984 resultados para large infrastructure


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A good system of preventive bridge maintenance enhances the ability of engineers to manage and monitor bridge conditions, and take proper action at the right time. Traditionally infrastructure inspection is performed via infrequent periodical visual inspection in the field. Wireless sensor technology provides an alternative cost-effective approach for constant monitoring of infrastructures. Scientific data-acquisition systems make reliable structural measurements, even in inaccessible and harsh environments by using wireless sensors. With advances in sensor technology and availability of low cost integrated circuits, a wireless monitoring sensor network has been considered to be the new generation technology for structural health monitoring. The main goal of this project was to implement a wireless sensor network for monitoring the behavior and integrity of highway bridges. At the core of the system is a low-cost, low power wireless strain sensor node whose hardware design is optimized for structural monitoring applications. The key components of the systems are the control unit, sensors, software and communication capability. The extensive information developed for each of these areas has been used to design the system. The performance and reliability of the proposed wireless monitoring system is validated on a 34 feet span composite beam in slab bridge in Black Hawk County, Iowa. The micro strain data is successfully extracted from output-only response collected by the wireless monitoring system. The energy efficiency of the system was investigated to estimate the battery lifetime of the wireless sensor nodes. This report also documents system design, the method used for data acquisition, and system validation and field testing. Recommendations on further implementation of wireless sensor networks for long term monitoring are provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Substantial collective flow is observed in collisions between lead nuclei at Large Hadron Collider (LHC) as evidenced by the azimuthal correlations in the transverse momentum distributions of the produced particles. Our calculations indicate that the global v1-flow, which at RHIC peaked at negative rapidities (named third flow component or antiflow), now at LHC is going to turn toward forward rapidities (to the same side and direction as the projectile residue). Potentially this can provide a sensitive barometer to estimate the pressure and transport properties of the quark-gluon plasma. Our calculations also take into account the initial state center-of-mass rapidity fluctuations, and demonstrate that these are crucial for v1 simulations. In order to better study the transverse momentum flow dependence we suggest a new"symmetrized" vS1(pt) function, and we also propose a new method to disentangle global v1 flow from the contribution generated by the random fluctuations in the initial state. This will enhance the possibilities of studying the collective Global v1 flow both at the STAR Beam Energy Scan program and at LHC.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mungbean cultivar MGS Esmeralda was developed by Asian Vegetable Research and Development Center (Shanhua, Taiwan), as a result of crossing between the lines VC 1973A and VC 2768A. In ten trials conducted in the State of Minas Gerais, Brazil, it produced 13.5% more grains than 'Ouro Verde MG-2' (control cultivar), and its highest yield was 2,550 kg ha-1. The cultivar MGS Esmeralda is more susceptible to lodging, and its pods mature more uniformly than Ouro Verde MG-2 pods. One hundred-seed mass of 'MGS Esmeralda' ranged between 5.5 and 6.8 g. Both cultivars are susceptible to powdery mildew and cercospora leaf spot.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Department of Management reporting on the status of the Iowa Infrastructure Investment Program, known as the I-JOBS Program, as of September 30, 2010 with additional survey information from departments on the number of positions supported through October 31, 2010.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Revenue Bonds Capitals and Revenue Bonds Capitals II.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major maintenance; health, safety, loss of use; and Americans with Disabilities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Tenth Annual Report to the Governor, dated December 15, 2008.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major maintenance; health, safety, loss of use; and Americans with Disabilities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Tenth Annual Report to the Governor, dated December 15, 2008.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major maintenance; health, safety, loss of use; and Americans with Disabilities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Tenth Annual Report to the Governor, dated December 15, 2008.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major maintenance; health, safety, loss of use; and Americans with Disabilities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Tenth Annual Report to the Governor, dated December 15, 2008.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The pmpose of the Watershed Improvement Fund is to enhance the water quality and flood prevention efforts in the state through a variety of impairment-based, locally­ directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enlmnce the water quality and flood prevention efforts in the state through a variety of impairment-based, locally­ directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest eamed on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this paper is to test the effectiveness of wage-irrelevant goal setting policies in a laboratory environment. In our design, managers can assign a goal to their workers by setting a certain level of performance on the work task. We establish our theoretical conjectures by developing a model where assigned goals act as reference points to workers’ intrinsic motivation. Consistent with our model, we find that managers set goals which are challenging but attainable for an average-ability worker. Workers respond to these goals by increasing effort, performance and by decreasing on-the-job leisure activities with respect to the no-goal setting baseline. Finally, we study the interaction between goal setting and monetary rewards and find that goal setting is most effective when monetary incentives are strong. These results suggest that goal setting may produce intrinsic motivation and increase workers’ performance beyond what is achieved using solely monetary incentives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many state, county, and local agencies are faced with deteriorating bridge infrastructure composed of a large percentage of relatively short to medium span bridges. In many cases, these older structures are rolled or welded longitudinal steel stringers acting compositely with a reinforced concrete deck. Most of these bridges, although still in service, need some level of strengthening due to increases in legal live loads or loss of capacity due to deterioration. Although these bridges are overstressed in most instances, they do not warrant replacement; thus, structurally efficient but cost-effective means of strengthening needs to be employed. In the past, the use of bolted steel cover plates or angles was a common retrofit option for strengthening such bridges. However, the time and labor involved to attach such a strengthening system can sometimes be prohibitive. This project was funded through the Federal Highway Administration’s Innovative Bridge Research and Construction program. The goal is to retrofit an existing structurally deficient, three-span continuous steel stringer bridge using an innovative technique that involves the application of post-tensioning forces; the post-tensioning forces were applied using fiber reinforced polymer post-tensioning bars. When compared to other strengthening methods, the use of carbon fiber reinforced polymer composite materials is very appealing in that they are highly resistant to corrosion, have a low weight, and have a high tensile strength. Before the post-tensioning system was installed, a diagnostic load test was conducted on the subject bridge to establish a baseline behavior of the unstrengthened bridge. During the process of installing the post-tensioning hardware and stressing the system, both the bridge and the post-tensioning system were monitored. The installation of the hardware was followed by a follow-up diagnostic load test to assess the effectiveness of the post-tensioning strengthening system. Additional load tests were performed over a period of two years to identify any changes in the strengthening system with time. Laboratory testing of several typical carbon fiber reinforced polymer bar specimens was also conducted to more thoroughly understand their behavior. This report documents the design, installation, and field testing of the strengthening system and bridge.