875 resultados para Cost of maintenance


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective: To assess from a health sector perspective the incremental cost-effectiveness of eight drug treatment scenarios for established schizophrenia. Method: Using a standardized methodology, costs and outcomes are modelled over the lifetime of prevalent cases of schizophrenia in Australia in 2000. A two-stage approach to assessment of health benefit is used. The first stage involves a quantitative analysis based on disability-adjusted life years (DALYs) averted, using best available evidence. The robustness of results is tested using probabilistic uncertainty analysis. The second stage involves application of 'second filter' criteria (equity, strength of evidence, feasibility and acceptability) to allow broader concepts of benefit to be considered. Results: Replacing oral typicals with risperidone or olanzapine has an incremental cost-effectiveness ratio (ICER) of A$48 000 and A$92 000/DALY respectively. Switching from low-dose typicals to risperidone has an ICER of A$80 000. Giving risperidone to people experiencing side-effects on typicals is more cost-effective at A$20 000. Giving clozapine to people taking typicals, with the worst course of the disorder and either little or clear deterioration, is cost-effective at A$42 000 or A$23 000/DALY respectively. The least cost-effective intervention is to replace risperidone with olanzapine at A$160 000/DALY. Conclusions: Based on an A$50 000/DALY threshold, low-dose typical neuroleptics are indicated as the treatment of choice for established schizophrenia, with risperidone being reserved for those experiencing moderate to severe side-effects on typicals. The more expensive olanzapine should only be prescribed when risperidone is not clinically indicated. The high cost of risperidone and olanzapine relative to modest health gains underlie this conclusion. Earlier introduction of clozapine however, would be cost-effective. This work is limited by weaknesses in trials (lack of long-term efficacy data, quality of life and consumer satisfaction evidence) and the translation of effect size into a DALY change. Some stakeholders, including SANE Australia, argue the modest health gains reported in the literature do not adequately reflect perceptions by patients, clinicians and carers, of improved quality of life with these atypicals.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of the study was to assess, from a health service perspective, whether a systematic program to modify kidney and cardiovascular disease reduced the costs of treating end-stage kidney failure. The participants in the study were 1,800 aboriginal adults with hypertension, diabetes with microalbuminuria or overt albuminuria, and overt albuminuria, living on two islands in the Northern Territory of Australia during 1995 to 2000. Perindopril was the primary treatment agent, and other medications were also used to control blood pressure. Control of glucose and lipid levels were attempted, and health education was offered. Evaluation of program resource use and costs for follow-up periods was done at 3 and 4.7 years. On an intention-to-treat basis, the number of dialysis starts and dialysis-years avoided were estimated by comparing the fate of the treatment group with that of historical control subjects, matched for disease severity, who were followed in the before the treatment program began. For the first three years, an estimated 11.6 person-years of dialysis were avoided, and over 4.7 years, 27.7 person-years of dialysis were avoided. The net cost of the program was $1,210 more per person per year than status quo care, and dialyses avoided gave net savings of $1.0 million at 3 years and $3.4 million at 4.6 years. The treatment program provided significant health benefit and impressive cost savings in dialysis avoided. (C) 2005 by the National Kidney Foundation, Inc.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background We compared cost-effectiveness of pravastatin in a placebo-controlled trial in 5500 younger (31-64 years) and 3514 older patients (65-74 years) with previous acute coronary syndromes. Methods Hospitalizations and long-term medication within the 6 years of the trial were estimated in all patients. Drug dosage, nursing home, and ambulatory care costs were estimated from substudies. Incremental costs per life saved of pravastatin relative to placebo were estimated from treatment effects and resource use. Results Over 6 years, pravastatin reduced all-cause mortality by 4.3% in the older patients and by 2.3% in the younger patients. Older patients assigned pravastatin had marginally lower cost of pravastatin and other medication over 6 years (A$4442 vs A$4637), but greater cost offsets (A$2061 vs. A$897) from lower rates of hospitalizations. The incremental cost per life saved with pravastatin was A$55500 in the old and A$167200 in the young. Assuming no treatment effect beyond the study period, the life expectancy to age 82 years of additional survivors was 9.1 years in the older and. 17.3 years in the younger. Estimated additional life-years saved from pravastatin therapy were 0.39 years for older and 0.40 years for younger patients. Incremental costs per life-year saved were A$7581 in the older and A$1.4944 in the younger, if discounted at 5% per annum. Conclusions Pravastatin therapy was more cost-effective among older than younger patients, because of their higher baseline risk and greater cost offsets, despite their shorter life expectancy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many maintenance managers find it difficult to justify investments in maintenance improvement initiatives. In part, this is due to a tendency by mine managers to regard maintenance purely as a cost centre, and not as a process able to influence productive capacity and profit. It is also hindered by a lack of alignment between commonly used maintenance performance measures and key business drivers, and the lack of formal business training amongst maintenance professionals. With this in mind, a model to assist maintenance managers in evaluating the benefits of maintenance improvement projects was recently formulated. The model considers four cost saving dimensions. These are: 1. reduction in the cost of unplanned repairs and maintenance, 2. increased or accelerated production and/or sales, 3. spares inventory reduction, and 4. reduction in over-investment in physical assets and operating costs. This paper discusses the application of this model and a number of numerical examples are given to justify investments in maintenance improvement projects having varying objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of the thesis was to analyse several process configurations for the production of electricity from biomass. Process simulation models using AspenPlus aimed at calculating the industrial performance of power plant concepts were built, tested, and used for analysis. The criteria used in analysis were performance and cost. All of the advanced systems appear to have higher efficiencies than the commercial reference, the Rankine cycle. However, advanced systems typically have a higher cost of electricity (COE) than the Rankine power plant. High efficiencies do not reduce fuel costs enough to compensate for the high capital costs of advanced concepts. The successful reduction of capital costs would appear to be the key to the introduction of the new systems. Capital costs account for a considerable, often dominant, part of the cost of electricity in these concepts. All of the systems have higher specific investment costs than the conventional industrial alternative, i.e. the Rankine power plant; Combined beat and power production (CUP) is currently the only industrial area of application in which bio-power costs can be considerably reduced to make them competitive. Based on the results of this work, AsperiPlus is an appropriate simulation platform. How-ever, the usefulness of the models could be improved if a number of unit operations were modelled in greater detail. The dryer, gasifier, fast pyrolysis, gas engine and gas turbine models could be improved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most parametric software cost estimation models used today evolved in the late 70's and early 80's. At that time, the dominant software development techniques being used were the early 'structured methods'. Since then, several new systems development paradigms and methods have emerged, one being Jackson Systems Development (JSD). As current cost estimating methods do not take account of these developments, their non-universality means they cannot provide adequate estimates of effort and hence cost. In order to address these shortcomings two new estimation methods have been developed for JSD projects. One of these methods JSD-FPA, is a top-down estimating method, based on the existing MKII function point method. The other method, JSD-COCOMO, is a sizing technique which sizes a project, in terms of lines of code, from the process structure diagrams and thus provides an input to the traditional COCOMO method.The JSD-FPA method allows JSD projects in both the real-time and scientific application areas to be costed, as well as the commercial information systems applications to which FPA is usually applied. The method is based upon a three-dimensional view of a system specification as opposed to the largely data-oriented view traditionally used by FPA. The method uses counts of various attributes of a JSD specification to develop a metric which provides an indication of the size of the system to be developed. This size metric is then transformed into an estimate of effort by calculating past project productivity and utilising this figure to predict the effort and hence cost of a future project. The effort estimates produced were validated by comparing them against the effort figures for six actual projects.The JSD-COCOMO method uses counts of the levels in a process structure chart as the input to an empirically derived model which transforms them into an estimate of delivered source code instructions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Healthcare providers and policy makers are faced with an ever-increasing number of medical publications. Searching for relevant information and keeping up to date with new research findings remains a constant challenge. It has been widely acknowledged that narrative reviews of the literature are susceptible to several types of bias and a systematic approach may protect against these biases. The aim of this thesis was to apply quantitative methods in the assessment of outcomes of topical therapies for psoriasis. In particular, to systematically examine the comparative efficacy, tolerability and cost-effectiveness of topical calcipotriol in the treatment of mild-to-moderate psoriasis. Over the years, a wide range of techniques have been used to evaluate the severity of psoriasis and the outcomes from treatment. This lack of standardisation complicates the direct comparison of results and ultimately the pooling of outcomes from different clinical trials. There is a clear requirement for more comprehensive tools for measuring drug efficacy and disease severity in psoriasis. Ideally, the outcome measures need to be simple, relevant, practical, and widely applicable, and the instruments should be reliable, valid and responsive. The results of the meta-analysis reported herein show that calcipotriol is an effective antipsoriatic agent. In the short-tenn, the pooled data found calcipotriol to be more effective than calcitriol, tacalcitol, coal tar and short-contact dithranol. Only potent corticosteroids appeared to have comparable efficacy, with less short-term side-effects. Potent corticosteroids also added to the antipsoriatic effect of calcipotriol, and appeared to suppress the occurrence of calcipotriol-induced irritation. There was insufficient evidence to support any large effects in favour of improvements in efficacy when calcipotriol is used in combination with systemic therapies in patients with severe psoriasis. However, there was a total absence of long-term morbidity data on the effectiveness of any of the interventions studied. Decision analysis showed that, from the perspective of the NHS as payer, the relatively small differences in efficacy between calcipotriol and short-contact dithranol lead to large differences in the direct cost of treating patients with mildto-moderate plaque psoriasis. Further research is needed to examine the clinical and economic issues affecting patients under treatment for psoriasis in the UK. In particular, the maintenance value and cost/benefit ratio for the various treatment strategies, and the assessment of patient's preferences has not yet been adequately addressed for this chronic recurring disease.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Central venous catheters have become an integral part of patient management however they are associated with many complications including infection. Despite efforts being made to reduce the incidence of such infect ions the problem continues to increase and has resource implications for the Health Service. Studies relating to the source of microorganisms causing CVC-associated infection, the cost of such infections and the efficacy of an antimicrobial catheter have been undertaken. Thirty patients who required a CVC as part of their medical management and underwent cardiac surgery had the distal tips of their catheters sampled whilst in situ. Sampling took place within 1 h of catheter placement. Bacteria were isolated from 16% of the catheter distal tips sampled in situ. The guidewires used to insert the devices were also contaminated (50%). When CVC were inserted via a protective sheath, avoiding contact with the skin. the incidence of microbial contamination was reduced. These findings suggest that despite rigorous skin disinfection and strict aseptic technique, viable microorganisms are impacted onto the distal tip of CVC during the insertion procedure. Needleless intravascular access devices have been introduced in order to reduce the incidence of need1estick injury. However, it was unclear whether such connectors would act as a portal of entry for microorganisms to CVC. The efficacy of these devices was investigated. Within the controlled laboratory environment it was demonstrated that needleless devices, when challenged with microorganisms, did not allow the passage of microbes when flu id was injected. This therefore suggested that the devices should not increase the risk of catheter colonisation. When used in clinical practice however microbial contamination of the needleless connectors was 55 % in comparison to the routinely used luer connectors (23%). The cost of infections associated with CVC was determined. Twenty patients catheterised with a CVC designed for long term use who were admitted to hospital with a presumptive diagnosis of catheter-related infection were studied. The treatment given specifically for this infection was costed. The mean cost of such an infection was £ 1781.81. Throughout the UK this may amount to £1.565.906 per annum. The cost of infections associated with CVC designed for short term use was estimated to be between 5 and 7 million pounds per annum in the UK. In an attempt to reduce both the incidence and cost of catheter- related infection antimicrobial CVC have been developed. The efficacy of a novel polyurethane CVC impregnated on both the internal and external catheter surface with the quaternary ammonium compound benzalkonium chloride was investigated. Eighty eight patients received an antimicrobial catheter and 78 patients a conventional polyurethane CVC. The anti-microbial CVC resulted in a reduction in microbial colonisation of the external and internal polymer surfaces as compared to the control device. The observed reduction in microbial colonisation with the anti-microbial CVC may decrease the likelihood of subsequent infection offering a useful approach to the prevention of catheter-related infections.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVE: To determine the accuracy, acceptability and cost-effectiveness of polymerase chain reaction (PCR) and optical immunoassay (OIA) rapid tests for maternal group B streptococcal (GBS) colonisation at labour. DESIGN: A test accuracy study was used to determine the accuracy of rapid tests for GBS colonisation of women in labour. Acceptability of testing to participants was evaluated through a questionnaire administered after delivery, and acceptability to staff through focus groups. A decision-analytic model was constructed to assess the cost-effectiveness of various screening strategies. SETTING: Two large obstetric units in the UK. PARTICIPANTS: Women booked for delivery at the participating units other than those electing for a Caesarean delivery. INTERVENTIONS: Vaginal and rectal swabs were obtained at the onset of labour and the results of vaginal and rectal PCR and OIA (index) tests were compared with the reference standard of enriched culture of combined vaginal and rectal swabs. MAIN OUTCOME MEASURES: The accuracy of the index tests, the relative accuracies of tests on vaginal and rectal swabs and whether test accuracy varied according to the presence or absence of maternal risk factors. RESULTS: PCR was significantly more accurate than OIA for the detection of maternal GBS colonisation. Combined vaginal or rectal swab index tests were more sensitive than either test considered individually [combined swab sensitivity for PCR 84% (95% CI 79-88%); vaginal swab 58% (52-64%); rectal swab 71% (66-76%)]. The highest sensitivity for PCR came at the cost of lower specificity [combined specificity 87% (95% CI 85-89%); vaginal swab 92% (90-94%); rectal swab 92% (90-93%)]. The sensitivity and specificity of rapid tests varied according to the presence or absence of maternal risk factors, but not consistently. PCR results were determinants of neonatal GBS colonisation, but maternal risk factors were not. Overall levels of acceptability for rapid testing amongst participants were high. Vaginal swabs were more acceptable than rectal swabs. South Asian women were least likely to have participated in the study and were less happy with the sampling procedure and with the prospect of rapid testing as part of routine care. Midwives were generally positive towards rapid testing but had concerns that it might lead to overtreatment and unnecessary interference in births. Modelling analysis revealed that the most cost-effective strategy was to provide routine intravenous antibiotic prophylaxis (IAP) to all women without screening. Removing this strategy, which is unlikely to be acceptable to most women and midwives, resulted in screening, based on a culture test at 35-37 weeks' gestation, with the provision of antibiotics to all women who screened positive being most cost-effective, assuming that all women in premature labour would receive IAP. The results were sensitive to very small increases in costs and changes in other assumptions. Screening using a rapid test was not cost-effective based on its current sensitivity, specificity and cost. CONCLUSIONS: Neither rapid test was sufficiently accurate to recommend it for routine use in clinical practice. IAP directed by screening with enriched culture at 35-37 weeks' gestation is likely to be the most acceptable cost-effective strategy, although it is premature to suggest the implementation of this strategy at present.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Energy price is related to more than half of the total life cycle cost of asphalt pavements. Furthermore, the fluctuation related to price of energy has been much higher than the general inflation and interest rate. This makes the energy price inflation an important variable that should be addressed when performing life cycle cost (LCC) studies re- garding asphalt pavements. The present value of future costs is highly sensitive to the selected discount rate. Therefore, the choice of the discount rate is the most critical element in LCC analysis during the life time of a project. The objective of the paper is to present a discount rate for asphalt pavement projects as a function of interest rate, general inflation and energy price inflation. The discount rate is defined based on the portion of the energy related costs during the life time of the pavement. Consequently, it can reflect the financial risks related to the energy price in asphalt pavement projects. It is suggested that a discount rate sensitivity analysis for asphalt pavements in Sweden should range between –20 and 30%.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The utilization of solar energy by photovoltaic (PV) systems have received much research and development (R&D) attention across the globe. In the past decades, a large number of PV array have been installed. Since the installed PV arrays often operate in harsh environments, non-uniform aging can occur and impact adversely on the performance of PV systems, especially in the middle and late periods of their service life. Due to the high cost of replacing aged PV modules by new modules, it is appealing to improve energy efficiency of aged PV systems. For this purpose, this paper presents a PV module reconfiguration strategy to achieve the maximum power generation from non-uniformly aged PV arrays without significant investment. The proposed reconfiguration strategy is based on the cell-unit structure of PV modules, the operating voltage limit of gird-connected converter, and the resulted bucket-effect of the maximum short circuit current. The objectives are to analyze all the potential reorganization options of the PV modules, find the maximum power point and express it in a proposition. This proposition is further developed into a novel implementable algorithm to calculate the maximum power generation and the corresponding reconfiguration of the PV modules. The immediate benefits from this reconfiguration are the increased total power output and maximum power point voltage information for global maximum power point tracking (MPPT). A PV array simulation model is used to illustrate the proposed method under three different cases. Furthermore, an experimental rig is built to verify the effectiveness of the proposed method. The proposed method will open an effective approach for condition-based maintenance of emerging aging PV arrays.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study explores patients’ needs in rural Thanjavur, southern India through understanding how people with diabetes choose providers and perceive care-seeking experience. To measure perception, the study surveyed people regarding six common barriers to care-seeking behavior, selected from both literature and local expert interview. Ninety-one percent of the sampled population goes to public or private allopathic providers out of the six presented providers. The low socioeconomic group and people with more complications or comorbidities are more likely to go to private allopathic providers. What is more, there is no difference between public and private allopathic providers in patients’ perception of care except for perceived cost. Positive perceptions in both providers are very common except for perceptions in blood-sugar management, distance to facilities, and cost of care. Sixty-six percent of patients perceived their blood-sugar control to fluctuate or have no change versus improved control. Twenty-seven percent of patients perceived the distance to facilities as unreasonable, and sixty-two percent of patients perceived the cost as high for them. The results suggest that cost may affect low socioeconomic people’s choice of care significantly. However, for people in middle and higher socioeconomic groups, cost does not appear to be a major factor. For qualitative text analyses, physician’s behavior and reputation emerge as themes, which require further studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

RATIONALE: Limitations in methods for the rapid diagnosis of hospital-acquired infections often delay initiation of effective antimicrobial therapy. New diagnostic approaches offer potential clinical and cost-related improvements in the management of these infections. OBJECTIVES: We developed a decision modeling framework to assess the potential cost-effectiveness of a rapid biomarker assay to identify hospital-acquired infection in high-risk patients earlier than standard diagnostic testing. METHODS: The framework includes parameters representing rates of infection, rates of delayed appropriate therapy, and impact of delayed therapy on mortality, along with assumptions about diagnostic test characteristics and their impact on delayed therapy and length of stay. Parameter estimates were based on contemporary, published studies and supplemented with data from a four-site, observational, clinical study. Extensive sensitivity analyses were performed. The base-case analysis assumed 17.6% of ventilated patients and 11.2% of nonventilated patients develop hospital-acquired infection and that 28.7% of patients with hospital-acquired infection experience delays in appropriate antibiotic therapy with standard care. We assumed this percentage decreased by 50% (to 14.4%) among patients with true-positive results and increased by 50% (to 43.1%) among patients with false-negative results using a hypothetical biomarker assay. Cost of testing was set at $110/d. MEASUREMENTS AND MAIN RESULTS: In the base-case analysis, among ventilated patients, daily diagnostic testing starting on admission reduced inpatient mortality from 12.3 to 11.9% and increased mean costs by $1,640 per patient, resulting in an incremental cost-effectiveness ratio of $21,389 per life-year saved. Among nonventilated patients, inpatient mortality decreased from 7.3 to 7.1% and costs increased by $1,381 with diagnostic testing. The resulting incremental cost-effectiveness ratio was $42,325 per life-year saved. Threshold analyses revealed the probabilities of developing hospital-acquired infection in ventilated and nonventilated patients could be as low as 8.4 and 9.8%, respectively, to maintain incremental cost-effectiveness ratios less than $50,000 per life-year saved. CONCLUSIONS: Development and use of serial diagnostic testing that reduces the proportion of patients with delays in appropriate antibiotic therapy for hospital-acquired infections could reduce inpatient mortality. The model presented here offers a cost-effectiveness framework for future test development.