885 resultados para Fixed-priority scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Studies have been carried out on the heat transfer in a packed bed of glass beads percolated by air at moderate flow rates. Rigorous statistic analysis of the experimental data was carried out and the traditional two parameter model was used to represent them. The parameters estimated were the effective radial thermal conductivity, k, and the wall coefficient, h, through the least squares method. The results were evaluated as to the boundary bed inlet temperature, T-o, number of terms of the solution series and number of experimental points used in the estimate. Results indicated that a small difference in T-o was sufficient to promote great modifications in the estimated parameters and in the statistical properties of the model. The use of replicas at points of high parametric information of the model improved the results, although analysis of the residuals has resulted in the rejection of this alternative. In order to evaluate cion-linearity of the model, Bates and Watts (1988) curvature measurements and the Box (1971) biases of the coefficients were calculated. The intrinsic curvatures of the model (IN) tend to be concentrated at low bed heights and those due to parameter effects (PE) are spread all over the bed. The Box biases indicated both parameters as responsible for the curvatures PE, h being somewhat more problematic. (C) 2000 Elsevier B.V. Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking into account sequence-dependent setup costs and times, and then adapted for rolling horizon use. A relax-and-fix (RF) solution heuristic is proposed and computationally tested against a high-performance MIP solver. Three variants of local search are also developed to improve the RF method and tested. Finally the solutions are compared with those currently practiced at the foundry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Minimizing the makespan of a flow-shop no-wait (FSNW) schedule where the processing times are randomly distributed is an important NP-Complete Combinatorial Optimization Problem. In spite of this, it can be found only in very few papers in the literature. By considering the Start Interval Concept, this problem can be formulated, in a practical way, in function of the probability of the success in preserve FSNW constraints for all tasks execution. With this formulation, for the particular case with 3 machines, this paper presents different heuristics solutions: by integrating local optimization steps with insertion procedures and by using genetic algorithms for search the solution space. Computational results and performance evaluations are commented. Copyright (C) 1998 IFAC.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a methodology to incorporate voltage/reactive representation to Short Term Generation Scheduling (STGS) models, which is based on active/reactive decoupling characteristics of power systems. In such approach STGS is decoupled in both Active (AGS) and Reactive (RGS) Generation Scheduling models. AGS model establishes an initial active generation scheduling through a traditional dispatch model. The scheduling proposed by AGS model is evaluated from the voltage/reactive points of view, through the proposed RGS model. RGS is formulated as a sequence of T nonlinear OPF problems, solved separately but taking into account load tracking between consecutive time intervals. This approach considerably reduces computational effort to perform the reactive analysis of the RGS problem as a whole. When necessary, RGS model is capable to propose active generation redispatches, such that critical reactive problems (in which all reactive variables have been insufficient to control the reactive problems) can be overcome. The formulation and solution methodology proposed are evaluated in the IEEE30 system in two case studies. These studies show that the methodology is robust enough to incorporate reactive aspects to STGS problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A standard (X) over bar chart for controlling the process mean takes samples of size no at specified, equally-spaced, fixed-time points. This article proposes a modification of the standard (X) over bar chart that allows one to take additional samples, bigger than no, between these fixed times. The additional samples are taken from the process when there is evidence that the process mean moved from target. Following the notation proposed by Reynolds (1996a) and Costs (1997) we shortly call the proposed (X) over bar chart as VSSIFT (X) over bar chart: where VSSIFT means variable sample size and sampling intervals with fixed times. The (X) over bar chart with the VSSIFT feature is easier to be administered than a standard VSSI (X) over bar chart that is not constrained to sample at the specified fixed times. The performances of the charts in detecting process mean shifts are comparable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)