965 resultados para extension circular
Resumo:
William Hamilton Merritt (1793-1862) was a soldier, merchant, and politician who was instrumental in the promotion and development of the Welland Canal. After serving with the Lincoln militia during the War of 1812, Merritt became a merchant in St. Catharines, and purchased some land on Twelve Mile Creek on which he ran a sawmill and constructed a grist mill. He initially envisioned a canal between the Welland River and Twelve Mile Creek, which evolved into a plan to link Lake Ontario and Lake Erie. This would enable goods from western Canada to be conveniently shipped to Montreal and Great Britain through the St. Lawrence, while bypassing the Niagara portage. His plan met with opposition for financial and political reasons, as well as from those along the Niagara portage whose businesses would suffer if the canal were built. Despite this opposition, the Welland Canal Company was chartered by the Upper Canadian assembly in January, 1824. Construction on the canal began later that year, and was completed in 1829.
Resumo:
William Hamilton Merritt (1793-1862) was a soldier, merchant, and politician who was instrumental in the promotion and development of the Welland Canal. After serving with the Lincoln militia during the War of 1812, Merritt became a merchant in St. Catharines, and purchased some land on Twelve Mile Creek on which he ran a sawmill and constructed a grist mill. He initially envisioned a canal between the Welland River and Twelve Mile Creek, which evolved into a plan to link Lake Ontario and Lake Erie. This would enable goods from western Canada to be conveniently shipped to Montreal and Great Britain through the St. Lawrence, while bypassing the Niagara portage. His plan met with opposition for financial and political reasons, as well as from those along the Niagara portage whose businesses would suffer if the canal were built. Despite this opposition, the Welland Canal Company was chartered by the Upper Canadian assembly in January, 1824. Construction on the canal began later that year, and was completed in 1829
Resumo:
List of Employees to be involved in the extension of the Port Dalhousie and Thorold Railway (1 page, handwritten). This is signed by S.D. Woodruff, Nov. 25, 1856.
Resumo:
Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.
Resumo:
Chart of estimate of cost of Port Dalhousie and Thorold Railway extension Line no. 1 signed by Mr. Shanly, Mar. 12, 1857.
Resumo:
Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.