768 resultados para Retest Reliability
Resumo:
Sensitivity, specificity, and reproducibility are vital to interpret neuroscientific results from functional magnetic resonance imaging (fMRI) experiments. Here we examine the scan–rescan reliability of the percent signal change (PSC) and parameters estimated using Dynamic Causal Modeling (DCM) in scans taken in the same scan session, less than 5 min apart. We find fair to good reliability of PSC in regions that are involved with the task, and fair to excellent reliability with DCM. Also, the DCM analysis uncovers group differences that were not present in the analysis of PSC, which implies that DCM may be more sensitive to the nuances of signal changes in fMRI data.
Resumo:
Purpose – The purpose of this research is to show that reliability analysis and its implementation will lead to an improved whole life performance of the building systems, and hence their life cycle costs (LCC). Design/methodology/approach – This paper analyses reliability impacts on the whole life cycle of building systems, and reviews the up-to-date approaches adopted in UK construction, based on questionnaires designed to investigate the use of reliability within the industry. Findings – Approaches to reliability design and maintainability design have been introduced from the operating environment level, system structural level and component level, and a scheduled maintenance logic tree is modified based on the model developed by Pride. Different stages of the whole life cycle of building services systems, reliability-associated factors should be considered to ensure the system's whole life performance. It is suggested that data analysis should be applied in reliability design, maintainability design, and maintenance policy development. Originality/value – The paper presents important factors in different stages of the whole life cycle of the systems, and reliability and maintainability design approaches which can be helpful for building services system designers. The survey from the questionnaires provides the designers with understanding of key impacting factors.
Resumo:
This paper addresses two critical issues associated with reliability and maintenance of building services systems. The first is the ratio of operating and/or maintenance costs to initial costs for building services systems. It is an important parameter for life cycle costing and maintenance policy development. The second is the proportion of items among building services systems that need preventive maintenance. In this paper, we estimate the ratios based on a cost dataset. It suggests that correctly estimating the ratio be important but using a constant ratio in life cycle costing may result in wrong decisions. It also estimates the proportion of preventive maintenance for building services systems on the basis of the distribution of failure patterns.
Resumo:
Many photovoltaic inverter designs make use of a buck based switched mode power supply (SMPS) to produce a rectified sinusoidal waveform. This waveform is then unfolded by a low frequency switching structure to produce a fully sinusoidal waveform. The Cuk SMPS could offer advantages over the buck in such applications. Unfortunately the Cuk converter is considered to be difficult to control using classical methods. Correct closed loop design is essential for stable operation of Cuk converters. Due to these stability issues, Cuk converter based designs often require stiff low bandwidth control loops. In order to achieve this stable closed loop performance, traditional designs invariably need large, unreliable electrolytic capacitors. In this paper, an inverter with a sliding mode control approach is presented which enables the designer to make use of the Cuk converters advantages, while ameliorating control difficulties. This control method allows the selection of passive components based predominantly on ripple and reliability specifications while requiring only one state reference signal. This allows much smaller, more reliable non-electrolytic capacitors to be used. A prototype inverter has been constructed and results obtained which demonstrate the design flexibility of the Cuk topology when coupled with sliding mode control.
Resumo:
This paper presents preliminary results from an assessment of the barriers to adaptation to water supply shortage in a case study catchment in south east England with multiple supply companies. The investigation applies a conceptual framework, which distinguishes between generic barriers affecting the ability of supply companies to make adaptation decisions, and specific barriers to the implementation of each option. The preliminary analysis suggests that whilst there is a widespread awareness of the challenge of climate change, and a conceptual understanding of the need for adaptation, some of the generic barriers that will affect detailed evaluations and actual adaptation decisions have yet to be approached. The analysis also shows that different individual adaptation options are assessed differently by different stakeholders, and that there are differences in the barriers to adoption between supply-side and demand-side measures. First, however, the paper develops the general conceptual framework for the characterisation of the barriers to adaptation used in the study.