858 resultados para Distribuição de energia elétrica
Resumo:
The protection and distribution systems for the electrics equipments are really important for the safety of products, process and final users, for an enterprise or even for a residence. For that, it’s necessary the utilization of low voltage switchboards for controlling the feeding of a charge, avoiding any kind of abnormality that can eventually occur. It’s necessary to pay attention in the cubicles conditions, and always verify if they are in accordance to the norms of the product, verifying also any kind of physical damage for the operator and/or users. In this line, the present graduation work analyses the low voltage switchboards in the college, checking if they are attending the actual standards, suggesting some improvements and later making a simulation of the creation of a new panel that reach all the needing in substitution of this actual, through the software Simaris. Using the research and lecture of norms and regulations for verifying the problems, this way we could register the greatest acting failures. These actions are made for becoming aware to the university about the danger in using electrics equipments without a minimum degree of protection, allowed by the law, and attempting to the urgency in changing this fails
Resumo:
This paper is about a case study of using solar energy and wind energy in a farm. For this purpose were collected from the property, such as water consumption and amount of residents. So, we estimate how many conventional panels or PET bottle panels and boiler needed to supply the farm with warm water. It also calculates the amount of photovoltaic panels and the main accessories for converting solar energy into electrical energy. For the pumping of water using photovoltaic panels is dismissed and dimensioned to be a watermill
Comissionamento de turbinas hidráulicas: ensaios de faixa operativa, índex, test e rejeição de carga
Resumo:
With growing electricty demand, the importance of generation through hydropower, a renewable energy source, it’s of great importance. This demand derives from the country’s growth, as well as events that will occur in the coming years. The commission has a crucial role before the entry into operation of hydroelectric plant, sice, ensures a good operation of hydraulic and electrical systems, as well as the safety of the installation. This paper is a case study, commissioning in a PCH in especially the most important tests, such as range operation, índex tes and load rejection. In these trials we can get a Idea of the actual behavior of the unit, as well as future operation maneuvers, and evidence of real efficiency
Resumo:
This paper is proposed the usage of an Organic Rankine Cycle (ORC) along with waste heat recovery from an inconstant heat source. This method of waste heat recovery with intermittent heat source is part of a technical viability study. This paper also brings up the usage of thermal energy storage as heat source for the ORC. This paper is based on a heat treatment company study in which a natural gas furnace is explored. Data such as mass flow, temperature and specific waste gas heat from this furnace are used through calculations. Calculations are made also based on furnace cycles. This viability study considers a series of working fluids such as ammonia, benzene, R113 and R134a. Results point out that ORC with out thermal storage and using refrigerant fluid ammonia is the best alternative
Resumo:
This work, based in a patent request at INPI, protocol no. 020110035974, presents a system development using solar panels to supply the electricity demand required by punctual loads, without a storage unit or utility grid synchronism, through a control circuit that allows parallel operation with the power grid during low sunlight incidence periods. A study about solar panel construction and topologies for Power generation was done, in a atempt to evalute impacts in project. This development was modular, providing the system the possibility of power capacity expansion and load diversity as well, in an attempt to reduce the total energy requirements from the residential sector drained from the power grid along the day
Resumo:
With the increasing demand for electricity, the retraining of transmission lines is necessary despite environmental restrictions and crossings in densely populated areas to build new transmission and distribution lines. Solution is reuse the existent cables, replacing the old conductor cables for new cables with higher capacity power transmission, and control of sag installed. The increasing demand for electrical power has increased the electric current on the wires and therefore, it must bear out temperatures of 150°C or more, without the risk of the increasing sag beyond the established limits. In the case of long crossings or densely populated areas, sag is due to high weight of the cable on clearance. The cable type determines the weight, sag, height and the towers dimensions, which are the items that most influence the investment of the transmission line. Hence, to reduce both cost of investment and maintenance of the line, the use of a lighter cable can reduce both number and the height of the towers, with financial return on short and long term. Therefore, in order to increase the amount of transmitted energy and reduce the number of built towers and sag, is recommended in the current work substitute the current core material (steel or aluminium) for alternatives alloys or new materials, in this case a composite, which has low density, elevated stiffness (elasticity module), thus apply the pultruded carbon fiber with epoxy resin as matrix systems and perform the study of the kinetics of degradation by thermogravimetric analysis (TGA), dynamic mechanical analysis (DMA) and differential scanning calorimetry (DSC), according to their respective standards
Resumo:
Recently, research on energy harvesting has increased substantially. Many researchers have concentrated their efforts to find the best configuration for these systems and to optimize their output power. In the process of energy harvesting, the electric energy is obtained by converting mechanics energy created by an environment vibration source by a transducer, for example, a thin piezoceramic film. That vibration source is, for example, a beam suffering some mechanic force able to generate a vibration in it, an oscillating beam is the best properly used example. Different mechanisms of electromechanical coupling have been developed to harvesting devices, and a particular interest has been given to the use of models that transform the mechanical vibration into electrical current using a piezoelectric element. In this paper we propose a model to energy harvesting from vibrations, from an oscillating beam, including non-linearities in the piezoelectric coupling and a non-ideal excitation in the material. From this model, it was developed a system to obtain some results about the harvested power by the material. It was demonstrated that the power captured was influenced by the effect of the nonlinearities of the piezoelectric coupling, modifying the system dynamic behavior
Resumo:
The electrical substations have the goal to transmit, distribute and change the characteristics of electrical energy transmission networks of dealers to the end user with a high rate of reliability and continuously. For this it’s necessary to accomplish a gathering of datas from the local dealers where will be installed the substation to make a good electric project. This work has the objective to gather all the contents relatives to electric project of substation that are scattered in the literature, in order to organize and develop a basic guide that presents a methodology to dimension electrical equipments that belong to an industrial substation at 15 kV. In addition to elaborate a basic guide, this work aids to specify electrical equipments installed in the substation, bringing information and comparisons to know and determinate the kind of equipments that will be used, in a correct and coherent way with the national and international rules. Ultimately, after determined, got and specified all the equipments that belongs to an industrial substation, the work mention in global manner how to calculate the dimension of substation physical arrangement, determining all the least and required dimensions of each cubicle
Resumo:
Concerns about the quality of groundwater have been continuously rising, considering its importance for the public water supply in the State of São Paulo, and even more due to the impact that anthropic action has been causing to the original quality of that natural resource. It is extremely relevant to identify the contamination focuses along the aquifers of the State of São Paulo. This report aims to evaluate nitrates and fluorides concentrations along the aquifers present in the state, in order to identify places where change in the quality of groundwater is observed, through the comparison between measured concentrations and reference values, such as: “Intervention Value” (maximum allowed value) and “Alert Value” (attention required value). To perform this research, a full compilation and organization has been done on chemical analysis data from the “Sistema de Informações de Águas Subterrâneas - SIDAS”, made available by the “Divisão de Procedimentos de Outorga – DPO” of the “Departamento de Água e Energia Elétrica – DAEE”. This work has made possible the build-up of a database composed by 6,860 wells, with analytical data ready to be interpreted, containing information about water pH, electrical conductivity, hardness and chloride, iron, fluoride, nitrogen, nitrates and total dissolved solids concentrations. This database shows concentration data for nitrates (6,157 wells) and fluoride (3,316 wells). From this information, maps for nitrates and fluorides concentration distributions have been made, by each aquifer and each “Unidade de Gerenciamento de Recursos Hídricos – UGRHI”, which has enabled the identification of wells where the concentrations of these chemical compounds exceeds the reference values. Concerning nitrates, these analysis indicated the existence of contamination sources from rural and urban zones, mostly present in the west region... (Complete abstract click electronic access below)
Resumo:
Pós-graduação em Engenharia Elétrica - FEB
Resumo:
This paper aims at comparing the national and international incentive policies in energy efficiency investment and presenting the main trends, measures adopted and economical and environmental results obtained, as well as possible improvements and expansions of these programs. This analysis is justified by the current moment, not only of the Brazilian Power Systems (SEB) but also of the global power systems with the constant increase of demand and depletion of natural resources implying in a need of a better use of them and of the power they generate, which directly affects the losses on the generation, transmission, distribution and consumption of energy, in addition to reducing the impacts on the environment. At last but not least, through this study it was possible to gleam not only at new possible ways for these programs, but also failures and inefficiencies that can be improved in the measures currently being used
Resumo:
Introduces technical, economic and environmentally competitive solutions in the energy market is a great challenge for society. This work examines each of these aspects considering the production of electrolytic hydrogen with energy from wind power, solar and hydropower, in order to ensure an overview of this energy carrier. Initially, an assessment of the technical aspects is made addressing existing electrolysers technologies, its main characteristics and differences. The geographical distribution of wind, solar and hydroelectric potential in Brazil is also mapped, and a configuration scheme of a hydrogen production system is discussed. Subsequently, the economic analysis calculates the cost of investment in the alkaline electrolyser of 60 Nm³ / h, similar to the Brazilian bus powered by hydrogen project, coordinated by EMTU. Since the main input of electrolysis is electricity, is analyzed the latest energy auctions of each primary source and it is calculated the cost of production of the wind, solar and hydropower hydrogen. Postponed to this, are investigated the intrinsic environmental impacts of electricity generation process, proposing a readjustment of an indicator of ecological efficiency for the production of hydrogen. Finally, the work discusses the concept of externalities and demonstrates how the incorporation of external costs can leverage the hydrogen economy. In short, it is evident that the wind and hydroelectric hydrogens are more promising compared to solar hydrogen, whether in the economic aspect, because it achieved lower costs, whether in the environmental aspect, because it reached the highest ecological efficiency
Resumo:
Pós-graduação em Engenharia Civil e Ambiental - FEB
Resumo:
Pós-graduação em Engenharia Mecânica - FEG
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS