928 resultados para board machine
Resumo:
Iowa Plumber, Mechanical Professional, and Contractor Licensing Board (PMB) submits the following annual budget report to the Iowa State Legislature. Iowa Code 105.9 requires the board to demonstrate that revenues remain within 10% of expenditures over a period of at least three years
Resumo:
Iowa Plumber, Mechanical Professional, and Contractor Licensing Board (PMB) submits the following annual budget report to the Iowa State Legislature. Iowa Code 105.9 requires the board to demonstrate that revenues remain within 10% of expenditures over a period of at least three years
Resumo:
The Watershed Improvement Fund and the Iowa Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The fifteen-member Board conducted seven meetings throughout the year in-person or via teleconference. Meetings were held January 23, February 27, April 17, June 18, July 24, September 25 and December 17. Attachment 1 lists the board members and their organization affiliation. The Board completed one Request For Applications (RFA) for the Watershed Improvement Fund. The RFA was announced November 6, 2014 and closed December 29, 2014. December 29, 2014 Closing Date Request For Applications: The Board received 16 applications in response to this RFA. These applications requested $2.8 million in Watershed Improvement Funds and leveraged an additional $9.1 million for a total of $11.9 million of watershed project activity proposed. After reviewing and ranking the applications individually from this RFA, the Board met and selected eight applications for funding. The eight applications were approved for $1,249,861 of Watershed Improvement Funds. Data on the eight selected projects in this RFA include the following: • These projects included portions of 12 counties. • The $1.2 million requested of Watershed Improvement Funds leveraged an additional $4.2 million for a total of $5.4 million in watershed improvements. • Approved projects ranged in funding from $41,980 to $250,000. Attachment 2 lists the approved projects’ name, applicant name, project length, county or counties where located, and funding amount for the RFA. Attachment 3 is a map showing the status of all projects funded since inception of the program. At the end of 2015 there are 111 completed projects and 39 active projects. In cooperation with the Treasurer of State, the WIRB submitted the 2015 year-end report for the Rebuild Iowa Infrastructure Fund to the Legislative Services Agency and the Department of Management. Attachment 4 contains the 2015 annual progress reports submitted from active projects or projects finished in 2015.
Resumo:
Annual report produced by Iowa Board of Parole
Resumo:
Annual report produced by Iowa Board of Parole
Resumo:
Annual report produced by Iowa Board of Parole
Resumo:
Annual report produced by Iowa Board of Parole
Resumo:
Annual report produced by Iowa Board of Parole
Resumo:
Annual report produced by Iowa Board of Parole
Resumo:
Annual report produced by Iowa Board of Parole
Resumo:
The Iowa General Assembly, during its 2010 legislative session, created a new body, the Public Safety Advisory Board (PSAB). The purpose of the Board is to provide the General Assembly with an analysis of current and proposed criminal code provisions. The mission of this Board is to provide research, evaluation, and data to the General Assembly to facilitate improvement in the criminal justice system in Iowa in terms of public safety, improved outcomes, and appropriate use of public resources.
Resumo:
2013 yea end summary for the Watershed Improvement Fund.
Resumo:
The Iowa Flood Mitigation Program is created within Code of Iowa, Chapter 418. The Program seeks to provide funds for fl ood mitigation projects that otherwise would not be funded. The Flood Mitigation Board is responsible for the implementation of Code of Iowa Chapter 418. The membership of the Board is comprised of four voting public members appointed by the Governor, five voting members representing state agencies, four non-voting ex officio members of the legislature, and one non-voting ex officio member representing a state agency.
Resumo:
Joint Publications from Iowa Engineering Experiment Station - Bulletin No. 190 and Iowa Highway Research Board - Bulletin No. 19. This bulletin is a report on the development of bituminous paving mixtures containing various local materials and asphaltic binders. The laboratory investigations described in this bulletin were performed as part of Iowa Highway Research Board project HR-20, "Treating Loess, Fine Sands, and Limestone Dusts With Liquid Binders." This project was awarded to the Iowa Engineering Experiment Station of Iowa State University in 1952, and continued to June, 1958.
Resumo:
Joint Publications from Iowa Engineering Experiment Station - Bulletin No. 188 and Iowa Highway Research Board - Bulletin No. 17. In the design of highway bridges, the 'static live load is multiplied by a factor to compensate for the dynamic effect of moving vehicles. This factor, commonly referred to as an impact factor, is intended to provide for the dynamic response of the bridge to moving loads and suddenly applied forces. Many investigators have published research which contradicts the current impact formula 1,4,17. Some investigators feel that the problem of impact deals not only with the increase in over-all static live load but that it is an integral part of a dynamic load distribution problem. The current expanded highway program with the large number of bridge structures required emphasizes the need for investigating some of the dynamic behavior problems which have been generally ignored by highway engineers. These problems generally result from the inability of a designer to predict the dynamic response of a bridge structure. Many different investigations have been made of particular portions of the overall dynamic problem. The results of these varied investigations are inevitably followed by a number of unanswered questions. Ironically, many of the unanswered questions are those which are of immediate concern in the design of highway bridges, and this emphasizes the need for additional research on the problem of impact.