batch production, which can solve much larger practical problems than the methods known thus far. The new approach decomposes detailed production scheduling for batch production into batching and batch scheduling. The batching problem converts the primary requirements for products into individual batches, where the work load is to be minimized. We formulate the batching problem as a nonlinear mixed–integer program and transform it into a linear mixed–binary program of moderate size, which can be solved by standard software. The batch scheduling problem allocates the batches to scarce resources such as processing units, workers, and intermediate storage facilities, where some regular objective function like the makespan is to be minimized. The batch scheduling problem is modelled as a resource–constrained project scheduling problem, which can be solved by an efficient truncated branch–and–bound algorithm developed recently. The performance of the new solution procedures for batching and batch scheduling is demonstrated by solving several instances of a case study from process industries.
Resumo:
The paper deals with batch scheduling problems in process industries where final products arise from several successive chemical or physical transformations of raw materials using multi–purpose equipment. In batch production mode, the total requirements of intermediate and final products are partitioned into batches. The production start of a batch at a given level requires the availability of all input products. We consider the problem of scheduling the production of given batches such that the makespan is minimized. Constraints like minimum and maximum time lags between successive production levels, sequence–dependent facility setup times, finite intermediate storages, production breaks, and time–varying manpower contribute to the complexity of this problem. We propose a new solution approach using models and methods of resource–constrained project scheduling, which (approximately) solves problems of industrial size within a reasonable amount of time.
Resumo:
This paper is concerned with the modelling of storage configurations for intermediate products in process industries. Those models form the basis of algorithms for scheduling chemical production plants. Different storage capacity settings (unlimited, finite, and no intermediate storage), storage homogeneity settings (dedicated and shared storage), and storage time settings (unlimited, finite, and no wait) are considered. We discuss a classification of storage constraints in batch scheduling and show how those constraints can be integrated into a general production scheduling model that is based on the concept of cumulative resources.