965 resultados para affirmative action
Resumo:
Knowing the cost of investment in coastal resources management (CRM) is important especially in understanding the cost of undertaking one and ascertaining whether the outcomes are worth the money spent. In the Philippines, various CRM projects have already been initiated and no studies have tried to account for the total level of investment. This paper provides an estimate of money spent or invested on CRM in the Philippines and examines the investment per km2 of coral reefs.
Resumo:
The magnitude of apparent specific dynamic action (SDA), the maximum rate of oxygen consumption and the length of time that the rate of oxygen uptake remained elevated above the prefeeding level were measured in the Pearl Spot, Etroplus suratensis, fed isonitrous test diets (D 1 - D 4 ) with varying nutrient sources. Irrespective of the diets, the metabolic rate increased immediately after feeding and reached the maximum within 3 to 4 hours. The source of nutrients in the diet significantly altered the magnitude of SDA. It was maximum (91.76% and 129.56%) for those fed on diets D 2 and D 3 and minimum 46.47% and 50.30% for those fed on diets D 1 and D 4 , respectively.
Resumo:
The rural populations of southern Bangladesh are some of the most vulnerable communities in the world to the future impacts of climate change. They are particularly at risk from floods, waterlogged soils, and increasing salinity of both land and water. The objective of this project was to analyze the vulnerability of people in four villages that are experiencing different levels of soil salinity. The study evaluated the strengths and weaknesses of current coping strategies and assessed the potential of an index-based insurance scheme, designed diversification and better information products to improve adaptive capacity.
Resumo:
This is the River Gowy and Thornton Brook improvements: Environmental Action Plan report produced by the Environment Agency in 2000. This Environmental Action Plan relates to the proposals by the Environment Agency to improve the flood defences of land adjacent to the River Gowy, about 3 km east of Ellesmere Port, Cheshire. The purpose of the Environmental Action Plan (EAP) is to provide details of how the issues addressed in the Environmental Statement (ES) will be carried through to the completion of the project. The EAP represents a commitment to the environmental recommendations formulated during the environmental assessment process and should be closely adhered to during the design, construction and post project monitoring o f the works. For any matters that cannot be finalised until during construction the constraints will be detailed in the plan so they are implemented in the contracts.