751 resultados para Construction industry -- Management -- Handbooks, manuals, etc.
Resumo:
The Interdisciplinary Design for the Built Environment (IDBE) Masters program offers practicing professionals a structured process of interdisciplinary education and professional development. The course aims to equip all its students with the skills needed to meet these challenges. Most of those taking the course have demonstrated their abilities in their core disciplines and are moving to strategic and leadership roles for which they may well be under-prepared. The objectives of the course include giving students a strategic overview of the construction industry and of the production and management of built environment, as well as a critical perspective on the everyday knowledge and assumptions made in practice. The course also raises awareness of current research in the sector and its potential and limitations, and provides an introduction to professional ethics and the responsibilities owed by engineers and their colleagues to society as a whole.
Resumo:
Sir John Egan’s 1998 report on the construction industry (Construction Task Force 1998) noted its confrontational and adversarial nature. Both the original report and its subsequent endorsement in Accelerating Change (Strategic Forum 2002) called for improved working relationships—so-called ‘integration’—within and between both design and construction aspects. In this paper, we report on our observations of on-site team meetings for a major UK project during its construction phase. We attended a series of team meetings and recorded the patterns of verbal interaction that took place within them. In reporting our findings, we have deliberately used a graphical method for presenting the results, in the expectation that this will make them more readily accessible to designers. Our diagrams of these interaction patterns have already proved to be intuitively and quickly understood, and have generated interest and discussion among both those we observed and others who have seen them. We noted that different patterns of communication occurred in different types of meetings. Specifically, in the problem-solving meeting, there was a richness of interaction that was largely missing from progress meetings and technical meetings. Team members expressed greater satisfaction with this problem-solving meeting where these enriched exchanges took place. By making comparisons between the different patterns, we are also able to explore functional roles and their interactions. From this and other published evidence, we conclude that good teamworking practices depend on a complex interplay of relations and dependencies embedded within the team.
Resumo:
Construction industry is a sector that is renowned for the slow uptake of new technologies. This is usually due to the conservative nature of this sector that relies heavily on tried and tested and successful old business practices. However, there is an eagerness in this industry to adopt Building Information Modelling (BIM) technologies to capture and record accurate information about a building project. But vast amounts of information and knowledge about the construction process is typically hidden within informal social interactions that take place in the work environment. In this paper we present a vision where smartphones and tablet devices carried by construction workers are used to capture the interaction and communication between workers in the field. Informal chats about decisions taken in the field, impromptu formation of teams, identification of key persons for certain tasks, and tracking the flow of information across the project community, are some pieces of information that could be captured by employing social sensing in the field. This information can not only be used during the construction to improve the site processes but it can also be exploited by the end user during maintenance of the building. We highlight the challenges that need to be overcome for this mobile and social sensing system to become a reality. © 2012 ACM.
Resumo:
This book will be of particular interest to academics, researchers, and graduate students at universities and industrial practitioners seeking to apply mobile and pervasive computing systems to improve construction industry productivity.
Resumo:
Construction of geotechnical structures produces various environmental impacts. These include depletion of limited natural resources, generation of wastes and harmful substances during material productions and construction, ineffective usage of energy during processing of raw materials into construction materials, and emissions of unwanted gasses during transportation of materials and usage of equipments. With increasing interests in sustainability at the global scale, there is a need to develop a methodology that can assess environmental impacts at such scale for geotechnical construction. Using embodied energy and gas emission, quantitative measures of environmental impact are evaluated using a case study of a new high speed railway line construction in the UK. Based on the results, the keys to energy savings are (a) to optimise the usage of materials with high embodied energy intensity value (b) to optimise the transportation network and logistics for processes using primarily low embodied energy intensity materials and (c) to reuse as much materials on-site as possible to minimise the quantity of spoils or distance to disposal sites. The evaluated embodied energy and embodied carbon values are compared to those of other types of structures and of other activities and carbon tax values. Such comparisons can be used to discuss among various interested parties (clients, contractors, consultants, policy makers, etc) to make the construction industry more energy efficient. © Springer Science+Business Media B.V. 2011.
Resumo:
BACKGROUND: While smoking is the major cause of chronic obstructive pulmonary disease (COPD), occupational exposures to vapors, gases, dusts, and fumes (VGDF) increase COPD risk. This case-control study estimated the risk of COPD attributable to occupational exposures among construction workers. METHODS: The study population included 834 cases and 1243 controls participating in a national medical screening program for older construction workers between 1997 and 2013. Qualitative exposure indices were developed based on lifetime work and exposure histories. RESULTS: Approximately 18% (95% CI = 2-24%) of COPD risk can be attributed to construction-related exposures, which are additive to the risk contributed by smoking. A measure of all VGDF exposures combined was a strong predictor of COPD risk. CONCLUSIONS: Construction workers are at increased risk of COPD as a result of broad and complex effects of many exposures acting independently or interactively. Control methods should be implemented to prevent worker exposures, and smoking cessation should be promoted.
Resumo:
The overall intent of this research is to provide architects with information that can be used to improve their performance so as to optimally satisfy the client's requirements and achieve high-quality overall project performance in Nigerian construction industry. Architect performance criteria were identified based on literature within the domain of architect responsibilities. The assessment of architects’ performance was carried out through a questionnaire survey of clients of recently completed building projects in Nigeria. Analysis of data includes comparison of criteria using importance–performance index analysis. Factor analysis was carried out on criteria where architects are falling below average, to group and explore the latent structure of the criteria in the data. The results showed that the architect needs to focus on management skills and ability, buildability, design quality, project communication, project integration and client focus. These results would encourage architects to perform better within their full responsibilities in the building delivery process and deliver high-quality projects within Nigerian construction industry.
Resumo:
Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.
Resumo:
Purpose - To identify the critical factors causing construction disputes in Small to Medium Enterprises (SMEs) in Ireland during the recent recession period of 2007 to 2013.
Design/Methodology/Approach - A mixed method approach incorporating a literature review, case studies and questionnaire survey, with results analysed using exploratory (data reduction) factor analysis.
Findings - The results indicate seven core critical factors which result in construction disputes in SMEs in Ireland during a recession: Payment and extras; Physical work conditions; Poor financial/legal practise; Changes to the agreed scope of works; Time overrun; Defects; and Requests for increase in speed of project and long-term defects.
Research Limitations/Implications - With Ireland emerging from the current economic recession and the prevalence of SMEs to the construction sector, it is essential to document the core critical factors of construction disputes which emerge within this particular segment of the built environment.
Practical Implications - To address the adversarial nature of the construction sector and the prevalence of SMEs, it is essential to identify and document the critical factors of construction disputes within this remit. It is envisaged that the results of this research will be acknowledged, and the recommendations adopted, by construction SMEs, particularly within Ireland, as they emerge from the economic recession.
Originality/Value - This paper fulfils a gap in knowledge with the emergence of the economic recession and the identification of critical factors of construction dispute within SMEs in the Irish construction industry.
Resumo:
In comparison to the rest of the United Kingdom (UK) the Northern Irish Construction Industry was disproportionately affected by the recent economic recession. During this period, use of the New Engineering Contract (NEC) has proliferated in the public sector, however no study has been undertaken to examine the impact of the recession on this contract in Northern Ireland. The aim of this paper is to explore NEC contract implementation in Northern Ireland and the impact of the recession on its operation. A qualitative methodology is adopted using a literature review and semi structured interviews with six construction professionals. A qualitative analysis identifies themes and issues arising exploring connections and links between them using thematic coding. The initial findings are that the introduction of the NEC contract in Northern Ireland makes demands of contractors and consultants in terms of additional resources and training. Some consultants show a clear lack of understanding of the contract and its provisions. Whilst there is general agreement that the contract does help to stimulate good project management, the interviewees find the contract time consuming and complicated to administer, describing it as “unforgiving for the architect and unforgiving to the contractor.” Due to the impact of the recession, both contractors and consultants are still reporting a drop in income from pre-recession levels. Project resourcing levels have dropped significantly since the onset of the recession. Adversarial and opportunistic behaviour has increased. Many consultants and contractors are struggling to adequately administer the NEC contract at current income levels. The introduction of the NEC contract and the economic recession have exerted opposing forces on the implementation of the contract, hindering its execution. As the pressures exerted by the economic recession abate and a greater understanding of the contract develops, these opposing forces will ease leading to a more consistent implementation of the contract.
Resumo:
The importance of inter-organizational trust to project success has been increasingly highlighted in the construction industry. This study aims to explore the role of trust between project parties. It adopts a combination of quantitative and qualitative methodologies. Based on the analysis of the responses of a questionnaire survey, trust is demonstrated to have a significant contribution to the development of cooperative or collaborative relationships; fostering trust proves to have a major influence on the improvement of project performance; and some relationship and performance indicators are found to have closer associations with trust than others so that trust is more important to
the development of relationship and the improvement of performance in these aspects. The analysis of questionnaire responses also provides significant evidence for the reduction in monitoring and control following the increase of mutual trust. The questionnaire survey is followed by a series of expert interviews, both of which contribute to the establishment of a model that links trust with relationship and performance and distinguishes the new approach that is based on trust from the traditional mechanism that relies on monitoring and control.
Resumo:
Bridge construction responds to the need for environmentally friendly design of motorways and facilitates the passage through sensitive natural areas and the bypassing of urban areas. However, according to numerous research studies, bridge construction presents substantial budget overruns. Therefore, it is necessary early in the planning process for the decision makers to have reliable estimates of the final cost based on previously constructed projects. At the same time, the current European financial crisis reduces the available capital for investments and financial institutions are even less willing to finance transportation infrastructure. Consequently, it is even more necessary today to estimate the budget of high-cost construction projects -such as road bridges- with reasonable accuracy, in order for the state funds to be invested with lower risk and the projects to be designed with the highest possible efficiency. In this paper, a Bill-of-Quantities (BoQ) estimation tool for road bridges is developed in order to support the decisions made at the preliminary planning and design stages of highways. Specifically, a Feed-Forward Artificial Neural Network (ANN) with a hidden layer of 10 neurons is trained to predict the superstructure material quantities (concrete, pre-stressed steel and reinforcing steel) using the width of the deck, the adjusted length of span or cantilever and the type of the bridge as input variables. The training dataset includes actual data from 68 recently constructed concrete motorway bridges in Greece. According to the relevant metrics, the developed model captures very well the complex interrelations in the dataset and demonstrates strong generalisation capability. Furthermore, it outperforms the linear regression models developed for the same dataset. Therefore, the proposed cost estimation model stands as a useful and reliable tool for the construction industry as it enables planners to reach informed decisions for technical and economic planning of concrete bridge projects from their early implementation stages.
Resumo:
Building Information Modelling (BIM) is continuing to evolve and develop as the construction industry progresses towards level 2 maturity. However, one of the core barriers in this progression is the aspect of interoperability between software packages. This research and paper stems from a Knowledge Transfer Partnership (KTP) where both industry and academia come together to address this shortcoming within the sector. One of the core objectives of this partnership and the aim of this study is investigating potential solutions to this barrier, while also developing best working practices to be applied in industry. Using one of the case studies from this partnership (a temporary steel structure), this paper demonstrates a potential solution to addressing interoperability within structural analysis and detailing packages, MasterSeries and Revit respectively. The findings of the research indicate that a process based approach rather than that of additional software coding as being the preferred solution. The results of this preliminary research will aid in the development of the topic of interoperability within the sector, while also developing the knowledge and competencies of the parties within the KTP. The findings are explored further, by providing an overview of the resolution process adopted in this case study, in overcoming the interoperability that arose as the project progressed. It is envisaged that this study will assist the construction sector and its adoption of BIM technologies, while also addressing the critical aspect of operability between software.