996 resultados para adaptation plan
Resumo:
The Mekong River delta of Vietnam supports a thriving aquaculture industry but is exposed to the impacts of climate change. In particular, sea level rise and attendant increased flooding (both coastal and riverine) and coastal salinity intrusion threaten the long-term viability of this important industry. This working paper summarizes an analysis of the economics of aquaculture adaptation in the delta, focusing on the grow-out of two exported aquaculture species—the freshwater striped catfish and the brackish-water tiger shrimp. The analysis was conducted for four pond-based production systems: catfish in the inland and coastal provinces and improved extensive and semi-intensive/intensive shrimp culture.
Resumo:
This is the River Ehen and Calder sub catchment management plan: Consultation Report September 1993 produced by the National Rivers Authority (NRA) North West Region in 1993. The report focuses on the management plan of both River Catchments Ehen and Calder, in North West England, UK. The Catchment Management Plan (C.M.P.) enabled the NRA to summarise the status of the catchment, identify the main issues and present its vision of the future. It provides a strategic policy framework for its Management and influences decision making leading to improvements in the water environment. The report contains sections on Description of Catchment, Catchment uses by NRA function, Target and objectives of the plan, Summary of Issues and Catchment Issues. The section on description of Catchment includes a general description, Transport, Geology, major services, summary of key details, area, topography, administrative details, main towns and population, water quality Sewage Treatment Works Trade effluent discharges, Water Resources, flood defence and land drainage and Fisheries.
Resumo:
Historic map of the River Lune Fishery District.
Resumo:
This is the Water Level Management Plan for the Rostherne Mere by the Environment Agency. The purpose of the Plan is to provide a formal basis for managing the land drainage system and water supply system of the area in order to provide a sustainable balance between the conservation and agricultural interest in the area. No changes are proposed to present water level management or maintenance practices unless and until such changes are agreed by all parties. The report contains sections on description of Site, water level management, maintenance, nature conservation, agriculture, fisheries, archaeology, water quality and water resources, development adjacent to watercourses, contingencies and objectives of the Water Level Management.
Resumo:
This is a report on the Conservation Plan for Rostherne Mere. The project primarly involved collating existing information from a variety of sources, supplemented by a limited amount of survey work commissioned for the project, including identification of the surface water catchment, water flows, and land use within the catchment. The section 1 outlines the physical situation of the Site of Special Scientific Interest (SSSI), its geological setting and hydrological regime. A summary of the ecological characteristics, conservation interest and objectives is provided in Section 2, and the issues affecting the site are identified in Section 3. . Operations and mechanisms for addressing the issues are suggested in Section 4, compiled from field visits, information held on file by English Nature and the Environment Agency, and English Nature. The last Section 5 provides a brief summary of the site’s condition and a discussion of the issues and operations suggested. A summary table is provided of the recommended actions for each site. Supporting information on the hydrology and aquatic ecology (where relevant) is provided in appendices.
Resumo:
This is the River Gowy and Thornton Brook improvements: Environmental Action Plan report produced by the Environment Agency in 2000. This Environmental Action Plan relates to the proposals by the Environment Agency to improve the flood defences of land adjacent to the River Gowy, about 3 km east of Ellesmere Port, Cheshire. The purpose of the Environmental Action Plan (EAP) is to provide details of how the issues addressed in the Environmental Statement (ES) will be carried through to the completion of the project. The EAP represents a commitment to the environmental recommendations formulated during the environmental assessment process and should be closely adhered to during the design, construction and post project monitoring o f the works. For any matters that cannot be finalised until during construction the constraints will be detailed in the plan so they are implemented in the contracts.
Resumo:
This is the River Camel Salmon Action Plan Final document produced by the Environment Agency in 2002. This final Salmon Action Plan (SAP) for the River Camel catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Camel salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This Action Plan aims to promote long term collaboration and co-operation between the Agency and other interested parties to effectively and efficiently manage the stock of salmon on the River Camel.
Resumo:
This is the River Fowey Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Fowey catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Fowey salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The main objective of the Fowey SAP therefore, is to maintain, improve and develop the Fowey salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support. Although the Fowey is passing its conservation limit, the consultees felt very strongly that there were two major factors limiting the salmon stock of the River Fowey- the overgrazing of Bodmin Moor and the use of the catchment for water supply by South West Water.
Resumo:
This is the River Lynher Salmon Action Plan Final document produced by the Environment Agency in 1999. This final Salmon Action Plan (SAP) for the River Lynher catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lynher salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The River Lynher salmon stock has suffered two periods of spawning target failure within the past ten years. This assessment can only be estimated and in this case is likely to be dependent on river flow and the availability of salmon to the rods as only rod catch is used in the compliance assessment.
Resumo:
This is the River Plym Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Plym catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lynher salmon stock. These issues and actions follow on from the detailed analysis of the catchment, which is presented in the River Plym SAP Consultation document.The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The main objective of the River Plym SAP therefore, is to maintain, improve and develop the River Plym salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support. The River Plym has failed to pass its conservation limit since 1996, and the consultees felt very strongly that there were three major factors limiting the salmon stock of the River Plym.
Resumo:
This is the River Tavy Salmon Action Plan Final document produced by the Environment Agency in 2000. This final Salmon Action Plan (SAP) for the River Tavy catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Tavy salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This Action Plan aims to promote long term collaboration and co-operation between the Agency and other interested parties to effectively and efficiently manage the stock of salmon on the River Tavy.