941 resultados para Pedagogical project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The role of individuals in the innovation process is highlighted as system integrator and/or champion in literature, however, little is known about championing role of a project manager. Our contention is that the role of the project manager (PM) is essentially of a champion to enable innovation and achieve desired project performance in construction project environment. Hypothesizing that championing behaviour is determined by a number of individual and situational factors, which in turn effects on level of innovation and project performance, we used correlation and regression analysis to test the hypotheses. A survey was carried out with project managers and project team members in 32 building and civil engineering projects in Singapore to test the hypothesized relationships. The results corroborate the importance of championing behaviour to fostering innovation and achieve better project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research in construction innovation highlights construction industry as having many barriers and resistance to innovations and suggests that it needs champions. A hierarchical structural model is presented, to assess the impact of the role of the project manager (PM) on the levels of innovation and project performance. The model adopts the structural equation modelling technique and uses the survey data collected from PMs and project team members working for general contractors in Singapore. The model fits well to the observed data, accounting for 24%, 37% and 49% of the variance in championing behaviour, the level of innovation and project performance, respectively. The results of this study show the importance of the championing role of PMs in construction innovation. However, in order to increase their effectiveness, such a role should be complemented by their competency and professionalism, tactical use of influence tactics, and decision authority. Moreover, senior management should provide adequate resources and a sustained support to innovation and create a conducive environment or organizational culture that nurtures and facilitates the PM’s role in the construction project as a champion of innovation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Biosequestration of carbon in trees, forests and vegetation is a key method for offsetting greenhouse gas emissions. To facilitate it, the Commonwealth has introduced the Carbon Farming Initiative, a scheme whereby carbon credits can be earned for biosequestration offsets projects. The project proponent must acquire under state law a ‘carbon sequestration right’ which confers the benefit of the sequestered carbon on the land. Each State provides for an agreement associated with the carbon sequestration right between the landowner and the holder of the right (‘carbon sequestration agreement’). This article identifies some key risks and issues that must be considered in the drafting of a carbon sequestration agreement to support the successful operation of a biosequestration offsets project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Throughout the Asia Pacific Economic Cooperation (APEC) and across the world, riders and passengers of motorcycles and scooters are among the most vulnerable road users. There is considerably greater likelihood of death or injury from use of these vehicles compared with other motor vehicles. Such vulnerability is especially pertinent for economies that more often use motorcycles and scooters as a method of transportation. In developing effective countermeasures to reduce motorcycle and scooter death and injury across multiple regions consideration is required of various situational and socio-cultural factors that vary across APEC economies. The study presented here sought to understand important motorcycle and scooter safety issues across APEC economies and any current barriers that might exist in implementing potentially effective countermeasures. This is the first stage of a wider project which also includes a literature review and ultimately the production of a compendium to facilitate implementation of best practice countermeasures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Motorcyclists and scooter riders are among the most vulnerable road users, across APEC. This report assesses the potential road safety measures that can be used to address these issues and selects measures that could feasibly and effectively be implemented across the Asia Pacific Economic Communities (APEC). The scope of the report is confined to on-road motorcycle riding. While the numbers of injuries resulting from off-road riding (including as part of farm work) are likely to be substantial based on data from other states, many of the issues and measures to reduce trauma in off-road riding would be quite different. A previous report described important motorcycle and scooter safety issues across APEC economies and any current barriers that might exist in implementing potentially effective countermeasures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the growth in project management as a form of work organisation in many sectors of the economy has come the significant rise in the number of project managers and project team members. This change in work organisation brings issues in forging career paths and determining career support in work situations that are often dynamic, short lived and intense. In the relatively small but substantially robust Australian economy, a unique labour market and the tyranny of distance bring their own difficulties. Innovative and collaborative project structures and increasing prevalence of contract work provide both challenges and opportunities for new career pathways in many industries. A growing percentage of Australia's workforce is employed in project-based or project-oriented organisations, leading to the claim that Australia is a project-based economy. This provided a context for our research into the career paths and the issues of career management for project managers working in a project based economy. Using in-depth interviews with project managers from three industry areas we found generational and gender differences in experiences of work, workplace support and mentoring for career development. For a continued strong performance in this economy,organisations that employ project personnel will need to consider how they will ensure the supply of high quality project professionals into the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As sustainability becomes an important principle guiding various human activities around the globe, the higher education sector is being asked to take an active part in educating and promoting sustainability due to its moral responsibility, social obligation and its own needs to adapt to new circumstances. There is a global trend of higher education institutions embarking on responses to the sustainability challenge. On-campus building performance is one of the most important indicators for “sustainable universities”, because buildings carry substantially environmental burden such as considerable consumption of raw materials and energy as well as huge amount of waste generation and greenhouse gas emission. Plus, much research proves that building performance can impact on students and staff’s awareness about and behaviours related to sustainability. The past studies rarely discussed about sustainable construction projects in universities’ unique context. Universities are labeled with distinct characteristics such as complex governance, multiple cultures and juggling missions and so on. It is necessary and meaningful to examine the project management system in terms of universities’ organizational environment. Thus, this research project applies Delphi study to identify primary barriers to green technology application in on-campus buildings, critical factors for sustainable project success, key actions in project phases and strategies for project improvement. Through three rounds of questionnaires among panel experts, the authors obtain a profound understanding of project delivery system in universities. The research results are expected to provide sustainability practitioners with holistic understanding and generic information about sustainable construction project performance on campus as an assistance tool.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While entrepreneurship research has taken firm formation to be the predominant mode of opportunity exploitation, entrepreneurship can take place through many other types of organizational arrangements. In the present article, we consider one such alternative arrangement, namely the formation of inter-organizational projects (IOPs). We propose a multi-level contingency model that suggests that uncertainty both at the level of the firm and at the level of the environment makes the exploitation of opportunities through IOPs more likely. The model is tested by telephone survey data collected amongst a panel of 1725 SMEs and longitudinal industry data. Our findings provide strong support for the industry-level part of the model, but interestingly, only partial support for the firm level part of the model. This indicates that the effects of uncertainty need to be dissected into different levels of analysis to understand the conditions under which alternative modes of opportunity exploitation can be a prominent entrepreneurial alternative to new firm formation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report discusses the geologic framework and petroleum geology used to assess undiscovered petroleum resources in the Bohaiwan basin province for the 2000 World Energy Assessment Project of the U.S. Geological Survey. The Bohaiwan basin in northeastern China is the largest petroleum-producing region in China. Two total petroleum systems have been identified in the basin. The first, the Shahejie–Shahejie/Guantao/Wumishan Total Petroleum System, involves oil and gas generated from mature pods of lacustrine source rock that are associated with six major rift-controlled subbasins. Two assessment units are defined in this total petroleum system: (1) a Tertiary lacustrine assessment unit consisting of sandstone reservoirs interbedded with lacustrine shale source rocks, and (2) a pre-Tertiary buried hills assessment unit consisting of carbonate reservoirs that are overlain unconformably by Tertiary lacustrine shale source rocks. The second total petroleum system identified in the Bohaiwan basin is the Carboniferous/Permian Coal–Paleozoic Total Petroleum System, a hypothetical total petroleum system involving natural gas generated from multiple pods of thermally mature coal beds. Low-permeability Permian sandstones and possibly Carboniferous coal beds are the reservoir rocks. Most of the natural gas is inferred to be trapped in continuous accumulations near the center of the subbasins. This total petroleum system is largely unexplored and has good potential for undiscovered gas accumulations. One assessment unit, coal-sourced gas, is defined in this total petroleum system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is a summative evaluation of the Stronger Smarter Learning Communities (SSLC) project that examines whether and how the SSLC project had an impact on Australian state schools which adopted its models and approaches. Drawing from qualitative and quantitative data sets, it also presents the largest scale and most comprehensive analysis of Indigenous education practices and outcomes to date. It includes empirical findings on: success in changing school ethos and community engagement; challenges in progress at closure of the 'gap' in conventionally measured achievement and performance; schools' and principals' choices in curriculum and instruction; profiles of teachers' and principals' training and views on teacher education; and a strong emphasis on community and school Indigenoous voices and views on Indigenous education.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study was to evaluate aspects of participation in a participatory action research project, the Ashgrove Healthy School Environment Project. Participatory action research is a form of research that creates change as an explicit part of the research process and requires the active participation of those by and for whom the research is being conducted. This study arose from concems by this researcher, who is also a co-facilitator of the project, that levels of participation were not as extensive as one might have hoped and that this seemingly low level would have a negative impact on the continuing participation of those already involved. Specifically. this evaluation sought to uncover the reasons that prompted participation, to identify structural barriers to initial involvement and to uncover participants' perceptions of the process, including barriers and opportunities. It also sought to record evidence of any shift in decision making and to draw implications about the findings that could assist the project, the school, other schools and the wider community. This evaluation involved focus group discussions and interviews with participants actively involved in the school project. The purpose was to uncover their views, feelings and perceptions about their participation and the participatory processes in use generally. It also included some examination of school documents and newsletters and as also drawn on the reflections of this 'insider' researcher, based on two years of involvement in facilitating the project. The findings that emerge from this study are heartening. Rather than feeling anxious about the long-term sustainability of the project, this researcher now feels more confident about its achievements, both in terms of the changes that have occurred in the school and about the participatory processes and levels of participation. Whilst the evaluation has identified a number of barriers, both institutional, personal and project related, it has also identified several key factors that serve to promote participation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A fundamental proposition is that the accuracy of the designer's tender price forecasts is positively correlated with the amount of information available for that project. The paper describes an empirical study of the effects of the quantity of information available on practicing Quantity Surveyors' forecasting accuracy. The methodology involved the surveyors repeatedly revising tender price forecasts on receipt of chunks of project information. Each of twelve surveyors undertook two projects and selected information chunks from a total of sixteen information types. The analysis indicated marked differences in accuracy between different project types and experts/non-experts. The expert surveyors' forecasts were not found to be significantly improved by information other than that of basic building type and size, even after eliminating project type effects. The expert surveyors' forecasts based on the knowledge of building type and size alone were, however, found to be of similar accuracy to that of average practitioners pricing full bills of quantities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes an analysis of construction project bids to determine (a) the global distribution and (b) factors influencing the distribution of bids. The global distribution of bids was found, by using a battery of ll test statistics, to be approximated by a three-parameter log normal distribution. No global spread parameter was found. A multivariate analysis revealed the year of tender to be the major influencing factor. Consideration of the construction order, tender price and output indices lead to the conclusion that distributional spread reflected the degree of difference in pricing policies between bidders and the skewness of the distributions reflected the degree of competition. The paper concludes with a tentative model of the causal relationships between the factors and distributional characteristics involved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

QUT Linking Karumba Project This exhibition showcases the work of 3rd -4th year undergraduate landscape architecture, architecture, Industrial Design, Environmental Engineering, Civil Engineering students in response to issues of sustainability in the Gulf of Carpentaria town of Karumba. It presented the final, polished set of work to the Karumba and Carpentaria Shire community, following revisions in line with feedback from the 2008 exhibition. 16 students and four staff set off on a 2488km journey to undertake the first half of the Carpentaria Project: a fortnight-long strategic planning project entitled Linking Karumba to encourage social, economic, environmental and cultural linkages across the town. Karumba, along with the nearby town of Normanton, is one of Queensland’s most remote settlements. Its economy is based on fishing, tourism, and mining. It has two centres, 2.5km apart by river, or 9km by road. This physical disconnect was identified by Carpentaria Shire Council (CSC) and the Karumba Progress Association (KPA) as a source of socio-cultural disconnection, which formed the basis of our project brief. Student designs were highly responsive to the character of Karumba’s culture and environment, indicating remarkable levels of immersion, and attracting $830 000 in Qld. state government funding for implementation. The Exhibition Four groups of four students produced four strategic planning and design options toward this future: Make the Switch: Alice Anonuevo, Michael Marriott, Carla Priestley & Grant Harvey Realigning the Systems: Claudia Bergs, Rebecca Stephens, Anna Coulson & Lois Kerrigan Diversification of Experience: Rebecca North, Kyle Bush, Debra Sullivan & Jenna Green The River is the Main Street: Ashley Nicholson, Monica Kuiken, Dean Bowen & Bill Schild

Relevância:

20.00% 20.00%

Publicador:

Resumo:

QUT Learning and Teaching Unit QUT Grants Workshops 2. Undertaking a Successful Project The purpose of this workshop was to assist QUT grant recipients to make connections, identify synergies and build a sense of scholarly community with each other; leverage grants outwards and possibly upwards; share factors that should be considered to undertake a successful project. Presenter: Shannon Satherley. "Initial Planning = Flexibility, Sanity & Success (or at least honourable failure) 1. Top & Tail 2. Divide and Delineate 3. Communicate Clearly & Consistently"