763 resultados para Agency costs
Resumo:
The European Union Agency for Fundamental Rights (FRA), the EU body responsible for advising EU institutions on fundamental rights, is equipped with a Fundamental Rights Platform (FRP) to ensure an on-going and structured exchange of information and feedback between the FRA and Civil Society. When the FRA was founded in 2007, there was little pre-existing knowledge on how to design such a Platform; hence, the development of the relationship between the FRA and Civil Society over the first five years proved an interesting experiment. Although the Platform was never intended as a mechanism of democratic co-decision making, it is far more than a loose marketplace where Civil Society actors across the spectrum of fundamental rights themes gather. The Platform offers channels of consultation and exchange not only among the participants but also with the FRA. It allows for cross-pollination, ensuring informed grassroots input into FRA work and FRA expertise flow to Civil Society actors. This synergetic relationship builds upon both the self-organising forces of Civil Society and the terms of references of the FRP as defined by the FRA. The Platform allows to find a certain unity in the remarkable diversity of fundamental rights voices. To what degree, however, the Platform’s dynamics allow the transformation of sometimes ‘compartmentalised’ single human rights discussions into wider trans-sectoral and transnational debates within the Human Rights Community depends on the motivation and the interest(s) of the different Civil Society players.
Resumo:
The effort expended on reproduction may entail future costs, such as reduced survival or fecundity, and these costs can have an important influence on life-history optimization. For birds with precocial offspring, hypothesized costs of reproduction have typically emphasized nutritional and energetic investments in egg formation and incubation. We measured seasonal survival of 3856 radio-marked female Mallards (Anas platyrhynchos) from arrival on the breeding grounds through brood-rearing or cessation of breeding. There was a 2.5-fold direct increase in mortality risk associated with incubating nests in terrestrial habitats, whereas during brood-rearing when breeding females occupy aquatic habitats, mortality risk reached seasonal lows. Mortality risk also varied with calendar date and was highest during periods when large numbers of Mallards were nesting, suggesting that prey-switching behaviors by common predators may exacerbate risks to adults in all breeding stages. Although prior investments in egg laying and incubation affected mortality risk, most relationships were not consistent with the cost of reproduction hypothesis; birds with extensive prior investments in egg production or incubation typically survived better, suggesting that variation in individual quality drove both relationships. We conclude that for breeding female Mallards, the primary cost of reproduction is a fixed cost associated with placing oneself at risk to predators while incubating nests in terrestrial habitats.
Resumo:
The basic premise of transaction-cost theory is that the decision to outsource, rather than to undertake work in-house, is determined by the relative costs incurred in each of these forms of economic organization. In construction the "make or buy" decision invariably leads to a contract. Reducing the costs of entering into a contractual relationship (transaction costs) raises the value of production and is therefore desirable. Commonly applied methods of contractor selection may not minimise the costs of contracting. Research evidence suggests that although competitive tendering typically results in the lowest bidder winning the contract this may not represent the lowest project cost after completion. Multi-parameter and quantitative models for contractor selection have been developed to identify the best (or least risky) among bidders. A major area in which research is still needed is in investigating the impact of different methods of contractor selection on the costs of entering into a contract and the decision to outsource.
Resumo:
The costs of procurement are transaction costs which are separate from the direct costs of a project. In this paper discussion is concentrated on costs of tendering. Types of cost, including money costs and opportunity costs, short-term and long-term costs, private and social costs are defined and examined in relation to various types of product and methods of procurement. The costs of the contractor and of the client are considered and tentative conclusions drawn as to who bears these costs in the short-run and in the long run. They may fall on the parties to the process for the particular project, on other contractors and clients or on society as a whole.
Resumo:
The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.