631 resultados para Admiraçión Operum Dey


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Completing projects faster than the normal duration is always a challenge to the management of any project, as it often demands many paradigm shifts. Opportunities of globalization, competition from private sectors and multinationals force the management of public sector organizations in the Indian petroleum sector to take various aggressive strategies to maintain their profitability. Constructing infrastructure for handling petroleum products is one of them. Moreover, these projects are required to be completed in faster duration compared to normal schedules to remain competitive, to get faster return on investment, and to give longer project life. However, using conventional tools and techniques of project management, it is impossible to handle the problem of reducing the project duration from a normal period. This study proposes the use of concurrent engineering in managing projects for radically reducing project duration. The phases of the project are accomplished concurrently/simultaneously instead of in a series. The complexities that arise in managing projects are tackled through restructuring project organization, improving management commitment, strengthening project-planning activities, ensuring project quality, managing project risk objectively and integrating project activities through management information systems. These would not only ensure completion of projects in fast track, but also improve project effectiveness in terms of quality, cost effectiveness, team building, etc. and in turn overall productivity of the project organization would improve.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The existing method of pipeline monitoring, which requires an entire pipeline to be inspected periodically, wastes time and is expensive. A risk-based model that reduces the amount of time spent on inspection has been developed. This model not only reduces the cost of maintaining petroleum pipelines, but also suggests an efficient design and operation philosophy, construction method and logical insurance plans.The risk-based model uses analytic hierarchy process, a multiple attribute decision-making technique, to identify factors that influence failure on specific segments and analyze their effects by determining the probabilities of risk factors. The severity of failure is determined through consequence analysis, which establishes the effect of a failure in terms of cost caused by each risk factor and determines the cumulative effect of failure through probability analysis.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Time, cost and quality are the prime objectives of any project. Unfortunately, today’s project management does not always ensure the realisation of these objectives. The main reasons of project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation, under-estimation and mis-estimation. An overall organisational approach with the application of appropriate management philosophies, tools and techniques can only solve the problem. The present study establishes a methodology for achieving success in implementing projects using a business process re-engineering (BPR) framework. Internal performance characteristics are introspected through condition diagnosis that identifies and prioritises areas of concern requiring attention. Process re-engineering emerges as a most critical area for immediate attention. Project process re-engineering is carried out by eliminating non-value added activities, taking up activities concurrently by applying information systems rigorously and applying risk management techniques throughout the project life cycle. The overall methodology is demonstrated through applications to cross country petroleum pipeline project organisation in an Indian scenario.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Presents information on a study which proposed a decision support system (DSS) for a petroleum pipeline route selection with the application of analytical hierarchy process. Factors governing route-selection for cross-country petroleum pipelines; Application of the DSS from an Indian perspective; Cost benefit comparison of the shortest route and the optimal route; Results and findings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Projects exposed to an uncertain environment must be adapted to deal with the effective integration of various planning elements and the optimization of project parameters. Time, cost, and quality are the prime objectives of a project that need to be optimized to fulfill the owner's goal. In an uncertain environment, there exist many other conflicting objectives that may also need to be optimized. These objectives are characterized by varying degrees of conflict. Moreover, an uncertain environment also causes several changes in the project plan throughout its life, demanding that the project plan be totally flexible. Goal programming (GP), a multiple criteria decision making technique, offers a good solution for this project planning problem. There the planning problem is considered from the owner's perspective, which leads to classifying the project up to the activity level. GP is applied separately at each level, and the formulated models are integrated through information flow. The flexibility and adaptability of the models lies in the ease of updating the model parameters at the required level through changing priorities and/or constraints and transmitting the information to other levels. The hierarchical model automatically provides integration among various element of planning. The proposed methodology is applied in this paper to plan a petroleum pipeline construction project, and its effectiveness is demonstrated.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Completing projects faster than normal is always a challenge as it often demands many paradigm shifts. Globalization opportunities and competition from private sectors and multinationals are forcing the management of public sector organizations in India's petroleum industry to take various aggressive strategies to maintain profitability. These projects are required to be completed sooner than with a typical schedule to remain competitive, get faster return on investment and give longer project life.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Strategic sourcing plays an important role in organisations' performance. Strategic sourcing has been researched extensively using empirical studies as well as review work, such as strategic sourcing importance, issues and challenges, processes, source selection criteria and framework. However, there is no research on critical success factors for strategic sourcing specific to industry and country. This research aims to qualitatively evaluate and understand the current role of strategic sourcing, the critical success factors for business performance and its relationship with strategic sourcing, and strategic supplier evaluation criteria from multiple stakeholders' perspectives specific to industry and country. This research studies twenty organisations from Germany and the United Kingdom (UK) covering two industry sectors - electronics manufacturing and construction. We consider five organisations from each industry sector and each country. The findings from twenty case studies reveal comparative analysis of strategic sourcing practices of two countries and two industries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Integrated supplier selection and order allocation is an important decision for both designing and operating supply chains. This decision is often influenced by the concerned stakeholders, suppliers, plant operators and customers in different tiers. As firms continue to seek competitive advantage through supply chain design and operations they aim to create optimized supply chains. This calls for on one hand consideration of multiple conflicting criteria and on the other hand consideration of uncertainties of demand and supply. Although there are studies on supplier selection using advanced mathematical models to cover a stochastic approach, multiple criteria decision making techniques and multiple stakeholder requirements separately, according to authors' knowledge there is no work that integrates these three aspects in a common framework. This paper proposes an integrated method for dealing with such problems using a combined Analytic Hierarchy Process-Quality Function Deployment (AHP-QFD) and chance constrained optimization algorithm approach that selects appropriate suppliers and allocates orders optimally between them. The effectiveness of the proposed decision support system has been demonstrated through application and validation in the bioenergy industry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Renewable energy forms have been widely used in the past decades highlighting a "green" shift in energy production. An actual reason behind this turn to renewable energy production is EU directives which set the Union's targets for energy production from renewable sources, greenhouse gas emissions and increase in energy efficiency. All member countries are obligated to apply harmonized legislation and practices and restructure their energy production networks in order to meet EU targets. Towards the fulfillment of 20-20-20 EU targets, in Greece a specific strategy which promotes the construction of large scale Renewable Energy Source plants is promoted. In this paper, we present an optimal design of the Greek renewable energy production network applying a 0-1 Weighted Goal Programming model, considering social, environmental and economic criteria. In the absence of a panel of experts Data Envelopment Analysis (DEA) approach is used in order to filter the best out of the possible network structures, seeking for the maximum technical efficiency. Super-Efficiency DEA model is also used in order to reduce the solutions and find the best out of all the possible. The results showed that in order to achieve maximum efficiency, the social and environmental criteria must be weighted more than the economic ones.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The main aim of this research is to demonstrate strategic supplier performance evaluation of a UK-based manufacturing organisation using an integrated analytical framework. Developing long term relationship with strategic suppliers is common in today's industry. However, monitoring suppliers' performance all through the contractual period is important in order to ensure overall supply chain performance. Therefore, client organisations need to measure suppliers' performance dynamically and inform them on improvement measures. Although there are many studies introducing innovative supplier performance evaluation frameworks and empirical researches on identifying criteria for supplier evaluation, little has been reported on detailed application of strategic supplier performance evaluation and its implication on overall performance of organisation. Additionally, majority of the prior studies emphasise on lagging factors (quality, delivery schedule and value/cost) for supplier selection and evaluation. This research proposes both leading (organisational practices, risk management, environmental and social practices) and lagging factors for supplier evaluation and demonstrates a systematic method for identifying those factors with the involvement of relevant stakeholders and process mapping. The contribution of this article is a real-life case-based action research utilising an integrated analytical model that combines quality function deployment and the analytic hierarchy process method for suppliers' performance evaluation. The effectiveness of the method has been demonstrated through number of validations (e.g. focus group, business results, and statistical analysis). Additionally, the study reveals that enhanced supplier performance results positive impact on operational and business performance of client organisation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the contemporary business environment, to adhere to the need of the customers, caused the shift from mass production to mass-customization. This necessitates the supply chain (SC) to be effective flexible. The purpose of this paper is to seek flexibility through adoption of family-based dispatching rules under the influence of inventory system implemented at downstream echelons of an industrial supply chain network. We compared the family-based dispatching rules in existing literature under the purview of inventory system and information sharing within a supply chain network. The dispatching rules are compared for Average Flow Time performance, which is averaged over the three product families. The performance is measured using extensive discrete event simulation process. Given the various inventory related operational factors at downstream echelons, the present paper highlights the importance of strategically adopting appropriate family-based dispatching rule at the manufacturing end. In the environment of mass customization, it becomes imperative to adopt the family-based dispatching rule from the system wide SC perspective. This warrants the application of intra as well as inter-echelon information coordination. The holonic paradigm emerges in this research stream, amidst the holistic approach and the vital systemic approach. The present research shows its novelty in triplet. Firstly, it provides leverage to manager to strategically adopting a dispatching rule from the inventory system perspective. Secondly, the findings provide direction for the attenuation of adverse impact accruing from demand amplification (bullwhip effect) in the form of inventory levels by appropriately adopting family-based dispatching rule. Thirdly, the information environment is conceptualized under the paradigm of Koestler's holonic theory.