777 resultados para Project 2004-032-A : Construction Industry Business Environment (CIBE)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sir John Egan’s 1998 report on the construction industry (Construction Task Force 1998) noted its confrontational and adversarial nature. Both the original report and its subsequent endorsement in Accelerating Change (Strategic Forum 2002) called for improved working relationships—so-called ‘integration’—within and between both design and construction aspects. In this paper, we report on our observations of on-site team meetings for a major UK project during its construction phase. We attended a series of team meetings and recorded the patterns of verbal interaction that took place within them. In reporting our findings, we have deliberately used a graphical method for presenting the results, in the expectation that this will make them more readily accessible to designers. Our diagrams of these interaction patterns have already proved to be intuitively and quickly understood, and have generated interest and discussion among both those we observed and others who have seen them. We noted that different patterns of communication occurred in different types of meetings. Specifically, in the problem-solving meeting, there was a richness of interaction that was largely missing from progress meetings and technical meetings. Team members expressed greater satisfaction with this problem-solving meeting where these enriched exchanges took place. By making comparisons between the different patterns, we are also able to explore functional roles and their interactions. From this and other published evidence, we conclude that good teamworking practices depend on a complex interplay of relations and dependencies embedded within the team.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Choosing a project manager for a construction project—particularly, large projects—is a critical project decision. The selection process involves different criteria and should be in accordance with company policies and project specifications. Traditionally, potential candidates are interviewed and the most qualified are selected in compliance with company priorities and project conditions. Precise computing models that could take various candidates’ information into consideration and then pinpoint the most qualified person with a high degree of accuracy would be beneficial. On the basis of the opinions of experienced construction company managers, this paper, through presenting a fuzzy system, identifies the important criteria in selecting a project manager. The proposed fuzzy system is based on IF-THEN rules; a genetic algorithm improves the overall accuracy as well as the functions used by the fuzzy system to make initial estimates of the cluster centers for fuzzy c-means clustering. Moreover, a back-propagation neutral network method was used to train the system. The optimal measures of the inference parameters were identified by calculating the system’s output error and propagating this error within the system. After specifying the system parameters, the membership function parameters—which by means of clustering and projection were approximated—were tuned with the genetic algorithm. Results from this system in selecting project managers show its high capability in making high-quality personnel predictions

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The capability to automatically identify shapes, objects and materials from the image content through direct and indirect methodologies has enabled the development of several civil engineering related applications that assist in the design, construction and maintenance of construction projects. Examples include surface cracks detection, assessment of fire-damaged mortar, fatigue evaluation of asphalt mixes, aggregate shape measurements, velocimentry, vehicles detection, pore size distribution in geotextiles, damage detection and others. This capability is a product of the technological breakthroughs in the area of Image and Video Processing that has allowed for the development of a large number of digital imaging applications in all industries ranging from the well established medical diagnostic tools (magnetic resonance imaging, spectroscopy and nuclear medical imaging) to image searching mechanisms (image matching, content based image retrieval). Content based image retrieval techniques can also assist in the automated recognition of materials in construction site images and thus enable the development of reliable methods for image classification and retrieval. The amount of original imaging information produced yearly in the construction industry during the last decade has experienced a tremendous growth. Digital cameras and image databases are gradually replacing traditional photography while owners demand complete site photograph logs and engineers store thousands of images for each project to use in a number of construction management tasks. However, construction companies tend to store images without following any standardized indexing protocols, thus making the manual searching and retrieval a tedious and time-consuming effort. Alternatively, material and object identification techniques can be used for the development of automated, content based, construction site image retrieval methodology. These methods can utilize automatic material or object based indexing to remove the user from the time-consuming and tedious manual classification process. In this paper, a novel material identification methodology is presented. This method utilizes content based image retrieval concepts to match known material samples with material clusters within the image content. The results demonstrate the suitability of this methodology for construction site image retrieval purposes and reveal the capability of existing image processing technologies to accurately identify a wealth of materials from construction site images.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The amount of original imaging information produced yearly during the last decade has experienced a tremendous growth in all industries due to the technological breakthroughs in digital imaging and electronic storage capabilities. This trend is affecting the construction industry as well, where digital cameras and image databases are gradually replacing traditional photography. Owners demand complete site photograph logs and engineers store thousands of images for each project to use in a number of construction management tasks like monitoring an activity's progress and keeping evidence of the "as built" in case any disputes arise. So far, retrieval methodologies are done manually with the user being responsible for imaging classification according to specific rules that serve a limited number of construction management tasks. New methods that, with the guidance of the user, can automatically classify and retrieve construction site images are being developed and promise to remove the heavy burden of manually indexing images. In this paper, both the existing methods and a novel image retrieval method developed by the authors for the classification and retrieval of construction site images are described and compared. Specifically a number of examples are deployed in order to present their advantages and limitations. The results from this comparison demonstrates that the content based image retrieval method developed by the authors can reduce the overall time spent for the classification and retrieval of construction images while providing the user with the flexibility to retrieve images according different classification schemes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Images represent a valuable source of information for the construction industry. Due to technological advancements in digital imaging, the increasing use of digital cameras is leading to an ever-increasing volume of images being stored in construction image databases and thus makes it hard for engineers to retrieve useful information from them. Content-Based Search Engines are tools that utilize the rich image content and apply pattern recognition methods in order to retrieve similar images. In this paper, we illustrate several project management tasks and show how Content-Based Search Engines can facilitate automatic retrieval, and indexing of construction images in image databases.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We obtained four phases of land cover spatial data sets by interpreting MSS images of middle and late 1970s and three phases of TM images of late 1980s, 2004 and 2008 based on field investigation in Three Rivers' Source Region. We analyzed the temporal and spatial characteristics of land cover and macro ecological changes in Three Rivers' Source Region in Qinghai-Tibet plateau since middle and late 1970s. Indicated by land cover condition index change rate and land cover change index, land cover and macroscopical ecological condition degenerated (7090 period Zc -0.63, LCCI -0.58)-obviously degenerated (9004 period, Zc -0.94, LCCI -1.76)-slightly meliorated (0408 period, Zc 0.06, LCCI 0.33). This course was jointly driven by climate change, grassland stocking pressure and implement of ecological construction project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Comfort is, in essence, satisfaction with the environment, and with respect to the indoor environment it is primarily satisfaction with the thermal conditions and air quality. Improving comfort has social, health and economic benefits, and is more financially significant than any other building cost. Despite this, comfort is not strictly managed throughout the building lifecycle. This is mainly due to the lack of an appropriate system to adequately manage comfort knowledge through the construction process into operation. Previous proposals to improve knowledge management have not been successfully adopted by the construction industry. To address this, the BabySteps approach was devised. BabySteps is an approach, proposed by this research, which states that for an innovation to be adopted into the industry it must be implementable through a number of small changes. This research proposes that improving the management of comfort knowledge will improve comfort. ComMet is a new methodology proposed by this research that manages comfort knowledge. It enables comfort knowledge to be captured, stored and accessed throughout the building life-cycle and so allowing it to be re-used in future stages of the building project and in future projects. It does this using the following: Comfort Performances – These are simplified numerical representations of the comfort of the indoor environment. Comfort Performances quantify the comfort at each stage of the building life-cycle using standard comfort metrics. Comfort Ratings - These are a means of classifying the comfort conditions of the indoor environment according to an appropriate standard. Comfort Ratings are generated by comparing different Comfort Performances. Comfort Ratings provide additional information relating to the comfort conditions of the indoor environment, which is not readily determined from the individual Comfort Performances. Comfort History – This is a continuous descriptive record of the comfort throughout the project, with a focus on documenting the items and activities, proposed and implemented, which could potentially affect comfort. Each aspect of the Comfort History is linked to the relevant comfort entity it references. These three components create a comprehensive record of the comfort throughout the building lifecycle. They are then stored and made available in a common format in a central location which allows them to be re-used ad infinitum. The LCMS System was developed to implement the ComMet methodology. It uses current and emerging technologies to capture, store and allow easy access to comfort knowledge as specified by ComMet. LCMS is an IT system that is a combination of the following six components: Building Standards; Modelling & Simulation; Physical Measurement through the specially developed Egg-Whisk (Wireless Sensor) Network; Data Manipulation; Information Recording; Knowledge Storage and Access.Results from a test case application of the LCMS system - an existing office room at a research facility - highlighted that while some aspects of comfort were being maintained, the building’s environment was not in compliance with the acceptable levels as stipulated by the relevant building standards. The implementation of ComMet, through LCMS, demonstrates how comfort, typically only considered during early design, can be measured and managed appropriately through systematic application of the methodology as means of ensuring a healthy internal environment in the building.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines the debate surrounding local versus international sourcing of retail products, particularly food and flowers, in light of the emerging carbon imperative. It begins by examining the Fairtrade market and then examines food miles and carbon impact. The complexity of sourcing decisions when considering both international development issues and the emerging carbon agenda is considered using the case of the cut flower industry

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Poverty alleviation lies at the heart of contemporary international initiatives on development. The key to development is the creation of an environment in which people can develop their potential, leading productive, creative lives in accordance with their needs, interests and faith. This entails, on the one hand, protecting the vulnerable from things that threaten their survival, such as inadequate nutrition, disease, conflict, natural disasters and the impact of climate change, thereby enhancing the poor’s capabilities to develop resilience in difficult conditions. On the other hand, it also requires a means of empowering the poor to act on their own behalf, as individuals and communities, to secure access to resources and the basic necessities of life such as water, food, shelter, sanitation, health and education. ‘Development’, from this perspective, seeks to address the sources of human insecurity, working towards ‘freedom from want, freedom from fear’ in ways that empower the vulnerable as agents of development (not passive recipients of benefaction).

Recognition of the magnitude of the problems confronted by the poor and failure of past interventions to tackle basic issues of human security led the United Nations (UN) in September 2000 to set out a range of ambitious, but clearly defined, development goals to be achieved by 2015. These are known as the Millennium Development Goals (MDGs). The intention of the UN was to mobilise multilateral international organisations, non-governmental organisations and the wider international community to focus attention on fulfilling earlier promises to combat global poverty. This international framework for development prioritises: the eradication of extreme poverty and hunger; achieving universal primary education; promoting gender equality and empowering women; reducing child mortality; improving maternal health; combating HIV/AIDS, malaria and other diseases; ensuring environmental sustainability; and developing a global partnership for development. These goals have been mapped onto specific targets (18 in total) against which outcomes of associated development initiatives can be measured and the international community held to account. If the world achieves the MDGs, more than 500 million people will be lifted out of poverty. However, the challenges the goals represent are formidable. Interim reports on the initiative indicate a need to scale-up efforts and accelerate progress.
Only MDG 7, Target 11 explicitly identifies shelter as a priority, identifying the need to secure ‘by 2020 a significant improvement in the lives of at least 100 million slum dwellers’. This raises a question over how Habitat for Humanity’s commitment to tackling poverty housing fits within this broader international framework designed to allievate global poverty. From an analysis of HFH case studies, this report argues that the processes by which Habitat for Humanity tackles poverty housing directly engages with the agenda set by the MDGs. This should not be regarded as a beneficial by-product of the delivery of decent, affordable shelter, but rather understood in terms of the ways in which Habitat for Humanity has translated its mission and values into a participatory model that empowers individuals and communities to address the interdependencies between inadequate shelter and other sources of human insecurity. What housing can deliver is as important as what housing itself is.

Examples of the ways in which Habitat for Humanity projects engage with the MDG framework include the incorporation of sustainable livelihoods strategies, up-grading of basic infrastructure and promotion of models of good governance. This includes housing projects that have also offered training to young people in skills used in the construction industry, microfinanced loans for women to start up their own home-based businesses, and the provision of food gardens. These play an important role in lifting families out of poverty and ensuring the sustainability of HFH projects. Studies of the impact of improved shelter and security of livelihood upon family life and the welfare of children evidence higher rates of participation in education, more time dedicated to study and greater individual achievement. Habitat for Humanity projects also typically incorporate measures to up-grade the provision of basic sanitation facilities and supplies of safe, potable drinking water. These measures not only directly help reduce mortality rates (e.g. diarrheal diseases account for around 2 million deaths annually in children under 5), but also, when delivered through HFH project-related ‘community funds’, empower the poor to mobilise community resources, develop local leadership capacities and even secure de facto security of tenure from government authorities.

In the process of translating its mission and values into practical measures, HFH has developed a range of innovative practices that deliver much more than housing alone. The organisation’s participatory model enables both direct beneficiaries and the wider community to tackle the insecurities they face, unlocking latent skills and enterprise, building sustainable livelihood capabilities. HFH plays an important role as a catalyst for change, delivering through the vehicle of housing the means to address the primary causes of poverty itself. Its contribution to wider development priorities deserves better recognition. In calibrating the success of HFH projects in terms of units completed or renovated alone, the significance of the process by which HFH realises these outcomes is often not sufficiently acknowledged, both within the organisation and externally. As the case studies developed in the report illustrate, the methodologies Habitat for Humanity employs to address the issue of poverty housing within the developing world, place the organisation at the centre of a global strategic agenda to address the root causes of poverty through community empowerment and the transformation of structures of governance.

Given this, the global network of HFH affiliates constitutes a unique organisational framework to faciliate sharing resources, ideas and practical experience across a diverse range of cultural, political and institutional environments. This said, it is apparent that work needs to be done to better to faciliate the pooling of experience and lessons learnt from across its affiliates. Much is to be gained from learning from less successful projects, sharing innovative practices, identifying strategic partnerships with donors, other NGOs and CBOs, and engaging with the international development community on how housing fits within a broader agenda to alleviate poverty and promote good governance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The mining/quarrying industry is a sector of industry where there are very few Life Cycle Assessment (LCA) tools, and where the role of LCA has been poorly investigated. A key issue is the integration of three inter-dependent life cycles: Project, Asset and Product. Given the unique features of mining LCAs, this Note from the Field presents a common methodology implemented within the Sustainable Aggregates Resource Management (SARMa) Project (www.sarmaproject.eu) in order to boost adoption of LCA in the aggregate industry in South Eastern Europe. The proposed methodology emphasises the importance of resource efficiency and recycling in the context of a Sustainable Supply Mix of aggregates for the construction industry. Through its adoption, aggregate producers, recyclers, and governmental planners would gain confidence with LCA tools and conduct consistent and meaningful life cycle analyses of natural and recycled aggregates. © 2011 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is continuing to evolve and develop as the construction industry progresses towards level 2 maturity. However, one of the core barriers in this progression is the aspect of interoperability between software packages. This research and paper stems from a Knowledge Transfer Partnership (KTP) where both industry and academia come together to address this shortcoming within the sector. One of the core objectives of this partnership and the aim of this study is investigating potential solutions to this barrier, while also developing best working practices to be applied in industry. Using one of the case studies from this partnership (a temporary steel structure), this paper demonstrates a potential solution to addressing interoperability within structural analysis and detailing packages, MasterSeries and Revit respectively. The findings of the research indicate that a process based approach rather than that of additional software coding as being the preferred solution. The results of this preliminary research will aid in the development of the topic of interoperability within the sector, while also developing the knowledge and competencies of the parties within the KTP. The findings are explored further, by providing an overview of the resolution process adopted in this case study, in overcoming the interoperability that arose as the project progressed. It is envisaged that this study will assist the construction sector and its adoption of BIM technologies, while also addressing the critical aspect of operability between software.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Early contractor involvement is a topic that has attracted attention from construction practitioners and researchers in the UK since the 1990s. It has been adopted to introduce construction knowledge and experience to the design process, and to integrate design with construction. In contrast with the limited number of previous studies on early contractor involvement, which used case studies, a questionnaire survey was conducted in this study, to investigate the application of early contractor involvement in current practice and its impact on project performance in terms of time, cost and quality. From an analysis of the questionnaire results, early contractor involvement is found to be increasingly used in the construction industry, and to have a significant impact on cost and time performance. This research provides empirical evidence related to the practice of early contractor involvement. It demonstrates the major influence of early contractor involvement on management processes and working relationships during a project, which contribute to performance improvement and project success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry wants graduate employees skilled in relationship building and information technology and communications (ITC). Much of the relationship building at universities has evolved through technology. Government and the ITC industry fund lobby groups to influence both educational establishments and Government to incorporate more ITC in education _ and ultimately into the construction industry. This influencing ignores the technoskeptics’ concerns about student disengagement through excessive online distractions. Construction studies students (n=64) and lecturers (n=16) at a construction university were surveyed to discover the impact of the use and applications of ITC. Contrary to Government and industry technopositivism, construction students and lecturers preferred hard copy documents to online feedback for assignments and marking, more human interface and less technological substitution and to be on campus for lectures and face-to-face meetings rather than viewing on-screen. ITC also distracted users from tasks which, in the case of students, prevented the development of the concentration and deep thinking which a university education should deliver. The research findings are contrary to the promotions of Government, ITC industry and ITC departments and have implications for construction employers where a renewed focus on human communication should mean less stress, fewer delays and cost overruns.